'XCCELERLTED ITRIBUTION DEMONS'lLTION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:8807010042 DOC.DATE: 88/06/20 NOTARIZED: NO DOCKET ig FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Xndiana 05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 0500031,6, AUTH.NAME AUTHOR AFFXLIATION ALEXICH,M.P.
(formerly Indiana
& Michigan Ele i
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Confirms 880413
& 14 agreement to submit updated rept that details compliance w/ Rev 3 of Reg Guide 1.97.
DISTRIBUTION CODE:
A003D COPIES RECEIVED:LTR g ENCL Q SIZE:
TXTLE: OR/Licensing Submittal:
Suppl 1 to NUREG-0737(Generic Ltr 82-33)
NOTES I
D RECIPIENT XD CODE/NAME PD3-1 LA STANG,Z 1
COPXES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 7
7 A
INTERNAL: ARM/DAF/LFMB NUDOCS-ABSTRACT RES/DE/EIB EXTERNAL: LPDR NSIC 1
0 N Q~Q/+FB 10 EG 01 1
1 RES/DRPS DEPY 1
1 NRC PDR 1
1 1
1 1
1 1
1 1
1 R,
D
~
D, C'
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 17
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 R
AEP'NRC'0773AC Donald C.
Cook Nuclear Plant Unit 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 REGULATORY GUIDE 1.97, REV.
3 PLAN TO UPDATE AND CONSOLIDATE INFORMATION U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley June 20, 1988
Dear Dr. Murley:
This letter confirms our agreement made during a meeting on April 13 and 14, 1988, with Mr. John Stang of your staff concerning Cook Nuclear Plant's response to Regulatory Guide (R.G.) 1.97.
We agreed to submit to you by October 1,
- 1988, an updated report that details our compliance with Rev.
3 of Regulatory Guide 1.97.
The October 1, 1988 submittal will consolidate, clarify and update our previous submittals (AEP:NRC:07730, dated October 15, 1985 and AEP:NRC:0773S, dated June 29, 1987) concerning our status of compliance with R.
G. 1.97.
Our October 1, 1988 submittal will be prepared based on the assumption that the deviations from Reg.
Guide 1.97 recommendations requested in our previous submittals will be approved.
In order to meet our installation schedule, we are proceeding with our design efforts based on these deviations and the commitments noted in our previous submittals.
These deviation requests will be reiterated in our October 1988 submittal; therefore, any ongoing NRC review activities associated with previous requests for deviations and additional information requested by your staff can continue.
- However, we request that the NRC's final licensing decision be based on our October 1, 1988 submittal.
s 8807010042 880620 PDR ADOCK 05000315 p
~~>
~
Dr. T. E. Murley AEP:NRC:0773AC This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M.
. Al ich Vice President eh cc:
D. H. Williams, Jr.
W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Bruchmann-G. Charnoff NRC Resident Inspector
- Bridgman A. B. Davis - Region III