gccj~RATED DISCIRIBUTION DEMONSTRATION SYSTEM 4

~ tt

SUBJECT:

Monthly operating rept for Apr 1989 for DC Cook Nuclear Plant Unit 2.W/890504.ltr.

DXSTRIBUTION CODE:

XE24D TITLE: Monthly Operating NO'ZES: '"""~'"'O&IES RECEIVED:LTR Report (per Tech Specs)

V)7 ENCL SIZE:

RECIPIENT XD CODE/NAME PD3-1 LA STANG,J COPIES LTTR ENCL 4

1 1

RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1

1 INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN3 1

1 2

2 1

1 1

1 1

1 AEOD/DSP/TPAB 1

1 NRR/DLPQ/PEB 10 1

1

~/DRBP/

MO 1

1

@EG FILE

~

1 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:8906120240 DOC.DATE: 89/04/30 NOTARIZED:

NO DOCKET N

FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Xndiana 05000316 AUTH.NAME AUTHOR AFFILIATION GILES,H.

Indiana Michigan Power Co. (formerly Indi'ana

& Michigan Ele SMITH,W.G.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

I D

h D

D S

EXTERNAL EG&G SIMPSON i F NRC PDR

'1 1

1 1

LPDR NSIC 1

1 1

1

~ Q

'I R

S NOIE 10 ALL RIDS" KKlPIEÃIS:

PLEASE HELP US 10 REDUCE %MTE!

. CXMlRCZ 'IHE DlXX3MEÃZ COÃ5L

DESK, RXN P1-37 (EZT. 20079) M ELXKBQXB~ MQR FKH DISTBIBUTIGN IiTSTS HZt DOCUMENTS 'LOU DONiT NEEDf D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

I'l'l~ 'l4)F'

.'ll'),$'"(f, q I

~

~

~

~

I

'M II a

t I

iI ll 1'

I II I

't sc h

Vg I

'I t

k

~,

g

~

0j

~ I Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 lNEMS!NA useaamz PQWElR U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 May 4, 1989 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1989 is submitted.

Sincerely, W.

G. Smith, Jr.

Plant Manager l<GS/jd cc:

B. A. Svensson NRC Region III D. R.

Hahn EPRI Nuclear Safety Analysis Center R. C. Callen S. L. Hall INPO Records Center ANI Nuclear Engineering Department D. H. Williams, Jr.

M. P. Alexich J.

F.

Kurgan J. J. Markowsky D. A. Timberlake D.

W. Paul T. 0. Argenta S.

H. Steinhart B. L. Jorgensen J.

R.

Sampson D. S. Climer E. A. Smarrella Dolly Krieger T. R. Stephens 8906i20240 S90430 PDR ADOCK 050003i6 R

PDC A(pP I

J

~

~

. ~

'\\ ~

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 1-MAY-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period APR 89,'notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1100 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Report ing Period 12.

No. of Hrs

~ Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm. Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH) 18.

Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor 21.

Unit. Capacity Factor (MDC Net)

22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six This Mo.

Yr. to Date 719.0 2879.0 719.0 1114.4 0.0 0.0 719.0 1064.7 0.0 0.0 2288800 3064060 752650 998530 725838 959650 1DO.O 37.0 100.0 37.0 95.2 31.4 91.8

30. 3 0.0 0.3 Months (Type, Date, and Cumm.

99311.0 64709.5 O.D 63274.7 0.0 192630437 62894750 60544315 65.2 65.2 58.9 57.4 14.3 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

~

~

~

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 1-MAY-89 COMPLETED BY H. Giles TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL APR 89 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 894 1083 1092 1093 1091 1093 1065 563 998 1085 1084 1082 1066 542 717 1099 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1091 1095 1083 1065 532 971 1097 1101 1106 1093 1100 1100 1099 1099

IINIrSIIIIeIII>WShNnInimu IIaIIIIImINS ggpogg gjjggI APRIL IIOI:KEYNO.

