ML17326B442

From kanterella
Jump to navigation Jump to search
Responds to NRC Detailing New Site Access Training Program for NRC Personnel & Contractors.Procedures 12 PMP 2070 TRN.113 & SAO.024 Revised to Assist Timely Orientation & Access to Plant
ML17326B442
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/09/1988
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AEP:NRC:1073, NUDOCS 8809130302
Download: ML17326B442 (4)


Text

<ccrc~~'1Kb>>~MXR5.iQ~~RK<R~R~~~

ACCESSION NBR:8809130302 DOC.DATE: 88/09/09 NOTARIZED:

NO.

DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana 6

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana 6

05000316 AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to 880727 ltr detailing new site access training program for NRC personnel 6 contractors.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT ID CODE/NAME PD3-1 LA STANGiJ INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11

-ABSTRACT REC~E Ol EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-1 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL

, uR.K ><<~

g<E DR(S

~~8

~

se8 6

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL

II t

'I kt

Indiana Michigan ~

Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:1073 Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 NRC INSPECTOR UNFETTERED ACCESS TO DONALD C.

COOK NUCLEAR PLANT U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Attn:

Mr. A. Bert Davis September 9,

1988

Dear Mr. Davis:

This letter is in response to your correspondence of July 27,

1988, detailing a new site access training program for NRC personnel and contractors.

We understand that this program will eventually be implemented on an NRC-wide basis, superseding the current Region III training.

In the interim, until this NRC-wide training program is established, the Region III training program will continue to function as it has in the past, and non-Region III NRC employees and NRC contractors will still be trained by one of the following methods:

(1)

NRC Headquarters office training, (2) training in one of the NRC Regional Offices, or (3) training at a power reactor licensee.

Further on-site training for those persons previously certified by NRC will be completed within approximately one hour of their arrival on-site.

A short course orientation on the site-specific aspects of radiation safety, emergency

response, security and personal safety, will be provided as appropriate.

The following plant procedures have been revised to assist timely orientation and access to Cook Nuclear Plant:

1.

Procedure 12 PMP 2070 TRN.113, General Employee Training (GET) has been revised and approved allowing the Shift Security Supervisor to waive radiation protection and site security GET classes for NRC personnel on the NRC Access List.

The NRC Access List authorizes entry to all radiological areas and represents documentation that listed NRC personnel have received training to warrant such entry.

88091 30302 880909 PDR ADOCK 050003k 5 F

PNU hr g.y<~/Nrr <<+

'gg ting(5/

'Std

Mr. A. Bert Davis AEP:NRC:1073 2.

Procedure SA0.024, NRC Inspector Unfettered Access, was revised to specifically state that documentation of training would be accepted for the purpose of unfettered access.

Attachment 1 to the procedure, Site Specific Security Information, will be provided to the NRC inspector for review.

After indication of sufficient knowledge of security requirements and capability to perform assigned tasks in accordance with Cook Nuclear Plant Policies and Procedures, the inspector will sign Attachment 2 to the procedure, Site Security Training Requirements Waiver.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, M. P.