ML17326B168

From kanterella
Jump to navigation Jump to search
Confirms 840910 Telcon W/Ol Wigginton Re Submittal of Integrated Leak Rate Test by 841019.Data Reduction for Supplemental Test Revised Due to Incorrect Conversion Factor
ML17326B168
Person / Time
Site: Cook 
Issue date: 09/27/1984
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0901A, AEP:NRC:901A, NUDOCS 8410020161
Download: ML17326B168 (6)


Text

REGULaTORY FORMATION DISTRIBUTION SY EM (RIDS)

ACCESS')N 'BR: 8010020161, DOC a DATE: 80/09/27 NOTARIZED!

NO FACIL:50-316 Donald C.

Cook Nuclear Power Planti Unit<<2~ Indiana 8

05000316 AUTH~ NAME, AU]'HOR AFFILIATION ALEXICHiM<P, Indiana 8 Michigan Electric 'Co, RECIP,NAME RECIPIENT AFFILIATION DENTONrH,RE Office of Nuclear Reactor Regulationi Director

SUBJECT:

Confirms 800910 telcon w/OL W{gginton-re submittal of integrated leak rate test by 841019.Data reductionfor supplemental test revised due to incorrect conversion factor.

DISTRIBUTION CODE:

A017D COPIES RECEIVED:LTRENCL 'I E:l TITLE:

OR Submittal:

Append J Containment Leak Rate Teating, NOTES; OL:12'/23/72'5000316 RECIPIENT ID CODE/NAME NRR ORB1 BC 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME.

COPIES LTTR ENCL" INTERNAL: ADM/LFMB EG LE 1

00 1

ELD/HDS3 08 NRR/DS I/CSB 06 RGN3 EXTERNAL: ACRS NRC PDR NTIS 07 10 1

02 1

LPDR NSIC 03 05

M I i

~ 11 ]

'It<<0 l I1I', gv<<yII), f>>M

>> f

~ Y I

>> "II 1 il 1

)I>>,

l "I'I Mi, I

Mr<<

I I

M)I

>>I M,r

'1 M )I

~

~

1

~

~

frI'I I '"

) ttl>>1, M'I

)4 1'I ia I, 1

I Iti

>It'1 i t'lg>> 'I+ 4 l>>)1 g I <<)t<<f r

M I l

> I

) 1 a r I))1 lit, II

>>'I II

'ii f mM w m~~ eye~ ~, ~

'I I e

M )

INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 September 27, 1984 AEP:NRC:0901A Donald C. Cook Nuclear Plant Unit No.

2 Docket No. 50-316 License No. DPR-74 10 CFR 50, Appendix J REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST REPORT Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

This letter confirms the telephone conservation with Mr.- D. L. Wigginton of your staff on September 10, 1984.

As discussed, we will be submitting our Xntegrated Leak Rate Test (ILRT) Report, which concluded on June 16, 1984, approximately four months after the conduct of the test.

10 CFR 50, Appendix J,Section V.

B requires the ILRT Report to be submitted approximately three months after the conduct of the test.

Certain concerns related to the validity of the supplemental verification portion of the XLRT were raised by NRC Region XXX and required extensive discussions and re-evaluations.

Therefore, we agreed the submittal of the ILRT Report should be delayed until these concerns have been resolved.

Concurrent with the re-evaluations, we discovered an incorrect conversion factor for the supplemental test data.

Accordingly, we revised the data reduction for the supplemental test.

The revised data reduction was transmitted to NRC Region III in letter AEP:NRC:0901, dated September 21, 1984.

Assuming Region III accepts the results of the revised data reduction, we now expect to submit the subject ILRT Report by October 19, 1984.

ol'/

8410020i61 840927 PDR ADOCK 05000316 PDR,

)

at II a,

Mr. Harold Denton AEP:NRC:0901A This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, c

M.

. Al xich Vice President qrO p$ ~.9 MPA/dew cc:

John E. Dolan W. G. Smith, Jr.

Bridgman R. C. Callen G. Charnoff E.

R. Swanson, NRC Resident Inspector Bridgman

1 Ir t

1 E

I' I