IlhlK ~

4 I:fSttLFfEII1y hens

{616) 495-5 o

Page 1 of 2s

~

~

l4tc l.leenlce Iieet)l Rcp))tl 4 I'xt)N)4 I'))tteel')e Aelhnl I>>

@event IIecnttc)xc 191 192 890401 890408 4

N/A N/A zz zzzzzz zz zzzzzz A power reduction from 100'4 reactor thermal power

{RTP) to 65% RTP was commenced on 3/31/

in preparation for condenser inspection..

Reactor power reached 65+ RTP at 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br /> on 4/1/89.

During the inspection a total of one tube was replugged hnd 50 tubes rerolled in the condensers.

The same day at 1345 a power increase was commenced with 10(A RTP being reached at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the same day.

A power reduction from 100'< RTP to 55+ RTP was commenced on 4/8/89 in preparation to re" move and check the main feedpump condensers for tube leaks.

At 0416 hours0.00481 days <br />0.116 hours <br />6.878307e-4 weeks <br />1.58288e-4 months <br /> on 4/9/89 reactor power was at 55% RTP.

During the inspection there were no tubes found to be leaking but a diaphragm was replaced along; with some bolts on the manways.

A power ascention was commenced on the same day at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />.

Reactor power reached 10(A RTP on 4/10/89 at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> after a chemistry hold at 8(A RTP.

I I': I')))cc)I S: Sai)c)I))'Ie)l I'll7l kcxt))n:

h.l'.)Iulptnenl FaQ>>te (I."xp4)n)

II LL)bilenxnce t)t Teel f'er)tell>>1 llMeg))let)ny Sexi tklh)n I'.Q)ctxl))t I'tain}ag4 Iiecnxc I xxnlinxl4)n I'-h)1n)initltxlh)e IIIlpctxllllt)xlI:tt))t II:xpL)4)l III)lbet II'xl)lait)I Nelh)xI:

I.iIxn>>XI 1.NxnnxI Sctxnt.

3 h>>l))tn))lie Setxnt.

4.0thct Ilixplxi>>I I:XI)i&ICi ~ Inst t>>cl4)nx

')ll I tcilaxl4w )IfI)xta I:nily SI)cclx f))t IL<nlcc livcnl Rcp))tt II.I:RIIlIc IKIIRI:G.

OI6II 1:XI))bilI. Sln)c 4)ulcc

ONIrSIIImXWmANntnt aevll~oIIS REI<okl'MflHYfIAPRIL INKKKTHo.

~1 II~IE D.C. Cook Unit 2 IATK N

4 1989 lOQN~DNV T.R. Ste hens Page 2 of 2

~

~

Ibte I.Iccntce liac¹t kent<<tl a l'attttt 4 t'<<t teeth<a Acti<at t<<

,ttevcnt kcettttcttiz 193 194 890414 890421 0

H N/A N/A ZZ ZZ ZZZZZZ ZZZZZZ On 4/14/89 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> a power reduction from 100+ RTP to 55% was commenced to remove and check the main feedpumps condensers for tube leaks.

Reactor Thermal power reached 55'TP at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br /> on 4/15/89.

During the inspection one tube was'replugged on the "M" main feedpump condenser and two tubes were plugged on the "E" main feedpump condenser.

A power ascension was commenced on 4/16/89 to 100+ RTP with the reactor reaching 100@ RTP at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> the same day.

On 4/21/89 at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> a power reduction to 55'4 RTP was commenced to remove the main feed pump condensers for tube leak checks'n 4/22/89 at 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> reactor power reached 56<t RTP.

A power ascention to 10(A RTP was.

commenced on 4/23/89 at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> after re-placing two plugs in the "E" feedpump condens and one plug in the "M" feedpump condenser.

The unit reaching 100tt RTP at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> the same.day.

