ACCESSION NBR:
FAC IL: 50-316 AUTH. NAltE ALEXICH>M. P.
RECIP. NAME MURLEY> T. E.
DAVISiA. B ~
REGULATORY. I RMATION DISTRIBUTION SYSI+
(R IDS) 8706010398 DOC. DATE: 87/05/28 NOTARIZED:
NQ DOCKET 0 Donald C.
Cook Nuclear Pouer Planti Unit 2.
Ind iana 5
05000316 AUTHOR AFFILIATION Indiana 8r Michigan Electric Co.
RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Document Control Branch (Document Control Desk)
SUBJECT:
Notifies that next refueling outage scheduled'to begin on approx 880501. Dates in encl util 851015 5 860516 ltrs re compliance e/Reg Guide
- 1. 97 0 IE Bulletin 85-003, should be revised according 1 g +or re fue 1 ing outag e +or k.
DIBTRIDVTIDNCDDE:
A0030 CDPIEB RECEIVED: LTR g ENCL J SIZE:
TITLE: QR/Licensing Submittal:
Sup p l 1 to NUREG-0737(Generic Ltr 82-33)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 LA NIGGI NGTQN> D COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 7
7 INTERNAL:
REG ILE EXTERNAL: LPDR N81C 01 1
0 1
1 NRR/DLPG/HFB RES DEPY GI NRC PDR 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 15
I 1 I'
II II-
INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 'I6631 COLUMBUS, OHIO 43216 May 28, 1987 AEP:NRC:0773AA Donald C.
Cook Nuclear Plant Unit No.
2 Docket No. 50-316 License No.
DPR-74 RESCHEDULING OF ACTIONS COMMITTED TO WITH RESPECT TO REG.
GUIDE 1.97 AND BULLETIN 85-03 DUE TO DELAY IN ANTICIPATED START OF NEXT UNIT 2 REFUELING OUTAGE U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T.
E. Murley and A. B. Davis
References:
Letter AEP:NRC:07730, dated October 15, 1985 Letter AEP:NRC:0966, dated May 16, 1986
Dear Dr. Murley:
In the above letters, we committed to certain actions with respect to compliance with the recommendations of Regulatory Guide 1.97, Rev.
3 (AEP:NRC:07730) and I.E. Bulletin No. 85-03 (AEP:NRC:0966).
A copy of each of these letters is attached for your convenience.
The implementation schedule of some of the above actions was based on refueling outages that were scheduled to take place subsequent to the transmittal of the letters.
Specifically, the tables enclosed in our letter AEP:NRC:07730 stated that some variables would be implemented during a Unit 2 refueling outage scheduled for 1987, and the cover letter of AEP:NRC:0966 referred to a Unit 2 refueling outage scheduled for February 1988.
Our current schedule calls for the next Unit 2 refueling outage to begin on approximately May 1, 1988.
The dates in the above-referenced letters should therefore be revised accordingly for Unit 2 refueling outage related work.
8706010378 870528 PDR ADOCK 05000316 P
t
Dr. T.
E. Murley AEP:NRC:0773AA This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prio'i to signature by the undersigned.
Very truly yours, cm Attachments M.
. Ale ich Vice President cc:
John E. Dolan W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector
- Bridgman
ATTACHMENT 1 TO AEP:NRC:0773AA LETTER AEP:NRC:07730, DATED OCTOBER 15, 1985
I pJ