Text
~
. ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
CCESSION NBR: 7909110515 DOC. DATE: 79/08/09 NOTARIZED:
NO
'OCKET FACIL: 50-315 Donald C.
Cook Nuclear Power Planti Unit ii Indiana 0
315 50-316 Donald C.
Cook Nuclear Power Plant>
Unit 2 Indiana
'c 05000316 AUTH. NAML=
AUTHOR AFFILIATION DOLAN'. E.
Indiat>a 5 Michigan Power Co..
RECIP. NAME RECIPIENT AFFILIATION DENTON H. R.
Q&fice o P Nuclear'eac tor Regulation
(
SUBJECT:
Forwar'ds Amend 84 to FSAR. Amend revises FSAR in areas of.
auxiliary feedwater sgsi alternate reserve auxiliary
electrical sos Zc waste gas decay tanks.
DISTRIBUTION CODE:
A001S COPIES RECEIVED: LTR 8'ENCL QC5 SIZE.:
TLTLE: Gener'al Distribution Nor After I'ssuance of bperating -Lic waves: +~ED~'-~~ ~
vz..
REC IP IENT COP IES ID CODE/NAME LTTR ENCL T ION:
05 BC ~@H 4f'/
7 7
RECIPIENT ID CODE/NAME COPIES LTTR ENCL TERNAL:
01 REG F'I LE 12 I~~E 15 CORE PLRF 18 REAC SFTY 20 EEH 22 BR INHUMAN TERNAL: 03 LPDR
,23 ACRS 2
2 1
1 1
1 1
1 1
1 1
ih 16
'2 NRC PDR
,14 TA/EDO 17 ENGR BR PLANT SYS BR 21 EFLT TRT SYS OELD 04 NSIC 1
1 1
1 1
1 0
1 1
85P -'PS a ue.
8'R OTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
&9
h
~
INDIANA II MICHIGAN POWER COMP NY P. O. BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. I0004 Donald C.
Cook Nuclear Plant Units No.
1 and 2
Dockets No. 50-315 and 50-316'icenses No.
DPR-58 and DPR-74 FSAR Amendment. No.
84 August 9, 1979 AEP:NRC:00176 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
Th'is letter transmits to your office forty copies of Amendment No.
84 to the Donald C.
Cook Nuclear Plant Final Safety Analysis Report (FSAR).
This amendment consists of revisions of the FSAR on the following topics:
(1)
Modifications being, made to the auxiliary feedwater
- system, (2)
Alternate reserve auxiliary electrical
- system, Xtem (1)
(3)
Results of the main feedwater pipe break
- analysis, (4)
Waste gas decay tanks.
A discussion of these topics follows.
Two sets of modifications are being made to the Auxiliary Feedwater System (AFS):
'a) electrical modifications to the Turbine Driven Auxiliary Feedwater Pump (TDAFP) train in ful-fillment of Unit 2 license condition (3) (k).
The same modifications are being made on both Units.
0 ggggiy05LC Q,'
Mr. Harold R. Denton, Director.
AEP:NRC:00176 b) modifications to provide 'an additional Motor Dr'iven Auxiliary Feedwa'ter'ump (MDAFP) to the Unit 1'nd Unit 2 auxiliary feedwater systems.
The's'e two modifications are 'describe'd below.
- l. a)
TDAFP 1
The TDAFP train of the AFS is being converted from AC power to DC power.
License condition (3)(k) requires that the change to a DC power supply be completed prior to startup following the first scheduled refueling outage of Unit 2.
The electric power supply for the steam admission trip and throttle valve (for steam supply to the Terry turbine which drives the pump) and for the four (4) discharge valves, is being converted to DC power in order to comply with the NRC's position and fulfill license condition (3)(k).
As part of the Engineered Safety Features (ESF)', this power supply must be a
dedicated DC power source such as one of the two safety related station batteries.
- However, when the additional MDAFP is installed as described below in Item 1 b), the use of either of the two existing station batteries for this purpose is no longer possible.
Each of the two MDAFP's in each Unit will be served by its own ESF electrical train and associated station battery.
- Hence, we are installing a third station battery, designated as train N, for each Unit, of the Cook Plant.
This battery will.provide the dedicated DC power source for the TDAFP train in conjunction with the conversion from AC to DC power.
The new train N station battery is considered to be part of the ESF systems at Cook Plant.
- Thus, we will propose Technical Specifications in a separate submittal to include the new train N station battery for both Units 1 and 2.
This part of Amendment 84 to the FSAR is provided as a
general update and for supporting information for the associated Technical Specification change request to be submitted separately.
1 b)
MDAFP At present the operation of the Cook Plant's two MDAFP's is shared between Unit 1 and Unit 2.
One MDAFP is associated with the Unit 1 CD electrical train and the other is associated with the 'Unit 2 CD electrical train.
Mr. Harold R. Denton, Director AEP,:NRC:00176 We 'are. modifying the'AFS at the'Cook'lant to accomplish separation of the shared operation of the'DAFP's by adding another'DAFP to'he
'AFS of each Unit.
