ML17325B580

From kanterella
Jump to navigation Jump to search
Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed
Date released: 05/31/2018 Download: ML17325B580


LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared
ML17325B581
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/04/1999
From: Depuydt M
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17325B581 (4)
Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed
ML17325B579
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/04/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17325B579 (4)