Rev to 891227 Application for Amends to Licenses DPR-58 & DPR-74,changing Expiration Date for Unit 2 to 171223
ML17328A650
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/04/1990
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:0930A, AEP:NRC:930A, NUDOCS 9004190028
Download: ML17328A650 (7)


Text

ACCELERATED DLQRIBUTION DEMONSTION SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004190028 DOC.DATE: 90/04/04 NOTARIZED: NO DOCKET g FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana 6 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document. Control Branch (Document Control Desk)

SUBJECT:

Revised application for amends to Licenses DPR-58 6 DPR-74, extending duration of license to 40 yrs.

DISTRIBUTION CODE: A001D TITLE: OR COPXES RECEIVED:LTR Submittal: General Distribution ENCL 'IZE NOTES:

RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1 GIITTER,J. 5 5 XNTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTS B1 1 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SXCB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1" 0 OGC/HDS1 1 0 01 '1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

/

PLEASE HELP US TO REDUCE WASTEl CONTAC1'HE. DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

J g

/( I c ~ C. c ~e,

~ P 1 '5 N q "r h

Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216

à AEP:NRC:0930A Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 PROPOSED LICENSE AMENDMENT YEAR LIFE U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 2055 Attn: T. E. Murley April 4, 1990

Dear Dr. Hurley:

On December 27, 1989 we submitted AEP:NRC:0930, which constituted an application for amendment to the Facility Operating License for the Donald C. Cook Nuclear Plant Units 1 and 2. Specifically, we proposed to extend the duration of this license to 40 years from the date of issuance of the full-power license.

The purpose of this letter is to revise our previous submittal.

Namely, we request that the expiration date of the Facility Operating License for Donald C. Cook Nuclear Plant Unit 2 be changed from December 25, 2017 to December 23, 2017. The attachment to this letter contains the revised pages from Attachments 1 and 2 of our previous submittal.

This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely H. P. Alexich Vice President ldp Attachment 900419'002S 900404 PDR ADGCK 05000316 P PDC POD/

'J)

Dr. T. E. Murley AEP:NRC:0930A cc: D. H. Williams, Jr.

A. A. Blind - Bridgman R. C. Callen G. Charnoff A. B. Davis - Region III NRC Resident Inspector - Bridgman NFEM Section Chief

y

~ ~ ~

ATTACHMENT TO AEP:NRC:0930A REVISED PAGES OF ATTACHMENTS 1 AND 2 OF AEP:NRC:0930

~ Docket No. 316 Page 8 of 11

>* H. Iodine Monitorin Amendment No. 34 The licensee sha 11 implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.

This program shall include the following:

1. Training of personnel,
2. Procedures for monitoring, and
3. Provisions for maintenance of sampling and analysis equipment.
  • x I. In all places of this license, the reference to the Indiana Amendment and Michigan Power Company is deleted and all references to No. 29 "the licensees" is amended to read "the licensee." The intent is to recognize the Indiana and Michigan Electric Company as the sole licensee of the Donald C. Cook Nuclear Plant.

J. In all places of this license, the reference to the Indiana Amendment and Michigan Electric Company is amended to read "Indiana No. 98 Michigan Power Company."

K. STEAM GENERATOR REPAIR PROGRAM Amendment No. 100 (1) The licensee is authorized to repair Unit 2 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Donald C. Cook Nuclear Plant Unit No. 2 Steam Generator Repair Report dated November 7, 1986, as revised through Revision 6, and additional commitments identified in the staff's related Safety Evaluation dated March 8, 1988.

(2) The Technical Specifications identified in Table 3.2-2 of the Steam Generator Repair Report dated November 7, 1986, as revised through Revision 6 dated February 18, 1988, will not be applicable during the repair program.

For purposes of Technical Specification applicability, the Steam Generator Repair Project will begin when the last fuel assembly from the Unit 2 core is placed in the spent fuel pool and will end when the first fuel assembly is removed from the spent fuel pool to refuel the Unit 2 core.

Amendment 3. This license is effective as of the date of issuance and No. shall expire at midnight, December 23, 2017.

    • Amendment 29 - Changed G to H, H to I, and added a new G; Amendment 34 - Changed H to 3, added a new H and K; Amendment 52 Deleted G, Changed H to G, and K to H; Amendment 14 added H.

Attachment to AEP:NRC:0930A Page 1 1.0 Descri tion'of Pro osed Amendment Currently, the Donald C. Cook Nuclear Plant units are licensed to operate for 40 years from the date of issuance of the construction permit on March 25, 1969. The licenses will expire on March 25, 2009. The purpose of this submittal is to request a 40-year operating term from the date of issuance of the full power licenses, i.e., October 25, 1974 for Unit 1 and December 23, 1977 for Unit 2.

The new proposed dates are 40 years from the above d'ates, i.e.,

October 25, 2014 and December 23, 2017, respectively.

2.0 Justification of Chan e Currently the duration of all nuclear power reactor licenses is restricted to 40 years. Section 103.C of the Atomic Energy Act specifies that a license is to be issued for a period not. exceeding 40 years. In addition, 10 CFR 50.51 states that each license will be issued for a fixed period of time not to exceed 40 years from the date of issuance.

Prior to 1982, the Commission granted operating licenses (OL) with the date of expiration linked to the issuance date of. the construction permit. However, this practice was modified when Commonwealth Edison Company was granted an OL for LaSalle Unit 1 for a full term of 40 years commencing with the issuance of the full-power license.

The Commission extended its new practice of granting 40-year OLs to plants licensed prior to 1982 by issuing Baltimore Gas and Electric Company license amendments which changed the OL expiration dates of Calvert Cliffs Units 1 and 2 to extend the duration of both licenses to 40 years from the date of issuance of the OL. Since the Commission granted the Calvert Cliffs amendments on May 1, 1985, similar amendments have been granted to Point Beach 1 and 2, Indian Point 2, Oconee 1, 2 and 3, Crystal River 3, Hatch 1 and 2, St. Lucie 1, Farley 1 and 2, Surry 1 and 2, North Anna 1 and 2, Haddam Neck, Millstone 1, FitzPatrick, Yankee Rowe, Kewaunee, Beaver Valley 1, Browns Ferry 1, 2 and 3, McGuire 1 and 2, Prairie Island 1 and 2, Sequoyah 1 and 2.

The operating licenses for the Donald C. Cook Nuclear Plant Units 1 and 2 are similar to those of these plants in that they were all issued prior to 1982 and their licensed 40-year lifetime originally started from the date of issuance of their construction permits.

This amendment request is to modify the licenses of the Cook Nuclear Plant in the same manner that was granted to these units'icenses.

That is, to extend the duration of the licenses to 40 years starting from the date of issuance of the full power licenses. The current licenses represent an operating license term of 34 years, 5 months for Unit 1 and 31 years, 3 months for Unit 2.