UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D: C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET NO. 50-315 DONALD C.
COOK NUCLEAR PLANT, UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 110 License No.
DPR-58 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
C.
D.
E.
The application for amendment by Indiana and Michigan Electric Company (the licensee) dated February 25, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's 'rules and regulations set
,forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with 'the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8706150i5j 870529 PDR ADOCK 050003i5 p
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-58 is hereby amended to read as follows:
(2) Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 110
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The Technical Specification is effective within 60 days of the date of issuance.
4.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Ql Dominic C. DiIanni, Acting Project Director Project Directorate III-3 Division of Reactor Projects Date of Issuance:
May 29, 1987
~I q'IIEGy~
c>
~o p
n+i UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET NO. 50-316 DONALD C.
COOK NUCLEAR PLANT, UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
93 License No.
DPR-74 l.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
C.
D.
E.
The application for amendment by Indiana and Michigan Electric Company (the licensee) dated February 25, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-74 is hereby amended to read as follows:
(2) Technical S ecifications The Technical Specifications contained in Appendices A and B, as 'revised through Amendment No. 93
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The Technical Specification is effective within 60 days of the date of issuance.
4.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Dominic C. DiIanni, Acting Project Director Project Directorate III-3 Division of Reactor Projects Date of Issuance:
May 29, 1987
ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT N0,110 FACILITY OPERATING LICENSE NO.
DPR-58 AMENDMENT NO 93 FACILITY OPERATING LICENSE NO.
DPR-74 DOCKET NOS.50-315 AND 50-316 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.
The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
REMOVE Unit 1 3/4 6-30 Unit 2 3/4 6-39 INSERT 3/4 6-30 3/4 6-39
CONTAINMENT SYSTEMS ICE CONDENSER DOORS LIMITING CONDITION FOR OPERATION 3.6.5.3 The ice condenser inlet doors, intermediate deck doors, and top deck doors shall be closed and OPERABLE.
APPLICABILITY:
MODES 1, 2,
3 and 4.
ACTION:
With one or more ice condenser doors open or otherwise inoperable, POWER OPERATION may continue for up to 14 days provided the ice bed temperature is monitored at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and the maximum ice bed temperature 0
is maintained
< 27 F; otherwise, restore the doors to their closed positions or OPERABLE status (as applicable) within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.5.3.1 Inlet Doors
- Ice condenser inlet doors shall be:
a.
Continuously monitored and determined closed by the inlet door position monitoring system, and Demonstrated OPERABLE during shutdown at least once per 9 months by:
1.
Verifying that the torque required to initially open each door is < 675 inch pounds.
2.
Verifying that opening of each door is not impaired by ice, frost or debris.
3.
Testing a sample of at least 50% of the doors and verifying that the torque required to open each door is less than 195 inch-pounds when the door is 40 degrees open.
This torque is defined as the "door opening torque" and is equal to the nominal door torque plus a frictional D.
C.
COOK - UNIT 1 3/4 6-30 Amendment No. 110
CONTAINMENT SYSTEMS ICE CONDENSER DOORS LIMITING CONDITION FOR OPERATION 3.6.5.3 The ice condenser inlet doors, intermediate deck doors, and top deck doors shall be closed and OPERABLE.
APPLICABILITY:
MODES 1, 2,
3 and 4.
ACTION:
With one or more ice condenser doors open or otherwise inoperable, POWER OPERATION may continue for up to 14 days provided the ice bed temperature is monitored at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and the maximum ice bed temperature 0
is maintained
< 27 F; otherwise, restore the doors to their closed positions or OPERABLE status (as applicable) within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILIANCE RE UIREMENTS 4.6.5.3.1 Inlet Doors
- Ice condenser inlet doors shall be:
a.
Continuously monitored and determined closed by the inlet door position monitoring system, and b.
Demonstrated OPERABLE during shutdown at lea'st once per 9 months by:
1.
Verifying that the torque required to, initially open each door is < 675 inch pounds.
2.
Verifying that opening of each door is not impaired by ice, frost or debris.
3.
Testing a sample of at least 50% of the doors and verifying that the torque required to open each door is less than 195 inch-pounds when the door is 40 degrees open.
This torque is defined as the "door opening torque" and is equal to the nominal door torque plus a frictional torque component.
The doors selected for determination of the,"door opening torque" shall be selected to ensure that all doors are tested at least once during two test intervals.
D.
C.
COOK - UNIT 2 3/4 6-39 Amendment No.
93