ACCELERATED DIAIBUTION DEMONSTIOIION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8805260318 DOC.DATE: 88/04/08 NOTARIZED-NO DOCKET FACXL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Xndiana 6
05000316 AUTH.NAME AUTHOR AFFILIATION PUPLXS,A.S.
(formerly Indiana 6 Michigan Ele SMITH,W.G.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Mar 1988.W/880408 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
~
ENCL /
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NR~gA B12 REG FILE 01 EXTERNAL EG&G WXLLIAMST S NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RGN3 LPPR NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
1 1
1 1
1 j
A Q.Qc.
c Sj
'A TOTAL NUMBER OF COPIES REQUXRED:
LTTR 22 ENCL 20 I
L
"ZO Dt4 CIO:
OQ'Q'g' VI00OO)'O UO.Q' AQQ Qs p,t0<<')alc IIEI<<OIIfgg)N(II MARCH cN s g.Sj gef I.fee>>see liven)
Ifcpiul 4'NIT'Sill)'fl)O)VNS ANI)A))YE(II(El)lf('HANS l)OCKETNO.
I)AYE~
('ause ffiCiltiel:tive Acti>>it to Prevcnl lfcenttenee There were no power reductions or outages during the reporting period.
I I': I'>>teed S: Scfteiftdcif C
I')Iff)
Ifeasiui:
h.iiiftdptncnt I aifule(Expbfn) 0 Mafufctiaticc tiiTcsl C Rcfucffttl I) )Ief,tdattuy Ilesttfelfiut I'..Opetalot I'tafnfnff4 Uccnse I xatidnatfiut I'dntfnfsftat fve
(<<Ofiefal)IHlafI:itiiiII:xpfani)
II'()fflet II'xplafti)
LIethiHI:
I Ma>>uaf 2 MalltlalSetatlt.
3 Aufotnalfe Sera>>i.
4 Othcl (Explain)
Exllibf)Ci-tnsltuclf<xls fot ptcfiatatfiin of l)ala I:oilySflccls flu IAccnsce Event ffepiut(f.l:Rll'ife(Nfffff(f.
0)6I )
I:xi>>bit I ~ Su>>le Silulce
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 04-APR-88 COMPLETED BY Michael'n TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period MAR-88 ',notes 3.
Eicensed Theimal Po~er (MWt) 3511 4.
Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe) 1100 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since East Report Give Reasons 9.
Power Eevel To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
Yr. to Date Cumm.
11.
Hours in Reporting Period 744.0 2184.0 89832.0 12.
No. of Hrs. Reactor Was Critical 744.0 2184.0 63063.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator on Line 744.0 2184.0 61678.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Therm.
Energy Gen.
(MWH) 2038466 5978341 188133738 17.
Gross Elect.
Energy Gen.
(MWH) 666170 1955650 61432270 18.
Net Elect.
Energy Gen.
(MWH) 639969 1878687 59140087
- 19. Unit Service Factor 100.0 100.0 70.6
- 20. Unit Availability Factor 100.0 100.0 70.6
- 21. Unit Capacity Factor (MDC Net) 81.1 81.2 63.8
- 22. Unit Capacity Factor (DER Net) 78.2 78.2 62.3
- 23. Unit Forced Outage Rate 0.0 0.0 14.6 24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
1KSLf duration of 225 dias.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIAL CRITICALITY INITIALEEECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe.-Net)
DOCKET NO.
50-316 (JNIT TWO DATE 04-APR-88 COMPLETED BY Michaelson TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10ll 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 862 863 865 861 862 864 861 865 863 860 862 863 859 859 857 858 MAR-88 DAY 17'8 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY.,
POWER LEVEL 860 S60 862 860 861 858 861 860 860 855 856 856 858 858 855
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 A. S. Puplis (616) 465-5901 April 8, 1988 1of1 HIGHLIGHTS MONTHLY OPERATING ACTIVITIES -
MARCH 1988 The reporting period began with the Unit at its administrative power limit of 805 reactor power.
The unit operated at 80/ the entire reporting period.
Gross electrical generation for the month of March was 666,170 MWH.
DETAILS 03-28-88 1230 A packing gland on the north seal injection filter differential pressure indicator failed resulting in the leakage of 300 gallons to the 587'levation of the auxiliary building, causing extensive contamination of the area.
The failed packing gland was manually isolated at 1310.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook-Unit No.
2 A ril 1, 1988 A. S.
Pu lis 616 465-5901 10 1
MAJOR SAFETY-RELATED MAINTENANCE MARCH 1988 There were no Unit 2 Safety Related Maintenance Orders for the month of March.
~
~ ~ V Indiana Michigan Power Company Cook Nuclear Plant P.O. Box 458 Bridgman, Ml 49106 616 465 5901 PrP IItIQMItm NICHICNN POEM U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 April 8, 1988 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9. 1. 10, the attached Monthly Operating Report for the Month of March, 1988 is submitted.
Sincerely, l.
G. Smith, Jr. H~
Plant Manager WGS/jd cc:
D. H. Williams, Jr.
M. P. Alexich R.
W. Jurgensen R.
C. Callen C. A. Erikson D.
W. Paul D.
R.
Hahn J. J.
Markowsky E. A. Morse PNSRC File INPO Records Center ANI Nuclear Engineering Department T.
R. Stephens NRC Region III B. L. Jorgensen S. L. Mall D. A. Timberlake EPRI--Nuclear Safety Analysis Center