Text
REGULAT INFORMATION DISTRIBUTION, STEM
( RIDS >
ACCESSION NBR: 8801150245 DOC. DATE: 88/Oi/12 NOTARIZED: NO'-
DOCKET 0 FACIL: 50-3ih Donald C.
Cook Nuclear Power Planti Unit 21 indiana 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH1M.P.:
(formerly Indiana 5 Michigan Ele RECIP. NAME
'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Foreards final seismic analysis rept, "Crane Seismic Rept'ask Handling Cranei 150/20 Ton Capacitgi S/N 121151 " Vols I II.Analysis for neuj auxiliary bldg, crane to meet single-F a 1 1 ure-pr oo f rendu irement s o F NUREG-0554.
5+8 DISTRIBUTION CODE:
A0010 COPIES RECEIVED: LTR J ENCL J SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
REC IP lENT ID CODE/NAME PD3-3 LA WIGGINGTON> D.
INTERNAL:'RM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB N
S/ILRB R GFIL 01 EXTERNAL:
LPDR NSIC COPIES LTTR ENCL 1
1 +
1 +
1 1 ~.
RECIPIENT ID CODE/NAME PD3-3 PD NRR/DEST/ADS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDS1 RES/DE/EIB NRC PDR COPIES LTTR ENCL Sm TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL
0 t
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0980H Donald C.
Cook Nuclear Plant Unit 2 Docket No. 50-316 License No.
DPR-74 NEW AUXILIARY'BUILDINGCRANE FINAL SEISMIC ANALYSIS=REPORT U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555 ATTN:
T.
E. Murley Pqnuqry 3.2 3.988
Dear Dr. Murley:
- Enclosed, as requested by your staff, is one copy of the final seismic analysis report entitled, "Crane Seismic Report, Cask Handling Crane, 150/20 Ton Capacity, S/N 12115," Volumes I and II dated September 9,
1987, performed by Whiting Corporation.
This analysis is for the new auxiliary building crane being built to meet the single-failure-proof requirements of NUREG-0554.
This final seismic analysis, which confirms the conclusions of the preliminary seismic analysis provided in Supplement 1 of the Steam Generator Repair Report, demonstrates that the allowable stresses of the principal structural components of the new crane are not exceeded during a design-basis earthquake with a 60 ton load on the main hook.
eSO11SOa~S SeOiaa ~
PDR ADOCN, 0500031'b p
T.
E. Murley AEP'NRC:0980H This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Sincerely,
~ Alex ch Vice President lp cc:
John E. Dolan W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector