ML17325B575

From kanterella
Jump to navigation Jump to search
Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal
Date released: 05/31/2018 Download: ML17325B575


LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design
ML17325B577
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/03/1999
From: Berry L
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
RTR-REGGD-01.045, RTR-REGGD-1.045
Download: ML17325B577 (7)
Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal
ML17325B574
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/03/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.045, RTR-REGGD-1.045
Download: ML17325B574 (2)