ML17325A383

From kanterella
Jump to navigation Jump to search
Notification of 871109 Meeting W/Util in Bethesda,Md to Discuss Testing Requirements for New Oil,Periodic Tank Oil Testing & Oil Tank Cleaning.Meeting Originally Scheduled for 871103
ML17325A383
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/19/1987
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Holahan G
Office of Nuclear Reactor Regulation
References
NUDOCS 8711020006
Download: ML17325A383 (2)


Text

AQTE:

MEETING DATE AND QPOM NO.

HAVE BEEN CHANGED October 19, 1987

SUBJECT:

LOCATION:

Docket Nos. 50-315 DISTRIBUTION:

and 50-316 Local PDR MEMORANDUM FOR:

Gary M. Holahan, Assistant Director TMurley for Regions III and V

FYiraglia Division of Reactor Projects - III, GHolahan IV, V and Special Projects OGC-Bethesda JPartlow FROM:

David L. Wigginton, Acting Director RGiordino Project Directorate III-3 ACRS (1G)

Division of Reactor Projects VWilson FORTHCOMIING MEETING WITH INDIANA AND MICHIGAN POWER COMPANY REGARDING DIESEL GENERATOR OIL TESTING November~ 1987 10:

00 AM Room P~

Phillips Building

Bethesda, MD NRC PDR PDIII-3 r/f JSniezek DWigginton WLanning EJordan Receptionist DShum GPA/FA BKolostyak PURPOSE:

To discuss the testing requirements for new oil, periodic tank oil testing, and oil tank cleaning.

Participants:

NRC D. Wigginton R. Giqrdinq,

OTSB, D. Shum, SPLB IMPC B. Svennsson T. Kriesel AEP P. Barrett G. Hines

/s/

David L. Wigginton, Acting Director Project Directorate III-3 Division of Reactor Projects Meetings between NRC technical staff and applicants, or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy", 43 Federal Register 28058, 6/28/78.

Office:

LA/

-3 Surname:

PKreutzer Date:

10/ gQ/87 PM/PDIII-3 DWigginton 10/yq/87 87ii02000h 87i0i9 PDR ADOCg 050003i5 P

PDR

Mr. John Dolan Indiana and Michigan Electric Company Donald C.

Cook Nuclear Plant CC:

Mr. M. P. Alexich Vice President Nuclear Operations American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43215 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgeman, Michigan 49106 W. G. Smith, Jr., Plant Manager Donald C.

Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Reaulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mayor, City of Bridgeman Post Office Box 366 Bridgeman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. J. Feinstein American Electric Power Ser vice Corporation 1 Riverside Plaza

Columbus, Ohio 43216