ML17325B598

From kanterella
Jump to navigation Jump to search
Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed
Date released: 05/31/2018 Download: ML17325B598


LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed
ML17325B600
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/20/1999
From: Orourke B
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17325B600 (4)
Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed
ML17325B597
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/20/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17325B597 (2)