ML17325B099
| ML17325B099 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/10/1989 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Murley T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17325B101 | List: |
| References | |
| AEP:NRC:0967M, AEP:NRC:967M, NUDOCS 8901190043 | |
| Download: ML17325B099 (5) | |
Text
ACCKMRATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATOR ZNFORMATZON DZSTRZBUTZONQSTEM (RZDS)
ACCESSION NBR:8901190043 DOC.DATE: 89/01/10 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 6
05000315 AUTH.NAME
,AUTHOR AFFILIATION ALEXICH,M.P.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
Document Control Branch (Document Control Desk)
SUBJECT:
Supplemental application for amend to License DPR-58, revising Tech Spec Page 3/4 6-27 to delete Item 2.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR i ENCL I
SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
R r
D RECIPIENT ID CODE/NAME PD3-1 LA STANG,J COPIES LTTR ENCL 1
0 1
1 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 2
2 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB NUD
-ABSTRACT REG FILE EXTERNAL: LPDR NSIC 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 NRR/DEST/ADS NRR/DEST/ESB NRR/DEST/RSB NRR/DOEA/TSB OGC/HDS1 RES/DSIR/EIB NRC PDR 7E 1
1 8D 1
1 8E 1
1 11 1
1 1
0 1
1 1
1 D
~
S NOXE 10 ALL >tRIDS>z RECIPIEhTIS PIZASE HELP US TO MZXJCE HASTE!
CXWI'ACZ 'IHE DOCUMEFZ CXRHRL DESK, RDCN Pl-37 (EXT. 20079)
KO EIQMQQZB MUR NAME HKH DIPZRIBUTIGH LISTS H3R DOCtIMENTS YOU DGNFT NEED!
TOTAL NUMBER OF COPIES REQUIRED:. LTTR 19 ENCL 16
~ W I
Indiana Michigan Power Company
. P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0967M 10 CFR 50 '0 Donald C.
Cook Nuclear Plant Unit 1 Docket No. 50-315 License No.
DPR-58 WITHDRAWAL OF PORTION OF SURVEILLANCE INTERVAL EXTENSION REQUEST (AEP:NRC:0967L)
U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley January 10, 1989
Dear Dr. Murley:
The purpose of this letter is to request withdrawal of a portion of the Technical Specification (T/S) changes requested in our letter AEP:NRC:0967L dated August 9, 1988.
The portion that we are requesting to withdraw consists of those items numbered 2
and 3 in Attachment 1 of the letter.
Letter No. AEP:NRC:0967L proposed four surveillance interval extensions to allow Unit '1 of the Donald C.
Cook Nuclear Plant to continue operation until the upcoming Cycle 10-11 refueling outage.
The requested extensions are for surveillances due between February 26,
- 1989, and March 26, 1989 'owever, items 2
and 3 of our request, which involve ice condenser flow passage inspections and inlet door testing, were performed during an unanticipated outage that occurred between September 7 and September 15, 1988.
The outage was not of sufficient duration to perform the testing involved with items 1 and 4 of our request, which involve ice basket weighing and RTD calibrations.
We have included as an attachment to this letter a revised T/S page 3/4 6-27.
This page had changes related to items 1 and 2 of our letter AEP:NRC:0967L.
The page has been revised to reflect the deletion of item 2, as discussed above.
The proposed revised pages containing the item 3 changes, 3/4 6-30 and 3/4 6-33, are no longer needed and therefore are being withdrawn.
8+>>i~
ppOSi5 PDR
- DOC}( p5pp NU P
P
Dr. T.
E. Murley AEF:NRC:0967M This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M. P. Alexich Vice President ldp cc: