ML17326B325
| ML17326B325 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/21/1988 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| AEP:NRC:0980I, AEP:NRC:980I, NUDOCS 8801260565 | |
| Download: ML17326B325 (4) | |
Text
REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR: 8801260565 DOC. DATE: 88/01/21 NOTARIZED:
NO DOCKET FACIL: 50-316 Donald C.
Cook Nuclear Power Plant'nit 2i Indiana 5
05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICHOR M. P.
(Formerly Indiana
- 8. Michigan Ele RECIP. NAME RECIPIENT AFFII IATION Document Control Branch (Document Control Desk>
SUBJECT:
Informs of-completion oF 10CFR50. 59 review on erection Zc installation of new 5 modified single-failure-prooF auxiliary bldg cranes bg 880201. Erection h installation of-cranes sch eduled to begin 880215.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAME PD3-3 LA MIGQINGTONiD INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB NRR/PMAS/ ILRB 01 EXTERNAL:
0 1
1 0
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-3 PD NRR/DEST/ADS NRR/DEBT/MTB NRR/DOEA/TSB OQC/HDS1 RES/DE/EIB NRC PDR COPIES LTTR ENCL 5
5 1
1 1
1 1
0 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 17
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0980I Donald C.
Cook Nuclear Plant Unit 2 Docket No. 50-316 License NO.
DPR-74 ERECTION AND INSTALLATION OF THE NEW AND MODIFIED SINGLE-FAILURE-PROOF AUXILIARYBUILDING CRANES U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley January 21, 1988
Dear Dr. Murley:
As we have discussed with members of your staff we are in the process of completing a 10CFR50.59 review on the erection and installation of the new and modified single-failure-proof auxiliary building cranes.
Upon completion of our review and if no unreviewed safety questions exist we are planning to begin erection and installation of the two cranes.
Both cranes, as Steam Generator steam generator crane except in contingent upon submitted Steam described in the Donald C.
Cook Nuclear Plant Repair Report, are required for use during the repair project.
Operation of the new or modified connection with the erection and installation is your review and approval of our previously Generator Repair Report.
The 10CFR50.59 review will be completed by February 1,
1988, with erection and installation of the cranes scheduled to begin February 15, 1988 as required to support our steam generator repair project schedule.
You or members of your staff are invited to review our 10CFR50.59 review and associated documentation.
880i2605b5 880i2i PDR 'DOCK 050003ib P,
T.
E. Murley AEP:NRC:0980I This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, P. Alexich Vice President edg cc: