MONTHYEARML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17335A5201999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp Unit 1.With 990208 Ltr ML17335A5191999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp,Unit 2.With 990208 Ltr ML17335A4831998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 2.With 990108 Ltr ML17335A4841998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With 990108 Ltr ML17335A3951998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 2.With 981207 Ltr ML17335A3941998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 1.With 981207 Ltr ML17335A3331998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr ML17335A3381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Power,Unit 2.With 981105 Ltr ML17335A2931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 2.With 981005 Ltr ML17335A2941998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 1.With 981005 Ltr ML17335A2131998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 2.W/980903 Ltr ML17335A2151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 1.W/980903 Ltr ML17335A1741998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 2.W/980806 Ltr ML17335A1731998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 Ltr ML17334B8171998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr ML17334B8131998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Station,Unit 1.W/980706 Ltr ML17334A7511998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 2.W/980609 ML17334A7521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 1.W/980609 Ltr ML17334B7921998-04-30030 April 1998 Addendum to Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Station,Unit 2 ML17334B7721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr ML17334B7911998-03-31031 March 1998 Addendum to Monthly Operating Rept for Mar 1998 for DC Cook Nuclear Plant,Unit 2 ML17334B7171998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980407 Ltr ML17334B7181998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980407 Ltr ML17334A6831998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr ML17334A6811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr ML17334B7901998-02-28028 February 1998 Addendum to Monthly Operating Rept for Feb 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6481998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr ML17334B7891998-01-31031 January 1998 Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6051997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2 ML17334A6021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 1.W/980108 Ltr ML17334B6711997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 2.W/971208 Ltr ML17334A6061997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Station,Unit 2 ML17334B6651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1.W/971208 Ltr ML17333B1421997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Donald C Cook Nuclear Plant,Unit 1.W/971110 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17335A5641999-10-18018 October 1999 LER 99-024-00:on 990708,literal TS Requirements Were Not Met by Accumlator Valve Surveillance.Caused by Misjudgement Made in Conversion from Initial DC Cook TS to W Std Ts.Submitted License Amend Request.With 991018 Ltr ML17335A5531999-10-0707 October 1999 LER 99-023-00:on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5481999-09-30030 September 1999 Non-proprietary DC Cook Nuclear Plant Units 1 & 2 Mods to Containment Sys W SE (Secl 99-076,Rev 3). ML17335A5451999-09-28028 September 1999 Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios. ML17326A1291999-09-17017 September 1999 LER 99-022-00:on 990609,electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads,Was Discovered. Caused by Lack of Understanding of Design of Plant.No Immediate Corrective Actions Necessary ML17326A1481999-09-17017 September 1999 Independent Review of Control Rod Insertion Following Cold Leg Lbloca,Dc Cook,Units 1 & 2. ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1121999-08-27027 August 1999 LER 99-021-00:on 990728,determined That GL 96-01 Test Requirements Were Not Met in Surveillance Tests.Caused by Failure to Understand Full Extent of GL Requirements. Surveillance Procedures Will Be Revised or Developed ML17326A1011999-08-26026 August 1999 LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs ML17326A0911999-08-16016 August 1999 LER 99-019-00:on 990716,noted Victoreen Containment Hrrms Not Environmentally Qualified to Withstand post-LOCA Conditions.Caused by Inadequate Design Control.Reviewing Options to Support Hrrms Operability in Modes 1-4 ML17326A0771999-08-0404 August 1999 LER 98-029-01:on 980422,noted That Fuel Handling Area Ventilation Sys Was Inoperable.Caused by Original Design Deficiency.Radiological Analysis for Spent Fuel Handling Accidents in Auxiliary Bldg Will Be Redone by 990830 ML17335A5461999-08-0202 August 1999 Rev 0 to Evaluation of Cook Recirculation Sump Level for Reduced Pump Flow Rates. ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0741999-07-29029 July 1999 LER 99-018-00:on 990629,determined That Valve Yokes May Yield Under Combined Stress of Seismic Event & Static,Valve Closed,Stem Thrust.Caused by Inadequate Design of Associated Movs.Operability Determinations Were Performed for Valves ML17326A0661999-07-26026 July 1999 LER 99-017-00:on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With 990722 Ltr ML17326A0651999-07-22022 July 1999 LER 98-014-03:on 980310,noted That Response to high-high Containment Pressure Procedure Was Not Consistent with Analysis of Record.Caused by Inadequate Interface with W. FRZ-1 Will Be Revised to Be Consistent with New Analysis ML17326A0491999-07-13013 July 1999 LER 99-016-00:on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With 990713 Ltr ML17326A0331999-07-0101 July 1999 LER 99-004-01:on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0151999-06-18018 June 1999 LER 99-014-00:on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified ML17325B6421999-06-0101 June 1999 LER 99-013-00:on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed ML17325B6311999-06-0101 June 1999 LER 99-S03-00:on 990430,vital Area Barrier Degradation Was Noted.Caused by Inadequate Insp & Maint of Vital Area Barrier.Repairs & Mods Were Made to Barriers to Eliminate Degraded & Nonconforming Conditions ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17325B6351999-05-28028 May 1999 LER 99-S02-00:on 990428,vulnerability in Safeguard Sys That Could Allow Unauthorized Access to Protected Area Was Noted. Caused by Inadequate Original Plant Design.Mods Were Made to Wall Opening to Eliminate Nonconforming Conditions ML17265A8231999-05-24024 May 1999 LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made ML17325B6001999-05-20020 May 1999 LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed ML17325B5861999-05-10010 May 1999 LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised ML17325B5811999-05-0404 May 1999 LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared ML17325B5771999-05-0303 May 1999 LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5581999-04-16016 April 1999 LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold ML17325B5471999-04-12012 April 1999 LER 99-009-00:on 990304,as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit Occurred.Cause Investigation for Condition Has Not Been Completed.Update to LER Will Be Submitted,Upon Completion of Investigation ML17325B5321999-04-0707 April 1999 LER 99-S01-00:on 990308,discovered That Lock for Vital Gate Leading to Plant 4KV Switchgear Area Was Nonconforming & Vulnerable to Unauthorized Access.Caused by Inadequate Gate Design & Inadequate Procedures.Mods Are Being Made to Gate ML17325B5161999-04-0101 April 1999 LER 99-007-00:on 981020,calculations Showed That Divider Barrier Between Upper & Lower Containment Vols Were Overstressed.Engineers Are Currently Working on Analyses of Loads & Stress on Enclosures ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5221999-03-29029 March 1999 LER 99-001-00:on 960610,degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations,Identified on 990226.Caused by Inadequate Understanding of Design Basis.Additional Investigations Ongoing ML17325B4801999-03-18018 March 1999 LER 99-004-00:on 971030,failure to Perform TS Surveillance Analyses of Rc Chemistry with Fuel Removed Was Noted.Cause of Event Is Under Investigation.Corrected Written Job Order Activities Used to Control SD Chemistry Sampling ML17325B4741999-03-18018 March 1999 LER 99-005-00:on 940512,determined That Rt Breaker Manual Actuations During Rod Drop Testing Were Not Previously Reported.Caused by Lack of Training.Addl Corrective Actions,Including Preventative Actions May Be Developed ML17325B5671999-03-0202 March 1999 Summary of Unit 1 Steam Generator Layup Chemistry from 980101 to 990218. ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17325B4571999-02-24024 February 1999 LER 99-003-00:on 990107,CR Pressurization Sys Surveillance Test Did Not Test Sys in Normal Operating Condition.Caused by Failure to Recognize Door 12DR-AUX415 as Part of CR Pressure Boundary.Performed Walkdown of Other Doors 1999-09-30
[Table view] |
Text
'
gcc j~RATED 4 ~
DISCIRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:8906120240 DOC.DATE: 89/04/30 NOTARIZED: NO DOCKET N FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Xndiana & 05000316 AUTH. NAME AUTHOR AFFILIATION GILES,H. Indiana Michigan Power Co. (formerly Indi'ana & Michigan Ele SMITH,W.G. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R Monthly operating rept for for Cook Nuclear I
SUBJECT:
Apr 1989 DC Plant Unit 2.W/890504 .ltr. D
~'"'O&IES DXSTRIBUTION CODE: XE24D RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
NO'ZES: '"""
V)7 ENCL SIZE:
RECIPIENT COPIES RECIPIENT COPIES h XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 4 PD3-1 PD 1 1 D STANG,J 1 . 1 D
INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN3 1
1 1
1 1
1
~/DRBP/
@EG FILE
~
MO 1 1
1 1
S EXTERNAL NRC PDR I
EG&G S MPSON i F '1 1 LPDR NSIC 1
1 1
1 1 1
'I
~ Q R
S D
NOIE 10 ALL RIDS" KKlPIEÃIS:
S PLEASE HELP US 10 REDUCE %MTE!
