ML17325A028

From kanterella
Jump to navigation Jump to search
Forwards LERs 87-001-00 & 87-002-00
Date released: 05/31/2018 Download: ML17325A028


LER 87-002-00:on 870305-06,frost & Ice Buildup on Lattice Frames & Between Walls & Ice Baskets Adjacent to Walls Exceeded Tech Spec 4.6.5.1.b.3 Limits.Cause to Be Investigated by Westinghouse.Internal Investigation Begun
ML17325A030
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/03/1987
From: Postlewait T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17325A030 (7)
LER 87-001-00:on 870303,spurious Signal from Source Range Instrument Channel N-31 Resulted in ESF Actuation.Caused by Malfunction of Detector.Source Range Instrument Detector Removed,Replaced & Declared Operable on 870314
ML17325A029
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/01/1987
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17325A029 (5)
Forwards LERs 87-001-00 & 87-002-00
ML17325A027
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/03/1987
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17325A027 (3)