ML17328A849
| ML17328A849 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/08/1991 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M AMERICAN ELECTRIC POWER SERVICE CORP. |
| Shared Package | |
| ML17328A850 | List: |
| References | |
| NUDOCS 9101150024 | |
| Download: ML17328A849 (6) | |
See also: IR 05000315/1990025
Text
Docket Ho. 50-315/@7-g$
Ho. 50-318
American Electric Power Service
Corporation
Company
ATTN: Mr. M. P. Alexich
Vice President
- Nuclear
Operations Division
.1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the routine safety inspection
conducted
by Mssrs.
J.
A. Isom
and
D.
G. Passehl
of this office from November
14, through
December
21,
1990,
of activities at the Donald C.
Cook Nuclear Plant,
Units
1 and 2, authorized
by
HRC Operating
Licenses
No.
and DPR-74.
This also refers to the
discussion
of our findings with Mr. A. A. Blind and others of your staff at
the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined
during
the inspection.
Within these
areas,
the inspection
consisted of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
No violations of HRC requirements
were identified during the course of this
inspection.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter,
and the enclosed
inspection report will be placed
in the
NRC
Public Document
Room.
We wiII gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Brent Clayton, Chief
Reactor Projects
Branch
2
Enclosure:
1. Inspection
Report
Ho. 50-315/90025(DRP);
Ho. 50-316/90025(DRP)
See Attached Distribution
910i150024
9'i0108
ADQC)( P5000355
6
JAN 08
<'.91
American Electric Power Service
Corporation
Distribution
cc w/enclosures:
A. A. Blind, Plant
Manager
DCD/DCB (RIDS)
Licensing
Fee
Management
Branch
Resident Inspector, RIII
James
R. Padgett,
t1ichigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
T. Colburn,
LPM,
RIII ~
Schweibinz
C'(- o7-P'/
RIII
Jo
ensen
7
~(/'
644 466',
(4
0
Cy
~oI
+ 'w-"
o'a*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
799 ROOSEVELT ROAD
GLEN ELLYN; ILLINOIS 60I37
Docket Ho. 50-315
No. 50-316
American Electric Power Service
Corporation
Company
ATTN: Mr. M. P. Alexich
Yice President - Nuclear
Operations
Division
1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the routine safety inspection
conducted
by Mssrs. J.
A. Isom
and
D.
G. Passehl
of this office from November 14, through
December
21, 1990,
of activities at the Donald
C.
Cook Nuclear Plant, Units
1 and 2, authorized
by
NRC Operating
Licenses. No.
This also refers to the
discussion of our findings with Hr. A. A. Blind and others of your staff at
the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection
consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
No violations of NRC requirements
were identified during the course of this
inspection.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter,
and the enclosed
inspection report will be placed in the
NRC
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Brent Clayton, Chief
Reactor Projects
Branch
2
Enclosure:
1. Inspection
Report
No. 50-315/90025(DRP);
No. 50-316/90025(DRP)
See Attached Distribution
American Electric Power Service
Corporation
Distribution
cc w/enclosures:
A. A. Blind, Plant Hanager
DCD/DCB (RIDS)
Licensing
Fee Hanagement. Branch
Resident Inspector, RIII
James
R, Padgett,
Hichigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Hichigan Department of
Public Health
T. Colburn,
LPl1,
HRR
0