ML17326A880

From kanterella
Jump to navigation Jump to search
Forwards Updated LERs 79-024/03X-1,79-052/03X-1 & 79-064/03X-1
Date released: 01/17/2020 Download: ML17326A880


Updated LER 79-024/03X-1:on 790326,indicated Position of Rod F-6 Exceeded 12-step Tech Spec 3.1.3.2 Limit.Caused by Wire of Connector to Coil Stack Being Broken & Making Intermittent Contact.Connector Replaced
ML20003G183
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/23/1981
From: Delong S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20003G183 (1)
Updated LER 79-064/03X-1:on 791201,transmitter Blp 141 Found to Be 13% Out of Spec High.Caused by Bellows Fill Fluid Leaking Out Due to Burr on Mounting Beam Surface.Steps Taken by Manufacturer to Modify Assembly Procedures
ML17326A882
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/23/1981
From: Long S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A882 (14)
Updated LER 79-052/03X-1:on 791001,transmitter Blp 142 Found to Have Drifted 7% High During Investigation of High Level Indication for Steam Generator 4.Caused by Bellows Fill Fluid Leaking Out Due to Burr on Mounting Beam
ML17326A881
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/23/1981
From: Delong S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A881 (2)
Forwards Updated LERs 79-024/03X-1,79-052/03X-1 & 79-064/03X-1
ML17326A879
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/23/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A879 (2)