RXN P1-37 (EZT. 20079) M ELXKBQXB IiTSTS HZt DOCUMENTS 'LOU DONiT NEEDf
~
CXMlRCZ 'IHE DlXX3MEÃZ COÃ5L MQR FKH DISTBIBUTIGN DESK, TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20
I I'l'l~ 'l4)F' .'ll'),$ '"(f, q
~
~ ~
~
a t I ll I
'M II 1'
II iI I I
I
't
'I sc h Vg t k
~, ' Indiana Michigan g ~
~I 0 j Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 lNEMS!NA useaamz PQWElR U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 May 4, 1989 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1989 is submitted.
Sincerely, W. G. Smith, Jr.
Plant Manager l<GS/jd cc: B. A. Svensson NRC Region III D. R. Hahn EPRI Nuclear Safety Analysis Center R. C. Callen S. L. Hall INPO Records Center ANI Nuclear Engineering Department D. H. Williams, Jr.
M. P. Alexich J. F. Kurgan J. J. Markowsky D. A. Timberlake D. W. Paul T. 0. Argenta S. H. Steinhart B. L. Jorgensen J. R. Sampson D. S. Climer E. A. Smarrella Dolly Krieger T. R. Stephens 8906i20240 S90430 PDR ADOCK 050003i6 R PDC A(pP I
J
~ ~
.~
'\
~
N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 1-MAY-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2
- 2. Reporting Period APR 89,'notes
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1100
- 6. Maximum Dependable Capacity (GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions. If Any:
This Mo. Yr. to Date Cumm.
- 11. Hours in Report ing Period 719.0 2879.0 99311.0
- 12. No. of Hrs Reactor
~ Was Critical 719.0 1114.4 64709.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 O.D
- 14. Hours Generator on Line 719.0 1064.7 63274.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2288800 3064060 192630437
- 17. Gross Elect. Energy Gen. (MWH) 752650 998530 62894750
- 18. Net Elect. Energy Gen. (MWH) 725838 959650 60544315
- 19. Unit Service Factor 1DO.O 37.0 65.2
- 20. Unit Availability Factor 100.0 37.0 65.2
- 21. Unit. Capacity Factor (MDC Net) 95.2 31.4 58.9
- 22. Unit Capacity Factor (DER Net) 91.8 30. 3 57.4
- 23. Unit Forced Outage Rate 0.0 0.3 14.3
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~ ~ ~
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO. 50-316 UNIT TWO DATE 1-MAY-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 MONTH APR 89 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 894 17 1091 2 1083 18 1095 3 1092 19 1083 4 1093 20 1065 5 1091 21 532 6 1093 22 971 7 1065 23 1097 8 563 24 1101 9 998 25 1106 10 1085 26 1093 11 1084 27 1100 12 1082 28 1100 13 1066 29 1099 14 542 30 1099 15 717 16 1099
~ ~
IIOI:KEYNO.
