Provides Response to NRC Bulletin 88-010, Traceability Update for Molded Case Circuit Breakers Installed in Unit 2.Evaluation Identified 36 Molded Case Circuit Breakers That Could Not Be Traced to Circuit Breaker Mfg
ML17328A085
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/27/1989
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1083B, IEB-88-010, IEB-88-10, NUDOCS 8908020213
Download: ML17328A085 (8)


Text

gC CELE RATED STMBU'n ON DEMONIXTI ON SY SI'EM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8908020213 DOC.DATE: 89/07/27 NOTARIZED: YES DOCKET T$

FACIL:50-315 Donald C.

Cook Nuclear power Plant, Unit 1, Indiana 05000315 50-316 Donald C.

Cook Nuclear power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P.

Indiana Michigan Power.Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.

Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC Bulletin 88-010, "Traceability Update for Molded Case Circuit Breakers Installed in Unit 2."

DISTRIBUTION CODE:

IE21D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin Response 88-10 Nonconforming Molded Case Circuit NOTES:

RECIPIENT ID CODE/NAME PD3-1 LA GIITTER,J.

INTERNAL: AEOD/DOA NRR DOEA/GCB 11 NRR GUILLEN,J NRR STONE,J.C.

NRR/DEST/ADS 7E NRR/DOEA/EAB 11 NRR/DREP/EPB,10 NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL: LPDR NSIC

COPIES, LTTR ENCL 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR GILL,A.S.

NRR POTAPOUS,U NRR/DEST/ADE 8H NRR/DEST/MEB 9H NRR/DOEA/GCB 11 NR LRB12 02 RGN3 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 h

NCtTE 'Io ALL "RIDS" RECIPIEÃIS.

PLEASE HELP US IO REDOCE HASTE CGHZACT IHE DOCXMENZ CONSOL DESKi RDCN Pl-37 (i%I'. 20079)

%0 ELGKQQQR KXHt MNE FR% DIBTRIBUTICN LISTS FOR DOCUMENIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 23 S

A D

D S

Indiana M)ch)pa~

Po'll'll I 01<II)dn)~

lt if

~

< ~

Z INDMNA NICHIGAM POWM AEP:NRC:1083B Donald C.

Cook Nuclear Plant Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 NRC BULLETIN NO. 88-10:

TRACEABILITYUPDATE FOR MOLDED-CASE CIRCUIT BREAKERS INSTALLED IN UNIT 2 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Attn:

T.

E. Murley July 27, 1989

Dear Dr. Murley:

The purpose of this letter is to provide the information requested under Rhporting Requirement l.b of NRC Bulletin No. 88-10 for molded-case circuit breakers installed in Unit 2 that could not be traced to the circuit breaker manufacturer per item 4 of the actions requested.

Action Item 4 requests all addressees who identify less than 80 percent of the stored-spare molded-case circuit breakers traceable to the circuit breaker manufacturer to identify all molded-case circuit breakers purchased between August 1,

1983 and August 1, 1988,, and installed in safety-related applications.

Reporting Requirement l.b. requires a written report that summarizes the total number, manufacturer, model

number, and to the extent possible the procurement chain of those installed circuit breakers identified in Action Item 4 that could not be traced to the circuit breaker manufacturer.

Our previous submittal, AEP:NRC:1083A, "NRC Bulletin No. 88-10:

Report On Action Item Status,"

dated May 16, 1989, described the actions taken in response to NRC Bulletin No. 88-10 for the Donald C.

Cook Nuclear Plant.

Attachment 3 of that submittal provided the number, manufacturer, model number, procurement source(s),

and application of molded-case circuit breakers installed in Unit 1 that could not be traced to the circuit breaker manufacturer.

We also committed to update Attachment 3 with Unit 2 information by July 28, 1989.

The attachment to this letter fulfills our commitment by providing the required information for molded-case circuit breakers installed in Unit 2 that could not be traced to the circuit breaker manufacturer.

,'>9QPO2O2 j ~ 890727 PL)P, I-")DOCK i-) <v~>O315 PDC g~p(

Dr. T.

