ACCELERATZD DISI'RIBUTIQN DEMONSTRATION SYSTEM REGULATORY XNFORMATION DXSTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:8803300326 DOC.DATE: 88/02/29 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 AUTH.NAME AUTHOR AFFILIATION MXCHAELSON Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele SMITH,W.G.
(formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1988.W/880304 ltr.
DISTRIBUTION CODE:
IE24D COPXES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 LA STANG,J XNTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB11E NRR/PMAS/ILRB12 RGN3 EXTERNAL: EG&G GROH,M NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB11B NRR/~REP/
10A LPDR NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
l 1%
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 02-Mar-88 COMPLETED BY Michaelson TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period Feb-88
,'notes
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1030 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1020
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
Yr. to Date 11.
Hours in Reporting Period 696.0 1440.0 12.
No. of Hrs. Reactor Was Critical 696.0 1419.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 14.
Hours Generator on Line 696.0 1413.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 16.
Gross Therm.
Energy Gen.
(MWH) 1997614 4074586 17.
Gross Elect.
Energy Gen.
(MWH) 650850 1329150 18.
Net Elect.
Energy Gen.
(MWH) 625430 1277684 19.
Unit, Service Factor 100.0 98.2
- 20. Unit Availability Factor 100. 0 98.2 21.
Unit, Capacity Factor (MDC Net) 88.1 87.0
- 22. Unit Capacity Factor (DER Net) 87.2 86.1
- 23. Unit Forced Outage Rate 0.0 1.8 24.
Shutdowns Scheduled over Next Six Mon hs (Type, Date,and Ice Condenser surveillance ou~ta e to begin on Mar. 26, 1988 for an duration of 10 da~s.
Cumm.
115392.0 83257.7 463.0 81651.0 321.0 237073584 77473820 74508682 72.0 72.0 64.4 62.3
8.3 Duration)
estimated
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved SS03300326 SS0229 PDR ADOCK 05000315 R
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-315 UNIT ONE DATE 02-Mar-88 COMPLETED BY Michaelson TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAIlY POWER LEVEl 922 922 922 922 921 922 922 922 919 923 918 921 562 655 918 918 Feb-88 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 AVERAGE DAILY POWER LEVEL 917 916 920 921 919 919 921 918 918 920 921 920 920
I I
~
~
g
~
~ ~ ~
~
a l
~ ~
~ ~
I liight%]%ceo '
I I
~ I
~
~
~ ~
~
~
~ )
~
~
~
~
~ ~
~ ~
r I'~
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.
C.
Cook Unit 1
A. S. Puplis (616) 465-5901 March 4, 1988 1of1 HIGHLIGHTS:
MONTHLY OPERATING ACTIVITIES -
FEBRUARY 1988 The reporting period began with the Unit at its administrative power limit of 90K reactor power.
A planned power reduction to 55% reactor power to repair a leak on the east main feed pump emergency leak off line occurred on February 12, 1988.
Power was restored to 90$ reactor power on February 14, 1988.
The reporting period ended with the Unit at its administrative power limit of 90K reactor power.
Gross electrical generation for the month of February was 650,850 MWH.
DETAILS 2-12-88 2-14-88 At 2339, a planned power reduction to 55$ reactor power was'nitiated to repair a leak on the east main feed pump emergency leakoff line.
Power ascension was initiated at 1108 following repair of the leak.
At 2125 reactor power was restored to 90K.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 Cook - Unit No.
1 arc 616 465-5901 1of1 MAJOR SAFETY-RELATED MAINTENANCE FEBRUARY 1988 M-1 Job Order No.
1-DCR-320 (Steam Generator ONE 3-1 Blowdown 734684 Containment Isolation Valve) closed and would not reopen from the control room switch.
The diaphragm was replaced and the valve tested satisfactorily.
INC-I 730278 3
730207 While per forming the delta T/T average surveillance procedure 1-THP 4300.STP.006 it was determined that the T average voltage/current (E/I) module 1TY-432A was found out of calibration.
A calibration check was performed on 1-TY432A. It was found to be out of specification by 1. 1Ã.
Also found the R/E module 1TY-432A to be drifting.
The defective R/E module was replaced with a new R/E module.
R/E module 1-TY431A and E/I module 1-TY432A were recalibrated per 1-THP 6030. IMP.096, and 1-THP 4030.STP.006 was performed and the channel declared operable.
~
~
!e"-
indiana Michiga Power Company Cook Nuclear Plant P.O. Box 458 Bridgman, Ml 49106 616 465 5901 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 March 4, 1988 WWANA NICHlGAM POWER Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1
Technical Specification 6.9. 1. 10, the attached Monthly Operating Report for the Month of February, 1988 is submitted.
Sincerely,
/
LC ~V W.
G. Smith, Jr.
Plant Manager WGS/jd cc:
D.
H. Williams, Jr.
M. P. Alexich R.
W. Jurgensen R.
C. Callen C. A. Erikson D.
W. Paul D.
R.
Hahn J. J.
Markowsky E. A. Morse PNSRC File INPO Records Center ANI Nuclear Engineering Department T.
R. Stephens NRC Region III B. L. Jorgensen S. L. Hall D. A. Timberlake EPRI--Nuclear Safety Analysis Center
h tg