SALP Repts 50-315/88-01 & 50-316/88-01 for Oct 1986 - Feb 1988
ML17326B396
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/18/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17326B395 List:
References
50-315-88-01, 50-315-88-1, 50-316-88-01, 50-316-88-1, NUDOCS 8807280223
Download: ML17326B396 (2)


See also: IR 05000315/1988001

Text

APPENDIX

SALP 7

SALP

BOARD REPORT

U. S.

NUCLEAR REGULATORY COMMISSION

REGION III

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

50-315/88001;

50-316/88001

nspection

eport

o.

Indiana Michi an Power

Com an

arne

o

licensee

Donald

C.

Cook Units

1 and

2

arne

o

ac

ty

October 1,

1986 throu

h Februar

29,

1988

ssessment

ergo

SS072S0223

880718

PDR

ADOCK 05000315

PDC

Donald

C.

Cook Facilit

A.

Suomar

of Meetin

with Indiana Michi an Power

Com an

on June

6,

1988

The findings and conclusions of the

SALP Board are documented

in Report

No. 50-315/88001;

50-316/88001

and were discussed

with the licensee

on

June

6, 1988, at the

D. C.

Cook facility.

While the meeting

was primarily a discussion

between

the licensee

and

NRC,

it was

open to members of the public as observers.

The following licensee

and

NRC personnel

were in attendance.

Indiana Michi an

Power

Com an

D. H. Williams, Jr., Senior Executive Vice President - Engineer

and Construction

M. P.

Alexich, Vice President - Nuclear Operations

H.

N. Scherer, Jr., Senior Executive Vice President - Electrical

Engineering

S. J. Brewer, Manager - Nuclear Safety

and Licensing

P. A. Barrett, Director - guality Assurance

W. G. Smith, Plant Manager

A. D. Blind, Assistant Plant Manager

J. Rutkowski, Assistant Plant Manager

L. S. Gi.bson, Assistant Plant Manager

Inde endent

Nuclear Consultant

Herbert Isbin

Nuclear

Re viator

Commission

C. J. Paperiello,

Deputy Regional Administrator

W. L. Axelson, Chief, Projects

Branch 2,

DRP

B. L. Burgess,

Chief, Projects

Section

2A,

DRP

R. Kazmar, Project Inspector,

Reactor Projects

Branch

2A

B. L. Jorgensen,

Senior Resident Inspector,

D. C. Cook

J.

K. Heller, Resident

Inspector,

D. C.

Cook

Nuclear Reactor

Re ulation

(NRR

J. Stang, Project Manager,