ACCELERATED STRIBUTION DEMONSTIM.TION SYSTEM t
REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)
ACCESSION NBR:9010310321 DOC.DATE: 90/10/23 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana a
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 6
05000316 AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION PERKINSPK.E.
Operator Licensing Branch
SUBJECT:
Responds to Generic Ltr 90-07, "Operator Licensing Natl R
Exam Schedule,"
requesting updated info.
I DISTRIBUTION CODE:
A007D COPIES RECEIVED:LTR / ENCL /
SIZE:
D TITLE: Response to Generic Letter 90-07: Operator Licensing National Exam Sc S
NOTES:
RECIPIENT ID CODE/NAME COLBURN,T.
INTERNAL: NRR DLPQ/LOLB RE EXTERNAL: NRC PDR COPIES LTTR ENCL 2
2 2
2 1
1 1
1 RECIPIENT ID CODE/NAME NRR/DOEA NSIC COPIES LTTR ENCL 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'ONTROLDESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL 8
i
~ II ~
Indiana Michigan~
Power Company~
P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC:1038D Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 OPERATOR LICENSING NATIONAL EXAMINATION SCHEDULE (GENERIC LETTER 90-07)
Mr. Kenneth E. Perkins, Jr., Chief Operator Licensing Branch OWFN-10D-22 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 October 23, 1990
Dear Mr. Perkins:
This letter is in response to Generic Letter 90-07 dated August 10, 1990, which requested updated information concerning (1) the number of candidates who will take the operator licensing examination during assigned NRC site visits; (2) the schedule for operator requalification examinati.ons; and (3) the number of candidates expected to participate in the Generic Fundamental Examination Schedule (GFES).
This information is provided for the Cook Nuclear Plant in the attachments to this letter.
This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely M. P. Alexich Vice President ldp Attachments cc:
D.
H. Williams, Jr.
A. A. Blind - Bridgman J.
R. Padgett G. Charnoff A.
BE Davis
- Region III NRC Resident Inspector
- Bridgman NFEM Section Chief
"-'i Iie t 9010310321 901023 PDR ADDCg 05000315 V
PNU
ATTACHMENT 1 TO AEP:NRC:1038D OPERATOR LICENSING EXAMINATION SCHEDULE
OPERATOR LICENSING EXAMINATION SCHEDULE FACILITY Cook Nuclear Plant FY 1991 (10/1/90-9/30/91)
FY 1992 (10/1/91-9/30/92)
NRC REGION III FY 1993 (10/1/92-9/30/93)
FY 1994 (10/1/93-9/30/94) 1.
Assigned Date (GL 89-03)
PRO IISRO Instant PSRO Upgrade
¹SRO Limited 2.
Assigned Date (GL 89-03)
PRO IISRO Instant
¹SRO Upgrade
¹SRO Limited 6/24/91 6/22/92 2
6/21/93 6/20/94 Please indicate initial cold license examinations by placing an asterisk(*)
by the date.
Please indicate examinations intended to exterd an operator's license to a second or subsequent unit with two asterisks
(**).
(For example, if Unit 1
is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "RO 3,5**.")
ATTACHMENT 2 TO AEP:NRC:1038D REQUALIFICATION EXAMINATION SCHEDULE
REQUALIF ICATION EXAt<I HATION SCHEDULE FACiLITY Cook Nuclear Plant FY 1991 (10/1/'90-9/30/91) l.
Date 1/7 FY 1992 (10/1/91-9/30/92) 1/20 NRC REGION FY 1993 (10/1/92-9/30/93) 1/18 FY 1994 (10/1/93-9/30/94) 2.
Date 3.
Date 4.
Date 5.
Date 6.
Date 1/14 1/21 1/28 2/4 2/11 1/27 2/3 2/10 2/17 2/24 1/25 2/1 2/8 2/15 2/22 1/17 1/24 1/31 2/7 2/14
ATTACHMENT 3 TO AEP:NRC:1038D GENERIC FUNDAMENTAL EXAMINATION SCHEDULE (GFES)
PARTICIPATION
4I l
GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FACILITY Cook Nuclear Plant NPC REGION IxI Estimated Number of Candidates OCTOBER 1990 12 FEBRUARY 1991 JUNE 1991 The Generic Fundamental Examination Schedule (GFES) is administered three times a year, on the 'wednesday following the first Sunday in February,
- June, and October.
k m l
~
~ '