ML17326A253
| ML17326A253 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/13/1979 |
| From: | Dolan J INDIANA MICHIGAN POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:00243, AEP:NRC:243, NUDOCS 7909180396 | |
| Download: ML17326A253 (10) | |
Text
REGULAT'gg~ INFORMATION DISTR IBUTIO 'STEM (R IDS >
ACCESSION NBR: 7909180396 DOC. DATE: 79/09/13 NOTAR'ED:
NO DOCK FACIL: 50-315 Donald C.;Cook Nuclear Power Planti Unit ii Indiana 5
050 0315 50-316 Donald C.
Cook Nuclear Power Planti Unit 2i Indiana 5
0500 AUTH. NAME AUTHOR AFFILIATION DOL~iANi J.~E.
RECIP. NAME RECIPIENT AFFILIATION DENTONI H. R.
Office of Nuclear Reactor Regulation SUBSECT:
Forwards info re scour bed mod program in response to 790713 NRC request. Oversize drawing encl.
DIETRIBVTIQN CDDE:
AOOIB CQPIE8 RECEIVED: LTR Q ENCL Q SIZE:
TITLE: General Distribution for After Issuance of Operating Lic NOTES ACTION:
INTERNAL:
COPIES LTTR ENCL 7
7 REG FI 1
E 15 CORE PERF BR 18 REAC SFTY BR 20 EEB 22 BRINKMAN 1
1
.2 2
1 1
1 1
1 1
1 1
EXTERNAL: 03 LPDR 23 ACRS 1'
16 ih s-E Z C//~S RECIPIENT ID CODE/NAME 05 BC ~KaA l S
TZ): F/
RECIPIENT ID CODE/NAME COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 02 NRC PDR 14 TA/EDO 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS OELD 04 NSIC SEP8 0 t979 4/
gD TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
I
'l
'I
0
'INDIANA & MICHIGAN POWER COMPANY P. Oi BOA 18 BOWLIHG CREEN STATION NEW YORK, N. Y, 100d4 September 13, 1979 AEP:NRC:00243 Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 Scour Bed Modification P1ogram Mr.- Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
In his letter dated July 13, 1979, Mr. A.Schwencer requested infor-mation on four specific i.tems related to the Cook Plant's Scour Bed Modification Program.
Attached is our response to the above request.
JED:em'ery truly yours, ohn =E. Dolan ice President
'cc:
R.
C. Callen G: Charnoff R.
W. Jurgensen D., V. Shaller -Bridgman R.
S.
Hunter RKIJLNL6MMFTFlM MP7
C W
~
"l h
1'l 4
C II C-.,
I,
ATTACHtiENT AEP:NRC:00243
Ztem 1:
0 Descriptions of the condition of the scour beds prior to implementation of corrective actions.
Include a description of the procedures used to assess the. bed condition.
~Res onse:
The condition of the scour bed prior to the implementation of corrective actions was presented to your office in Drawing No. 12-3721, part of our submittal No. AEP:NRC:00170 dated April 6, 1979.
This drawing showed the disruption of the scour bed as well as a hole in the grout apron within the limits of the iceguards.
Attached is a revised drawing which identifies clearly the disrupted areas in front and underneath of the discharge structure.
The cross hatched section represents the disrupted areas.
The scour was iden-tified during a routine underwater visual inspection of the discharge structure and the surrounding area.
The magnitude of the scour was established by reviewing the underwater photographs taken during the above inspection. It was also established that the scour was caused by the high velocities associated with the discharge jets.
Item 2:
A description of the alternatives considered for correcting the scour prdbl@n and bases for the solution chosen.
~Res ense:
s A detailed studv. consistina of a number of alternatives, was conducted to correct 'the then existing condition as well.as to prevent future occurrences.
A summary of the methods studied are given below.
The first method considered was to replace the existing riprap with larger stone to prevent erosion.
The riprap's calculated size proved to be not
- feasible, as riprap is not readily available in the area.
This alternative proved to be impractical.
The second method investigated was to construct the scour bed using inter-locking concrete blocks. This method was not chosen since it requires a
considerable amount of labor, material and time for placement.
A third alternative was to install steel facing.
This method would require the welding of steel sheets together to form a continuous unit.
This scheme requires extensive diver time for the installation and has potential for corrosion.
The method decided upon was to pour tremie concrete within a steel fram work.
A cross-sectional thickness of two feet was used with no reinforcing steel as no shear forces are expected.
This surface, being continuous, will prevent entrainment of any of the surrounding water as well as surface wear and erosion associated with the discharge velocity.
This method was chosen since it was easy to fill the voids under the structure as the concrete is very fluid.
Pouring concrete on the lake bottom was not as costly as placing prefabricated concrete elements and the contractor expressed confidence in the final product if tremie concrete was used,. It was also decided to reconstruct the disrupted area shown in Section Al - Al of the attached drawing, using tremie concrete to prevent similar occurrences in the future.
,I
item 3:
A description of the scour monitoring program including the reasons why the, scour problem was not identified earlier.
~Res onse:
Since late 1974, approximately two scour studies were conducted per year to meet the requirements set forth in Section 4.1.1.4 of the Plant's Appendix echnical Specifications.
In addi tion to thi s study the Uni-versity of Michigan has done some diving inspections in the vicinity of the discharge structures, however, not in the immediate area of the discharge jets.
During all the above studies through the present time no scour was detected by either of the above two procedures.
The operation of the circulating water system since initial criticality prevented any diving inspections of the area
, immediately in front of the discharge jets until late 1977, and the Technical Specification scour study is not sensitive enough to detect scour of the magni-tude which has existed in the past.
The Annual Environmental Reports dis-cussed the results of the studies required by the Appendix 'B'echnical Specifications.
On September 2,
1977 a commercial diving company visually inspected the Unit 1
discharge structure and the area immediately in front of the discharge jets.
During this inspection it was discovered that scour was present in front of the discharge jets.
After an engineering review it was recommended that stone be placed back into the scoured out area.
This recommendation was given on December 12, 1977.
The procedure would require a plant shutdown and good lake conditions for its implementation.
The two conditions were met during the Unit 1 refueling of April, 1978.
After Unit 1 returned to service, and the circulating water system was operational, the discharge area was watched more closely by sounding the immediate area and observation whenever possible.
By the Fall of 1978, it was determined that scour of the immediate area in front of the Unit 1 discharge had again taken place.
'Item 4:
The proposed program to monitor the rebuilt discharge scour bed.
~Res onse:
Periodic underwater visual inspections will be made, weather permitting, on all underwater structures such as'the discharge lines, structures and scour beds to check the damage that may arise from settling, ice accumulation, wear, etc.
The 'discharge area will be watched more closely by conducting sounding studies in the immediate area in front of the discharge jet.
Written reports of the studies and photographs will be made available at the plant for future reference.