IINIrSIIIIeIII>WShNnInimu IIaIIIIImINS IlhlK ~ 4 I:fSttLFfEII1y
- hens ggpogg gjjggI APRIL {616) 495-5 o Page 1 of 2s l.leenlce I'xt)N) 4 I'))t teel')e l4tc Iieet)l Aelhnl I>>
Rcp))tl 4 @event IIecnttc)xc 191 890401 4 N/A zz zzzzzz A power reduction from 100'4 reactor thermal power {RTP) to 65% RTP was commenced on 3/31/
in preparation for condenser inspection..
Reactor power reached 65+ RTP at 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br /> on 4/1/89. During the inspection a total of one tube was replugged hnd 50 tubes rerolled in the condensers. The same day at 1345 a power increase was commenced with 10(A RTP being reached at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the same day.
192 890408 N/A zz zzzzzz A power reduction from 100'< RTP to 55+ RTP was commenced on 4/8/89 in preparation to re" move and check the main feedpump condensers for tube leaks. At 0416 hours0.00481 days <br />0.116 hours <br />6.878307e-4 weeks <br />1.58288e-4 months <br /> on 4/9/89 reactor power was at 55% RTP. During the inspection there were no tubes found to be leaking but a diaphragm was replaced along; with some bolts on the manways. A power ascention was commenced on the same day at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />. Reactor power reached 10(A RTP on 4/10/89 at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> after a chemistry hold at 8(A RTP.
I I': I')))cc)I kcxt))n: Nelh)xI: I:XI)i&ICi ~ Inst t>>cl4)nx S: Sai)c)I))'Ie)l h.l'.)Iulptnenl FaQ>>te (I."xp4)n) I.iIxn>>XI I tcilaxl4w )IfI)xta ')ll II LL)bilenxnce t)t Teel 1.NxnnxI Sctxnt. I:nily SI)cclx f))t IL<nlcc f'er)tell>>1 3 h>>l))tn))lie Setxnt. livcnl Rcp))tt II.I:RIIlIc IKIIRI:G.
ll Meg))let)ny Sexi tklh)n 4.0thct Ilixplxi>>I OI6I I I'. Q)ctxl))t I'tain}ag 4 Iiecnxc I xxnlinxl4)n I'-h)1n)initltxlh)e II Ilpctxllllt)xlI:t t))t II:xpL)4)l 1:XI))bil I . Sln)c 4)ulcc I'll7l II I)lbet II'xl)lait)I
ONIr SI IImXWmANn tnt aevll~oIIS INKKKTHo.
~1 II~IE D.C. Cook Unit 2 4 1989
~ ~
IATK N lOQN~DNV T.R. Ste hens REI<okl'MflHYfI APRIL Page 2 of 2 I.Iccntce l'attttt 4 t'<<t teeth<a Ibte liac¹t Acti<at t<<
kent<<tl a ,ttevcnt kcettttcttiz 193 890414 N/A ZZ ZZZZZZ On 4/14/89 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> a power reduction from 100+ RTP to 55% was commenced to remove and check the main feedpumps condensers for tube leaks. Reactor Thermal power reached 55'TP at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br /> on 4/15/89. During"M" the inspection one tube was'replugged on the main feedpump condenser and two tubes were plugged on the "E" main feedpump condenser.
A power ascension was commenced on 4/16/89 to 100+ RTP with the reactor reaching 100@ RTP at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> the same day.
194 890421 0 H N/A ZZ ZZZZZZ On 4/21/89 at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> a power reduction to 55'4 RTP was commenced to remove the main feed pump condensers for tube leak checks'n 4/22/89 at 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> reactor power reached 56<t RTP. A power ascention to 10(A RTP was.
commenced on 4/23/89 at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> after re-placing two plugs in the "E" feedpump condens and one plug in the "M" feedpump condenser.
The unit reaching 100tt RTP at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> the same.day.
I I' I'<<Iced Real<<n: Neth<<<I: Kahn<It fo ~ I¹at tttct4<na S: Schedule<I A I'.<Itgtnent FaQ¹te {I!aplain) l.ihattaI f<<t I tcI<a<ati<<n <tf I>aia II.lbhilenanoa Teal ti W4wttal Sctant.
j.At<i<<tttalle S:ra<n.