E. Murley AEP:NRC:1083B Action Item 5 requests holders of operating licenses to replace or to test at least one-half, or all if the total number is less than 75, of the installed circuit breakers that could not be traced to the circuit breaker manufacturer before startup from the first refueling outage beginning after March 1, 1989.

The remaining circuit breakers are requested to be replaced or tested before startup from the second refueling outage beginning after March 1, 1989.

As documented in the attachment to this letter, our evaluation identified 36 molded-case circuit breakers installed in Unit 2 that could not be traced to the circuit. breaker manufacturer.

Per Action Item 5, replacement or testing of these circuit breakers is required before startup from the 1990 Unit 2 refueling outage.

Instead of waiting for the 1990 refueling outage, we have elected to replace all 32 Westinghouse circuit breakers identified in the attachment.

The remaining 4 General Electric circuit breakers will be replaced before startup from the 1990 refueling outage.

Per Action Item 2, an evaluation has been prepared justifying the continued operation of Unit 2 until the 4 General Electric circuit breakers are replaced.

This letter is being submitted under oath pursuant to the provisions of Section

182a, Atomic Energy Act of 1954, as amended.

Sincerely, M. P. Alexich Vice President MPA/eh Attachment cc:

D.

H. Williams, Jr.

W.

G. Smith, Jr.

- Bridgman R.

C. Callen G. Charnoff NFEM Section Chief A. B. Davis

- Region III NRC Resident Inspector

- Bridgman

COUNTY OF FRANKLIN J

Milton P. Alexich, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power

Company, that he has read the forgoing Response to NRC Bulletin No. 88-10:

Traceability Update For Molded-Case Circuit Breakers Installed In Unit 2 and knows the contents thereof; and that said contents are true t'o the best of his knowledge and belief.

Subscribed and sworn to before me this day of 198~.

97iABY PUBLIC Z

.. +t.

R. CAMlNERO Notary Pubhc, State ot Ohio My Comm'eeionbpiree5684 8t 7

ATTACHMENT TO AEP'NRC'1083B

attachment

- Information on Unit 2 molded-case circuit breakers that could not be traced to the circuit breaker manufacturer in Item 4 of the actions requested.

Page 1

manufacturer Total Model Number Number Procurement Source s

guuantit r

~Sstem FB3015

  • Construction Store Room;
  • WESCO:

Ft.

Wayne, IN; Monroeville, PA;
Columbus, OH Air handler for ice condenser Motor heater starter for reactor coolant pump ¹4 Discharge shutoff valve for residual heat removal vent fan Shutoff valve to reactor coolant pump loops ¹1 and ¹4 FB3020 Same as above Ventilation heater for CD diesel generator room Heater for Train B south boric acid storage tank W

FB3030 Same as above Flux wire drive for removable incore reactor instruments Stud guide hoist 'B'or reactor head FB3040 Same as above Spare Spare Vent unit for upper containment quad ¹1 Vent unit for upper containment quad ¹3 FB3050 Same as above Spare Inverter for plant process computer

Page 2

Manufacturer Total Model Number Number Procurement Source s

uantit

~Sstem FB3070 3

Same as above Vent unit for upper containment quad ¹4 Charger for Train B battery Heater (first stage) for upper containment quad ¹4 FB3100 Same as above Exhaust unit for auxiliary building ventilation Welding receptacles for containment tunnel FB3125 Same as above, Control air compressor Auxiliary jacket water heater for CD diesel generator Exhaust fan for auxiliary building ventilation Freeze protection heater for refueling water storage tank FB3150 Same as above Pressurizer heaters

(¹5, ¹6,

¹27)

Pressurizer heaters

(¹43, ¹73,

¹74)

Exhaust unit for auxiliary building ventilation Pressurizer heaters

(¹3, ¹4,

¹25)

Page 3

Manufacturer Model Number Total Number Procurement Source s

uantit

~Setem GE JA3225W 1

TFK(125 amp) 4 Undetermined Solidstate

Controls, Worthington, OM
  • GESCO,
Columbus, OH Charger for plant CD battery Inverters (control room instrumentation distribution)

TOTAL 36

+Verifiable traceability was not obtained