ML17326B321

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 870921-1223.Violation Noted:Procedure **1 Thp 6040 PER.352 Not Properly Implemented for Unit 1 on 871006 in That Boron Samples Not Recorded on Form 352-3
ML17326B321
Person / Time
Site: Cook  
Issue date: 01/15/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17326B320 List:
References
50-315-87-28, 50-316-87-28, NUDOCS 8801260153
Download: ML17326B321 (1)


Text

NOTICE OF VIOLATION Indiana Michigan Power Company Docket Nos.

50-315; 50-316 As a result of the inspection conducted on September 21 through December 23,

1987, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1987), the following violation was identified:

Technical Specifications, Section 6.8. 1.C, states that written procedures

covering, among other things, surveillance and test activities of safety related equipment shall be established, implemented and maintained.

Procedure,

"~l THP 6040 PER.352, "Rod Worth Verification Utilizing RCC Bank Interchange,"

involves testing of control rods which are safety related equipment.

Step 8.2.5 of this procedure

states, in part, that four boron samples be obtained and recorded on Form No. 352-3.

Contrary to the above, procedure ""1 THP 6040 PER.352 was not implemented properly for Unit 1 on October 6, 1987, in that the boron samples were not recorded on Form No. 352-3.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required t;o submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

JAN ~S tmS Dated (L'(,

'eoffrey ight, Chief Operations Branch 880i260i53 880003l5 PDR ADOCK 0 PDR