ML17325B585

From kanterella
Jump to navigation Jump to search
Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed
Date released: 05/31/2018 Download: ML17325B585


LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised
ML17325B586
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/10/1999
From: Depuydt M
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17325B586 (3)
Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed
ML17325B584
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/10/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17325B584 (4)