ML17326A996

From kanterella
Jump to navigation Jump to search
Advises That Exxon Nuclear Co Reload Fuel Vendor for Facility & Intends to Use Methodology in XN-NF-84-73-(P), Exxon Nuclear Methodology for Pwrs:Analysis of Chapter 15 Events, for Performing Safety Analysis for Future Reloads
ML17326A996
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/18/1985
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0916B, AEP:NRC:916B, NUDOCS 8509240219
Download: ML17326A996 (4)


Text

I.~f' if)

I, r

v

='"-

"'".:NBSOLIATrrNrr..INI ON!VATIOIV= OISTRISIAT ION SYSTF<<v(LIOS)

ACCESSION NoR:8509240219 DuC ~ DATE: 85/09/18 NOTARIZED:

NO FACIL:50-31b Donal d C ~

CooK IVucl ear Power Pl anti Uni t 2s Indiana F

AUTrl~ hAlnk AUTHUP At FILIATION ALEXICHsN,P, Indiana f3 Mqchigan Electric Co ~

.REC IP, NAtlk REC IP ILNl OFF ILIATION DEIVTONg H ~ R ~

Office of Nuclear Reactor Regulations Director

SUBJECT:

Advises that Exxon <<uclear Co reload fuel vendor for facility L intends to use methodology in XN-NF 84-73-(P)s "Exxon Nuclear ioethodology for PNBs:Analysis of Chapter 15 Eventss" for performing safety analysis for future reloads.

DISTRIeUTION CODE:

IE2bD COPlkS RkCEIVEO:LTR g ENCL 4'IZE:

TITLE: Star t-Up Report/ Refueling Repor t (50 Ukt)

NOTES:

OL: 12/23/72 DOCKET 05000316 05000316 REC IPIENT ID CODE/NA4'E NRK (3RB1 BC Ou I NTE Rf4AL:

ACRS 13 NRri/DS I/CPb 12 R'i/DL AHI/4ll(3 09 COP I ES LTTR ENCL RkC IPI ENT ID CODE/NAME IE FILE Oi RGN2/ORSS/EPRPfi COPIES LTTR ENCL EXTERNAL: 24X i4RC PDR 02 1

i 1

1 LPDR t4S I (

03 v5 fP TOTAL NUMBER OF COPIES RE(4UIRkD:

LTTR ENCL

(",)"

'I

')(

l. '

1 th I

>hs

'1 '1

~

('~l

INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 September 18, 1985 AEP:NRC:0916B Donald C. Cook Nuclear Plant Unit No.

2 Docket No.

50<<316 License No. DPR-74 "Exxon Nuclear Methodology for Pressurized Water Reactors:

Analysis of Chapter 15 Events" XN-NF-84-73(P)

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

On August 27,

1985, Exxon Nuclear Company, Inc. transmitted to Dr. C.

O. Thomas, Chief, Standardization S Special Projects

Branch, a

letter (No. RAC:058:85) with the report, XN-NF-84-73-(P)g entitled "Exxon Nuclear Methodology for Pressurized Water Reactors:

Analysis of Chapter 15 Events."

Exxon Nuclear Company, the reload fuel vendor for Donald C. Cook Nuclear Plant Unit 2, intends to use the above-referenced methodology for performing the safety analysis for future reloads.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, ica $ 'l)<8) >

Vice President cm CC John E. Dolan W.

G. Smith, Jr. - Bridgman R. C. Callen G.

Bruchmann G. Charnoff NRC Resident Inspector - Bridgman 8509240219 850918 PDR ADOCK 05000316 P

PDR I

'4

~

~ W Ww'.tc