Iintty Sheets f<<t la~<<tee l'Rcfttclhtg &cnl kcp<<t t II.I'.RII<iic IHIlkl:li.
Il keg<tlat <tty Rett tk1i<tn 4.lhhct (haplai¹I OI6I)
I:-OI<e<al<<t Italnlagk license I:aa¹tinath<n I'.A<lntinltttat it<tt l I'fIl<e< all <¹tal 4 t<<t II:a p4ht} 1'tthtbit I Satttc S<<ntce
~
II Ol bet l lial<Ialt<I
I DOCKET NO: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: T. R. Stephens TELEPHONE: (616) 465-5901 DATE: May 4, 1989 PAGE: lof2 MONTHLY OPERATING ACTIVITIES - APRIL 1989 HIGHLIGHTS The unit entered the reporting period at 94% rated thermal power (RTP). A power reduction to 65K RTP was underway to remove a condenser half for inspec-tion for possible tube leaks. During the inspection the total of 1 tube was replugged and 50 tubes rolled in the condenser. Following the inspection the unit was taken to 100K RTP which was achieved later the same day 4-1-89. On 4-8-89 a power reduction to to 55% RTP to remove the main feedpumps to check their condensers for possible tube leaks. During the inspection there were no tubes found to be leaking, but a diaphragm was replaced along with some bolts on the manway. Following the inspections the unit was returned to 100K RTP.
On 4-14-89 power was again reduced to allow the removal of the main feed pump to check their condensers for possible tube leaks. During the inspection 1 tube was replugged on the "W" main feedpump condenser and 2 tubes were plugged on the "E" main feedpump condenser. Following the inspection power was returned to 100K RTP. On 4-21-89 power was reduced to 56K RTP to again check the main feedpump condensers. The inspection resulted in 1 tube being re-plugged on the "W" MFP and 2 tubes on the "E" MFP. A power ascention was begun to return the unit to 100% RTP. Full power was achieved on 4-23-89 and remained there for the balance of the reporting period.
DETAILS 4-1-89 0005 Reactor power at 90K RTP.
1015 Starting power reduction to 655 RTP to change out a main feedpump tube oil filter.
1320 Reactor power at 65K RTP.
1345 Starting power ascension to lOOX RTP.
2200 Reactor power at lOOX RTP.
4-5-89 1440 Discovered leak in the north east main turbine oil tank oil cooler. Possible oil leak to Non-Essential Service Water.
1725 Notified NRC via ENS that coast guard notified of oil spill.
4-8-89 2100 Commenced power reduction to 55% in preparation of removing main feed pumps to check feed pump condensers'or debris, and tube leaks.
I II t
4-9-89 0416 Reactor power at 55% RTP.
2110 Started power ascension to lOOX RTP.
4-10-89 0215 Reactor power at 80% RTP and holding for chemistry.
0640 Commencing power ascension to 100K RTP.
1115 Reactor power at 100K RTP.
4-14-89 2200 Started power decrease to 555 RTP in preparation of removing main feedpumps from service and perform main condenser leak checks.
4-15-89 0340 Reactor power at 55% RTP.
4-16-89 1215 Started power ascension to 100% RTP.
2205 Reactor power at 100% RTP.
4-21-89 2205 Began reducing RTP to 55K to remove main feed pump condensers for leak check and debris.
4-22-89 0350 Stopped reactor power at 56K RTP.
4-23-89 0120 Started reactor power increase back to 100K RTP.
1115 Reactor power at 100K RTP.
4 DOCKET NO. 50-316 UNIT NAME D.C.Cook-Unit No. 2 DATE 4. 1999 COMPLETED BY T. R. Ste hens TELEPHONE 616 465-5901 PAGE lof1 MAJOR SAFETY-RELATED MAINTENANCE APRIL 1989 There were no significant safety related maintenance problems reported during the month of April.
'V
~
V' ~
~ ~
II R"