ML17325A229
| ML17325A229 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/29/1987 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Murley T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| AEP:NRC:0980D, AEP:NRC:980D, NUDOCS 8708040003 | |
| Download: ML17325A229 (4) | |
Text
ACCESSION NBR FAC IL: 50-316 AUTH. NAME ALEX ICHOR M. P.
REC IP. NAME MURLEYiT. E.
REQULATO INFORMATION DISTRIBUTION
'STEM (RIDS) 8708040003 DOC. DATE: 87/07/29 NOTARIZED:
NO DOCKET ¹ Donald C.
Cook Nuclear Pacer Planti Unit 2i Indiana 8c 05000316 AUTHOR AFFILIATION Indiana
- 8. Michigan Electric Co.
RECIPIENT AFFILIATION Document Control Branch
<Document Control Desk)
SUBJECT:
Application for amend to License DPR-7%i approving steam generator repair prospect. Approval of amend requested bg 871130' er 870715 me etin g.
DIBTRIBUTION CODE:
AOOID COPIEB RECEIVED: LTR
~
ENCL 0 SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
REC IP IENT ID CODE/NAME PD3-3 LA WIGGINGTONI D COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL INTERNAL: ARM/DAF/LFMB NRR/DEST/ADS NRR/DOEA/TSB OQC/HDS1 RES/DE/EIB NRR/DEST/ADE NRR/DEST/CEB NRR/PMAS/ILRB 01 EXTERNAL:
EG8(G BRUSKEs S NRC PDR LPDR NSIC TOTAL NUMBER OF COP IES REQUIRED:
LTTR 20 ENCL
INDIANA8 MICHIGAN ELECTRIC COMPANY P.O, BOX 16631 COLUMBUS, OHIO 43216 July 29, 1987 AEP:NRC:0980D Donald C.
Cook Nuclear Plant Unit 2 Docket No. 50-316 License No.
STEAM GENERATOR REPAIR PROJECT LICENSE AMENDMENT U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 ATTN:
T.
E. Murley
Dear Dr. Murley:
We are pleased to inform you that in order to further assure the safe and continued operation of the Donald C.
Cook Nuclear Plant we have advanced to May 1988 the start date for the Unit 2 Steam Generator Repair Project.
Please note the May 1988 start date is much earlier than the original March 1989 date contained in our Steam Generator Repair Report dated November 4, 1986.
This proposed schedule
- change, which is now confirmed, was reviewed with members of your staff during a meeting on July 15, 1987 to discuss the licensing priorities for the Donald C.
Cook Nuclear Plant.
During that meeting, the Steam Generator Repair Project was identified as our number one licensing priority.
As discussed with your staff, because of the need to complete some work prior to the May 1988 start date we are requesting that the License Amendment approving this work and repair project be issued by November 30, 1987.
We request your assistance in obtaining the License Amendment necessary to approve the Steam Generator Repair Project by November 30, 1987.
To assist your staff in their review of our application, we are available to provide any supplementary information they may require, in presentation or written format, at their convenience.
I would be pleased to provide you personally with a briefin'g, or provide other such information you may desire in connection with this significant project. If we may facilitate your consideration of our application in any way, please contact me.
8708040003 870729 PDR
-ADDCK 05000316 P
PDRl 0
AEP:NRC:0980D This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, M.,
'. Alegach Vice President edg Attachment cc:
John E. Dolan W.
G. Smith, Jr.
- Bridgman R.
C. Callen G.
Bruchmann G. Charnoff NRC Resident Inspector
- Bridgman A. B. Davis
- Region III