ML17326A554

From kanterella
Jump to navigation Jump to search
Forwards LER 80-008/03L-0
Date released: 05/31/2018 Download: ML17326A554


LER 80-008/03L-0:on 800201,review of 791102 Test Procedure Indicated as-found Data for Loop 1,channel 1,reactor Coolant Flow Transmitter Found 3.8% Out of Calibr.Caused by Transmitter Drift.Transmitter Recalibr
ML17326A556
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/29/1980
From: Delong S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A556 (3)
Forwards LER 80-008/03L-0
ML17326A553
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/29/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A553 (1)