The new MDAFP will be associated with the AB el'ectrical train in its res'pective Unit and the shared operation'etween both Units '1 and 2 will be 'el'iminated.
With the present sharing of the'DAFP's, our current Technical Specifications req'uire 'that if one pump is out of service.for morethan 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, both Un'its 1 and 2 be brought. to a shutdown condition until the inoperable pump is resto'red to operable status.
Our modified AFS would require only one Unit 'to be "shutdown under these conditions without affecting operation of the other Unit.
The eco-nomics of modifying the AFS versus the potential downtime of both Units 1 and 2 clearly favor making permanent modifications.
The necessary engineering, design and procurement.is fully underway to perform this modification
'uring the first refueling outage of Unit 2.
During this
- outage, the installation of the train N battery will also be accomplished.
After the modifications, the AFS in each Unit of the Cook Plant will have two (2) MDAFP's and one (1)
Each pump will be associated with a separate electrical train.
The Technical Specification requirements for the AFS operability for each Unit can then be met without reliance on equipment in the other Unit.
We will submit a Technical Specification change request for Unit 2 in a separate submittal to remove the notation which states that the MDAFP's are shared with Unit 1.
This will be included with the forthcoming Technical Specifications proposal regarding battery train N mentioned above in Item 1 a).
This part of Amendment 84 to the FSAR is provided as a general update and for supporting information for the associated Technical Specifications change request to be submitted separately.
The required license amendment
- fee, per the provisions of 10 CFR 170.22 will be transmitted along with the requested revisions to the Techn'ical Specifications.
The FSAR revisions for item 1 a) and 1 b) do not involve an unreviewed safety question as defined in 10 CFR 50.59.
The plant modifications des'cribed above in 1 a) and 1 b) apply to both Units 1 and 2.
The FSAR revisions include changes in Chapter" 8 (Electrical System),
Section 9.8 (Facility Service Systems).,
Section 10.5 (Condensate and Feedwater System),
Section 14.1.9 (Loss of Normal Feedwater Analysis), Appendix C (table of shared systems),
Mr. Harold R. Denton, Director AEP:NRC:00176 Item (2)
Appendix 0 (Postulated Pipe Failure Analysis Outside the Containment),
and response 212.35 in Appendix Q (Licensing Questions regarding Unit 2).
On some of the revised pages additional editorial changes are made to correct typo-graphical errors and minor inconsistencies.
The description of the. alternate reserve auxiliary electrical system is revised to reflect the replacement of a temporary alternate with a permanent one.
The temporary alternate was previously described in Amendment 81 to the FSAR.
This new reserve transformer (No.
- 5) is provided as a full service alternate to the reserve transformer (No. 4) for the purpose of supplying the plant's reserve auxiliary loads.
Reserve auxiliary loads can be supplied by transformer No.
5 or transformer No.
4 in the event either one is out of service.
-This revision is for information only and does not involve a Technical Specification change, a significant hazards considerations or an unrevieWed safety question as defined in 10 CFR '50.59.
- Thus, no facility license amendment is required and the fee schedule in 10 CFR 170 is not applicable.
This revision applies to both Units 1 and 2 and makes changes to-Chapter 8 of the FSAR.
Item (3)
This revision incorporates into the FSAR the results of the analysis of a main feedwater pj.pe rupture inside containment.
These results were previously submitted by a 'letter dated November 28, 1977 from Mx'. J.
A. Tillinghast (IBM Power Company) to Mr. Edison G.
Case (NRC).
Minor editorial changes have been made for the purpose of clarification.
These changes include additional information on page 14.2.8-5 concerning operator action and DNB and the removal of an apparent inconsistency in time period between Section 14.2.8.3 and Table 14.2;8-1.
These minor changes do not affect the conclusion in any way.
Because the information in this part of Amendment 84 was previously submitted, the fee schedule in 10 CFR 170 is not applicable.
This revision applies to Unit 2 only and includes changes
~
to yellow pages in Chapter 14 (Safety Analysis) and.in response 212.8 in Appendix Q.
Item (4)
The value of t;he maximum pressure setpoint for the waste gas decay tanks is reduced from 110 to 100 psig to ease the maximum load on the compressor and the number of gas decay tanks is increased
Mr. Harold R. Denton, Director AEP:NRC:00176 from'ix to eight.
Thi's rev'ision is provided for'nfo'rmation only and does not 'involve a Technical Specification cha'nge or unreviewed safety question.
- Thus, no facility license amendment is required and the fee 'schedule in 10 CFR 170 is not applicable.'his revision applies'o a system shared by both 'Units. and is a change to Section 11.1 (Waste 'Disposal System) of the FSAR, I
Very truly your@,
ohn E. Dolan Vice President JED/js cc:
R.
8 D.
R.
R.
C. Callen Charnoff V. Shaller Bridgman W. Jurgensen S. Hunter Sworn and subscribed to before me this 5'~ day of W~~~~
1979 in New York County, New York Notary Public KAfHLEEVl BARRY NOTARY t'UELIC, State ot New Yak No. 41~606792 Qualitied in C,'u ens County.
Cer'ithaca',o fdad in New Yock Countjj
....en
>U, )98'J