Text
ACCELERATED D1 STRIBUTION DEMONSTRA'TION SYPXgM REGULATO INFORMATION DISTR BUTZONSTEM (RIDE) 7 g
'ACCESSION NBR:8808020148 DOC.DATE: 88/06/30 NOTARIZED:
NO DOCKET t FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 AUTH.NAME AUTHOR AFFELIATION GAUSDEN,M.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele SMITH,W.G.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
M 1
perating rept for June 1988 for DC Cook Plant.
/880706 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I
ENCL i SIZE:
CO TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 LA STANGFJ INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN3 EXTERNAL: EG&G WILLIAMSFS NRC PDR COPIES LTTR ENCL 1
'0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DREP/RPB 10 EG FI 01 LPDR NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
1 1
1 h
R I
/
h TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
. ~
f
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.
C.
Cook Unit 1
M. Gausden (616) 465-5901 July 6, 1988 1of1 HIGHLIGHTS:
MONTHLY OPERATING ACTIVITIES - JUNE 1988 The unit operated at the 90$ administrative power limit upon entering this reporting period until 1616 on June 6,
- 1988, when a power reduction was started due to a substantial steam leak on the east MSR.
The leak was located at the drain tank vent line elbow connection to the MSR shell.
Power was reduced to 30Ã at 2233, at which time the steam leakage was reduced to an acceptable level for repair.
The leak was repaired and power ascension to 90K performed between 0513 and 1910 on June 9, 1988.
The reporting period ended with the unit operating at its 90K administrative limit.
Gross electrical generation for the month of June was 638,760 MWH.
DETAILS 06-06-88 06-09-88 1616 2233 0513 1910 Comenced power reduction due to the vent line leakage on the east MSR.
Reactor power at 30K.
Power reduction completed.
Repair completed on the vent line.
Power increase started.
Power returned to the 90K administrative limit.
8808020148 880630 PDR ADGCK 05000316 R
PNU
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.
C.
Cook - Unit No.
1 M. Gausden 616 465-5901 1 of 1
MAJOR SAFETY-RELATED MAINTENANCE JUNE 1988 There were no major safety-related maintenance items during the month of June, 1988.
N.R. C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 7/1/88 COMPLETED BY H.B. GILES TELEPHONE 616-465-5901 OPERATING STATUS.,
- 1. Uni.t Name D.
C.
Cook Unit 1 2
~ Reporting Period JUNE 1988
',notes
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1030 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maxi.mum Dependable Capacity (Net MWe) 1020
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
- 11. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen.
(MWH)
- 17. Gross Elect.
Energy Gen.
(MWH) 18.
Net Elect. Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six Ice Condenser su vei llance outa e to be duration of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />.
This Mo.
Yr. to Date 720.0 4367.0 720.0 4314.3 0.0 0.0 720.0 4302.0 0.0 0.0 1987237 12315350 638760 4006040 612837 3850167 100.0
- 98. 5 100.0 98.5 83.4 86.4 82.6 85.6 0.0 0.6 Months (Type, Date,and in on Decembe 16 1 88 f CuIIm; 118319.0 86152.2 463.0 84539.5 321.0 245314348 80150710 77081165 72.7 72.7 65.0 62.9
'.8
~ 0 Duration):
ed
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
UNITQIIITIMllVNSANI)FOlThk RFI)Ill'HONS R~RT gPNTII JUNE WMXaTNO 50-315 C:CIQPIXYKtlIY TfLKFIIONF.
6 465-5901
~
~
I Nr.
Ihtc Ijceusce I'.vent keiurrl 4 Cause h Corrective Aellrus to Prevent Ilccturcncc 270 880606 F
74.94
. A N/A 4
HB PIPEB Reactor power was reduced to 30K to permit repair of a substantial steam leak on the east moisture separator-reheater shell drain tank vent con-nection at the HSR shell.
The cause of the leak was determined to be erosion/corrosion.
A weld irregu-larity was found that may have contributed to the failure.
The vent line was repaired by welding a larger diameter pipe over the damaged pipe.
Reactor power was returned to 90K on 880609.
'I I". Iruccd S: S>>lredtdcd I'tl1l)
Rcasras:
h liqulpusent I'allu>e II:a)dain)
IiLIabitenance ni Teal C.Refuel issue IlR>>ydalruy Restrklhus I Qeratw Trainingk Uecuse IixanKnatirrrs I'.Adutinistsativa 6 Oicrathasal Ftsor Iliyidahs)
II(tilter II."xybin)
Method:
I4Ianual 24Lmual Scraus.
3 hutrunatic Scrwu.
44)ther II!xplaiu) fxhibllC. Instructi sns fol Plciuuatiuu of I)ala I:utry Sheets for ILcns>>e Event Itq~us II.IR) I'l>>INlt)tlG.
OI6I )
Kxhtbll I Sant>> Soui>>>>
AVERAGE DAILY POWER LEVEL (MRe-Net)
DOCKET NO.
50-315 UNIT ONE DATE 7/1/88 COMPLETED BY H.B. GILES TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16
'ONTH AVERAGE DAILY POWER LEVEL 915 918 918 918 918 754 253 252 593 917 915 914 912
- 911, 906 910 JUNE 1988 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL 911 910 908 903 901 896 903 912 905 910 917 913 907 916
Indiana Michigan~
Power Company Cook Nuclear Plant P.O. Box 458 Bridgman. Ml 49106 6I6 465 5901 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 July 6, 1988
~g
~
INOMNA NICHIGAN POWER Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1
Technical Specification 6.9. 1. 10, the attached Monthly Operating Report for the month of June 1988 is submitted.
Sincerely, G.
- mith,
~
~
~
Plant Manager WGS/jd cc:
D.
H. Williams, Jr.
M. P. Alexich R.
W. Jurgensen R.
C. Callen C. A. Erikson D.
W. Paul D.
R.
Hahn J. J.
Markowsky J.
R.
Sampson PNSRC File INPO Records Center ANI Nuclear Engineering Department T.
R. Stephens NRC Region III B. L. Jorgensen S. L. Hall D. A. Timberlake EPRI--Nuclear Safety Analysis Center