Docket No. 50-315/'Pp'rI
Docket No. 50-316
Company
ATTN: Mr. Milton P. Alexich
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
This letter refers to .the follow up maintenance
team inspection conducted
by
Mr. Z. Falevits
and others of this office on December
3-7,
1990.
This
inspection covered activities at the Donald C.
Cook Nuclear Plant authorized
by NRC Operating Licenses
No.
The purpose of the
inspection
was to evaluate
progress
in the area of maintenance
since the
maintenance
team inspection
(MTI) that was conducted in December
1989.
The
inspection findings were discussed
with Mr. A. Blind and others of your staff
on December
7,
1990.
The enclosed
copy of our inspection report identifies the areas
examined
during the inspection.
Within these
areas,
the inspection consisted of a
selective
examination of work packages,
procedures,
and representative
records;
in addition, observations
were
made
and interviews were conducted
with your personnel.
During the previously conducted
MTI, the inspectors identified that the areas
in most need of improvement were management
involvement and support of
maintenance,
preventive maintenance
programs,
work control, material
condition, technical support,
and procedures.
During this follow up
inspection,
the
team determined that your actions in response
to the
weaknesses
identified during the'TI were generally good.
Specifically,
the
team noted increased plant and senior management
involvement in the
maintenance
process
which had resulted in the development of a number of
maintenance
improvement programs.
Due to your decision to implement
some of
these
improvements in a slow and deliberate
manner,
we were unable to evaluate
the effectiveness
of a number of the more significant improvements
and timely
positive results of the implementation of these
improvements
were not
obtained.
No violations of NRC requirements
were identified during the course of this
inspection.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC
Public Document
Room.
9101150016 .910108
ADOCK 05000315
G
PDf<
l
Company
gZN
S
ASSI
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
'C
".
4
-(
Enclosure:
Inspection
Reports
No. 50-315/90024(DRS);
No. 50-316/90024(DRS)
cc w/enclosure:
A.
AD Blind, Plant Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident
Inspector,
RIII
James
R. Padgett,
Michigan Public
Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
D,
C.
Cook,
LPH,
Commissioner Curtiss,
OCM/JC
Directors/Division of Reactor Safety
RI, RII, RIV,
RV
T. 0. Martin, Director
Division of Reactor Safety
I
alevi s/lc
12/z7/90
~RI~
Walker
~ /9(
) "t
o
enson
Ring
12/ 5/90
kRfj /9f
I/9
P(g
RIII
Wright
34~~8=
v'~/~i
C,~
Hartin
%~6-
Iliki
TABLE OF CONTENTS
1.0
Principal Persons
Contacted
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
2.0
Licensee Action on Previous Inspection Findings
3
3.0
Inspection Results
~
~
~
4
3.1
Inspection
Purpose
and Method
~
~
~
4
3.2
Review of Plant Operations Historic Data
3.3
Management
Philosophy,
Organization
and Administration
Maintenance Activities
of
~
3.3.1
Maintenance
Philosophy
~
~
~
~
~
~
~
~
4
3.3.2
Management
Organization
and Administration
5
3.3.3
4
Preventive
Maintenance
Program
6
3.3.4
Equipment Identification
3.3.5
Conduct Performance
Measurement
7
3.4
3.4.1
Technical Support
Engineering Support
~
~
~
7
3.4.2
System Engineering
~ g
~
8
3'.3
Maintenance
Engineering
3'.4
Maintenance
Trending
.
8
3.5
Ongoing Maintenance
3.5.1
Ongoing Electrical Maintenance
3'.2
Ongoing Mechanical Maintenance
3.5.3
Ongoing I&C Maintenance
9
ll
12
3.6
Post Maintenance
Testing
12
3.7
QC/QA Involvement
I
3.7.1
QC Involvement in Maintenance
~
~
~
~
~
12
12
3.7.2
QA Audits and Surveillances
13
'xitMeeting
3.7.3
QA Plant/Corporate
In'terface
13
14