ML17328A438
| ML17328A438 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/06/1990 |
| From: | Pierson R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17328A439 | List: |
| References | |
| NUDOCS 9009130068 | |
| Download: ML17328A438 (5) | |
Text
gP,N REOII Po I'y
~c 0
vy P
Y/
pip
+0~
++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA MICHIGAN POllER COMPANY DOCKET NO. 50-315 DONALD C.
COOK NUCLEAR PLANT UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 'i49 License No.
DPR-58 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
C.
D.
The application for amendment by Indiana Michigan Power Company (the licensee) dated February 9, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the CoIIIIission's rules and regulations set forth in 10
- CFP, Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance
( i) that the activities authorized by this anIendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be coriducted irI compliance with the Commission's regulations; The issuance of this amendment will riot be inimical'to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9009130068 900906 PDR ADOCK 050003i5 P
PDC 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-58 is hereby amended to read as follows:
h i
~lS iti The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 149
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY CONMISSION
Attachment:
Changes to the Technical Specifications Robert Pierson, Director Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation Date of Issuance:
September 6,
1990
ATTACHMENT TO LICENSE AMENDMENT NO. ~
FACILITY OPERATING LICENSE NO. DPR-58 DOCKET NO.'0-315 Pevise Appendix A Technical Specifications by removing the page identified below and inserting the attached page.
The revised page are identified by amendment number and contain marginal lines indicating the area of change.
RENOVE 3/4 7-28 INSERT 3/4 7-28
~
~
I
. PLANT SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.8 All snubbers listed in Table 3.7-4 shall be OPERABLE.
APPLICABILITY:
MODES 1, 2,
3 and 4.
(MODES 5 and 6 for snubbers,located on systems required OPERABLE in those MODES).
ACTION'ith one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.8.c on the supported component or declare the supported system inoperable and follow the appropriate ACTION statement for that system.
SURVEILLANCE RE UIREMENTS 4.7.8 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 4'.5.
a.
Visual Ins ections The first inservice visual inspection.of snubbers shall be per-formed after four months but within 10 months of commencing POWER OPERATION and shall include all snubbers listed in Table 3.7-4. If less than two (2) snubbers are found inoperable during the first inservice visual inspection, the second inservice visual inspection shall be performed 12 months plus or minus 25% from the date of the first inspection.
Otherwise, subsequent visual inspections shall be performed in accordance with the following schedule:
'o.
'Inoperable Snubbers er Ins ection Period Subsequent Visual Ins ection Period+¹ ¹¹ 0
1 2
3,4 5,6,7 8 or more 18 months 12 months 6 months 124 days 62 days 31 days plus or minus 25%
plus or minus 25%
plus or minus 25%
plus, or minus 258 plus or minus 25$
plus or minus 25%
The snubbers may be categorized into two groups:
Those accessible and those inaccessible during reactor operation.
Each group may be inspected independently in accordance with the above schedule.
- The inspection interval shall not be lengthened more than one step at a time.
¹ The provisions of Specification 4.0.2 are not applicable.
¹¹The visual inspection of inaccessible snubbers may be delayed until the end of the Cycle ll refueling outage.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-28 AMENDMENT NO. gf, fN 8P 149
A