Amend 105 to License DPR-58,revising Tech Specs to Limit Hourly Verification of Quadrant Power Tilt Ratio to 12 H
ML17325A041
Person / Time
Site: Cook 
Issue date: 04/07/1987
From: Wigginton D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17325A042 List:
References
NUDOCS 8704140374
Download: ML17325A041 (8)


Text

s 1

gA> REGS 0

Cy 00 n ++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET NO. 50-315 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. >o>

License No.

DPR-58 1.

The Nuclear Regulatory Commission (the CoIITIIission) has found that:

A.

The application for amendment by Indiana and Michigan Electric Company (the licensee) dated December 5, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the COIImIission; C.

There is reasonable assurance (i) that'the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common-defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-58 is hereby amended to read as follows:

8704140374 870407 PDR ADOCK '05000315 PDR

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.105, are

'ereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

The Technical Specification change is to become effective within 45 days of receipt of this amendment.

This license amendment is effective as of the date of its issuance.

j FOR THE NUCLEAR REGULATORY COMMISSION Dave L. Wigginton, Project Manager PWR Project Directorate 84 Division of PWR Licensing-A

Attachment:

Changes to the Technical Specifications Date of Issuance:

APril 7 1987 PW i(((4/

R-A DWigginton/mac O4/ ) /87 PPP(4)DPWR-A MhSKn 04//

/87 OG ethesda

~ g~N 4

/

P WR(5(

WR-A BJYo ngblood 04/( /87

I 1

t i

4 t'

l1 4

0 l

I l

t

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT N0.105 FACILITY OPERATING LICENSE NO.

DPR-58 DOCKET NO. 50-315 Revise ApPendix A as follows:

Remove Pa es 3/4 2-14 3/4 2-15 Insert Pa es 3/4 2-14 3/4 2-15

IP

POWER DISTRIBUTION LIMITS UADRANT POWER TILT RATIO LIMITING CONDITION FOR OPERATION 3.2.4 THE QUADRANT POWER TILT RATIO shall not exceed 1.02.

APPLICABILITY:

MODE 1 ABOVE 50%

OF RATED THERMAL POWER*

ACTION:

a.

With the QUADRANT POWER TILT RATIO determined to exceed 1.02 but

< 1.09:

l.

Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> a)

Either reduce the QUADRANT POWER TILT RATIO to within its liIIlit, or T

b)

Reduce THERMAL POWER at least 3% from RATED THERMAL POWER for each 1% of indicated QUADRANT POWER TILT RATIO in excess of 1.0 and similarly reduce the Power Range Neutron Flux-High Trip Setpoints within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Verify that the QUADRANT POWER TILT RATIO is within its-limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> afte'r exceeding the limit or reduce THER.'1AL POWER to less than 50% of RATED THERMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip setpoints to < 55% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4 Identify and correct the cause of the out of limit condition prior to increasing THERMAL POWER; subsequent POWER OPERATION above 50% of RATED THERMAL POWER may proceed provided that the QUADRANT POWER TILT RATIO is verified within its limit at least once per hour for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or until verified acceptable at 95% or greater RATED THERMAL POWER.

With the QUADRANT POWER TILT RATIO determined to exceed 1.09 due to misalignment of either a shutdown or control rod:

1.

Reduce THERMAL POWER at least 3% from RATED THERMAL POWER for each 1% of indicated QUADRANT POWER TILT RATIO in excess of 1.0, within 30 minutes.

2.

Verify that the QUADRANT POWER TILT RATIO is within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after exceeding the limit or

  • See Special Test Exception 3.10.2 D.

C.

COOK - UNIT 1 3/4 2-14 Amendment No.

105

POWER DISTRIBUTION LIMITING CONDITION FOR OPERATION Continued reduce THERMAL POWER to less than 508 of RATED THERMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to < 558 of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Identify and correct the cause of the out of limit condition prior to increasing THERMAL POWER; subsequent POWER OPERATION above 508 of RATED THERMAL POWER may proceed providing that the QUADRANT POWER TILT RATIO is verified within its limit at least once per hour for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or' until verified acceptable at 958 of greater RATED THERMAL POWER.

With the QUADRANT POWER TILT RATIO determined to exceed 1.09 due to causes other than the misalignment of either a shutdown or control rod:

1.

Reduce THERMAL POWER to less than 508 of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to < 558 of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Identify and correct the cause of the out of limit condition prior to increasing THERMAL POWER; subsequent POWER OPERATION above 508 of RATED THERMAL POWER may proceed provided that the QUADRANT POWER TILT RATIO is verified within its limit at least once per hour for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or until verified at 958 or greater RATED THERMAL POWER.

SURVEILLANCE RE UIREMENTS 4.2.4 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 508 of RATED THERMAL POWER by:

a.

Calculating the ratio at least once per 7 days when the alarm is OPERABLE.

b.

Calculating the ratio at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during steady state operation when the alarm is inoperable.

c.

Using the movable incore detectors to determine the QUADRANT POWER TILT RATIO at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when one Power Range Channel is inoperable and THERMAL POWER is ) 75 percent of RATED THERMAL POWER.

D.

C.

COOK - UNIT 1 3/4 2-15 Amendment No.