I I' I'<<Iced S: Schedule<I Real<<n:

A I'.<Itgtnent FaQ¹te {I!aplain)

II.lbhilenanoa tiTeal l'Rcfttclhtg

- Ilkeg<tlat <tty Rett tk1i<tn I:-OI<e<al<<t Italnlagk license I:aa¹tinath<n I'.A<lntinltttat it<tt lI'fIl<e< all<¹tal 4 t<<t II:ap4ht}

IIOlbet llial<Ialt<I Neth<<<I:

l.ihattaI W4wttal Sctant.

j.At<i<<tttalle S:ra<n.

4.lhhct (haplai¹I Kahn<It fo ~ I¹attttct4<na f<<t I tcI<a<ati<<n <tfI>aia IinttySheets f<<t la~<<tee

&cnl kcp<<t t II.I'.RII<iicIHIlkl:li.

OI6I) 1'tthtbit I ~ Satttc S<<ntce

I

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.C.

Cook Unit 2 T.

R. Stephens (616) 465-5901 May 4, 1989 lof2 MONTHLY OPERATING ACTIVITIES - APRIL 1989 HIGHLIGHTS The unit entered the reporting period at 94% rated thermal power (RTP).

A power reduction to 65K RTP was underway to remove a condenser half for inspec-tion for possible tube leaks.

During the inspection the total of 1 tube was replugged and 50 tubes rolled in the condenser.

Following the inspection the unit was taken to 100K RTP which was achieved later the same day 4-1-89.

On 4-8-89 a power reduction to to 55%

RTP to remove the main feedpumps to check their condensers for possible tube leaks.

During the inspection there were no tubes found to be leaking, but a diaphragm was replaced along with some bolts on the manway.

Following the inspections the unit was returned to 100K RTP.

On 4-14-89 power was again reduced to allow the removal of the main feed pump to check their condensers for possible tube leaks.

During the inspection 1

tube was replugged on the "W" main feedpump condenser and 2 tubes were plugged on the "E" main feedpump condenser.

Following the inspection power was returned to 100K RTP.

On 4-21-89 power was reduced to 56K RTP to again check the main feedpump condensers.

The inspection resulted in 1 tube being re-plugged on the "W" MFP and 2 tubes on the "E" MFP.

A power ascention was begun to return the unit to 100%

RTP.

Full power was achieved on 4-23-89 and remained there for the balance of the reporting period.

DETAILS 4-1-89 0005 1015 1320 1345 2200 4-5-89 1440 1725 4-8-89 2100 Reactor power at 90K RTP.

Starting power reduction to 655 RTP to change out a main feedpump tube oil filter.

Reactor power at 65K RTP.

Starting power ascension to lOOX RTP.

Reactor power at lOOX RTP.

Discovered leak in the north east main turbine oil tank oil cooler.

Possible oil leak to Non-Essential Service Water.

Notified NRC via ENS that coast guard notified of oil spill.

Commenced power reduction to 55% in preparation of removing main feed pumps to check feed pump condensers'or

debris, and tube leaks.

I II t

4-9-89 0416 2110 4-10-89 0215 0640 1115 4-14-89 2200 Reactor power at 55% RTP.

Started power ascension to lOOX RTP.

Reactor power at 80%

RTP and holding for chemistry.

Commencing power ascension to 100K RTP.

Reactor power at 100K RTP.

Started power decrease to 555 RTP in preparation of removing main feedpumps from service and perform main condenser leak checks.

4-15-89 0340 4-16-89 1215 2205 4-21-89 2205 Reactor power at 55% RTP.

Started power ascension to 100% RTP.

Reactor power at 100%

RTP.

Began reducing RTP to 55K to remove main feed pump condensers for leak check and debris.

4-22-89 0350 4-23-89 0120 1115 Stopped reactor power at 56K RTP.

Started reactor power increase back to 100K RTP.

Reactor power at 100K RTP.

4

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook-Unit No.

2 4.

1999 T.

R. Ste hens 616 465-5901 lof1 MAJOR SAFETY-RELATED MAINTENANCE APRIL 1989 There were no significant safety related maintenance problems reported during the month of April.

~

'VV'

~

~

~

II R"