ACCESSION NBR:
FAC IL:50-315 50-316 AUTH. NANE ALEXICHiN P.
RECIP. NANE REGULATORY FORMATION DISTRIBUTION 'SY N (RIDS) 8702130420 DOC. DATE: $7/02/Ob NOTARIZED:
. NO DOCKET 0 Donald C.
Cook Nuclear Poeer Plant>
Unit 1>
Ind iana 0
05000315 Donald C.
Cook Nuclear Power Planti Unit 2.
Indiana 5
050003ih AUTHOR AFFILIATION Indiana 5 Nichigan Electric Co.
RECIPIENT AFFILIATION Document Control Branch (Document "Control Desk)
SUBJECT; Submits addi info re enhancement of meteorological measur ing sos at planti including description of sos w/location of towers Zc locati on of instrumentati on o f. towers 0 op erat ional characteristics of enhanced sgsi per DL Migginton request.
DIBTRIBUTION CODE:
AOOID COPIEB RECEIVED: LTR l ENCL Q SIZE:
TITLE:
OR, Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAME PMR-A EB PMR-A FOB PMR-A PD4 PD 01 PMR-A PSB INTERNAL: ADN/LFNB NRR TSCB Q FILE 04 COPIES LTTR ENCL 1
1 5
5 1
1 0
1 RECIPIENT ID CODE/MANE PWR-A EICSB PMR-* PD4 LA WIQQINGTONi D PMR-A RSB ELD/HDS3 NRR/ORAS COPIES LTTR ENCL 2
2 1
0 1
1 1
0 0
EXTERNAL:
EG8cQ BRUSKE> S NRC PDR 02 LPDR NSIC 03 05 2
2 1
1 TOTAL NUI'ABER OF COPIES REQUIRED'TTR H
ENCL
- .efv'ri j,jjrr
'rk v 5.. Ile I>> "
Ir, v
Q <r'5 I v'>>I IQ>>'" <<.'I,'""
>j>>'
'll-'r
'v"j 'P,-)
~ ( "'.
v>>r j ) Lf'j i >>lw
', km'ffe vr'I >>IIIr'ilI
=>
~
, ~r)V'h
." j tj
',,", q
~
Ir.e.h vh~vr 3
'I Ie i <<p5',.>> )>>e Ie re r<
v r>>LI>>II ve I I j~
h>>'v r>>
vr p 0
r' I
I
~ e I >>)
IlI
~
vhiv ~'e'lf I r
, >> "lrr>>vvepe g tiri ci e&
8 C <<L',lj>>
r ev" p" e,
J I
av lrle
, II I>>r
.',tj 'I'.W
~
C r r II v rl r
'Ie v v v v v
- v. l L t. ~
~ J>>ere rr v
v ~ <<
INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 February 6,
1987 AEP:NRC:0999B Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 ADDITIONAL INFORJATION ON METEOROLOGICAL MEASURING SYSTEM U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555
Dear Sirs:
Per the request of Mr. D. L. Migginton of the NRC staff, the following is additional information with regard to the enhancement of the meteorological measuring system at the D.
C.
Cook Nuclear Plant Unit Nos.
1 and 2 and as discussed in our letter AEP:NRC:0999A dated December 2,
1986.
Specifically, we are providing the following information:
(1) additional description of the system, including the location of the towers, location of instrumentation on the towers and operational characteristics of the enhanced
- system, and (2) a revised schedule, including the date when meteorological data from the enhanced system should be available for use.
The three-tower syst'm (comp'osed of the primary tower, the backup tower and the shoreline tower) will be controlled by a central computer located at the Cook Plant site.
The central computer will have the capability to be monitored by onsite and remote terminals.
gpss /he L' The proposed locations of the towers are shown on Figure 1.
The primary and backup towers will be located approximately 1 mile east of the plant and will be within the Thermal Internal Boundary Layer (TIBL) at all times.
As discussed in our December 2,
1986 letter, the towers will.be more representative of the meteorology within the 10-mile Emergency Planning Zone since they will be within the TIBL.
For the primary tower, we propose to erect a 60-meter tower and place our instruments at the 10- and 60-meter levels.
The proposed location for the backup tower is a siren pole located across from the plant entrance.
Its instruments will be located at the 10 meter level of the pole.
These proposed locations are subject to minor changes as details are developed.
The third tower will be located just southwest of the plant on the shore of Lake Michigan.
This tower is being installed to monitor unmodified air at a coastal facility.
The instruments for this tower will also be located at 10 meters.
r 8702130420 870206 PDR
,'ADOCK 05000315, p'DR
AEP:NRC:0999B Each tower site will be equipped with a local microprocessor.
The microprocessors for the primary and backup site will be located in protective enclosures.
Strip charts for windspeed and wind direction will also be located at these towers.
The shoreline tower microprocessor and strip charts will be located with the central computer at the plant site.
Each microprocessor will sample the analog sensor output, test for invalid or suspect data, flag and store the data, calculate 15-minute averages and respond to polling requests from the central computer.
The proposed meteorological system will monitor the same parameters as are now monitored.
The data recovery and data quality will be as good as, and probably better
- than, the data obtained from our present system.
A schematic of the computer system is shown in Figure 2.
The central computer will receive signals from the three towers microprocessors.
It will also be accessed by five remote terminals:
one in the D.
C.
Cook environmental office, one in the Technical Support Center, one at the Central computer location, one at the emergency operating facility and one located at the corporate office.
There will also be a printer in the environmental office.
The central computer will also have the capability to send information to the Technical Support Center comput: er.
The system could be expanded in the future to include a dial-up line from the state offices, an NRC data line and an input line from the radiation monitoring system.
The computer software for the system will include the operating
- system, a program to calculate 10 CFR 50 Appendix I dose estimates and a program to determine the doses from accident releases for emergency planning.
The project is scheduled for completion in June 1988.
As part of this schedule the system hardware and software are to be installed by December 31, 1987.
At that time we could, if necessary, be able to manually retrieve data from the new towers.
The syst: em will be run in parallel with the present system for evaluation and checkout with the turnover from old system to new system scheduled for June 1988.
If you require further details in regard to this proposed
- system, we will be happy to meet with your staff to discuss it.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, M. P. Al xich Vice President Q ~cQ cm cc:
John E. Dolan W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector
- Bridgman J.
G. Keppler, NRC Regional Administrator, Region III
Rosemary Beach 4~ >
'i
~
o
~'
o ~ o
~
~
~ ~
~gl0 I
or o
I 0
W ~
~i.r~
/"-
l l
I
.t-:
/
6c 5~
POWeIP a
+ ~P~rPP 4.a.
'a, r~~P~
(~
~
I o "..
o I!- 'O r
~ I.
I 622'
/
) I.
LEGEND X PROPOSED PRIMARY SITE 5 PROPOSED SECONDARY SITE 0 PROPOSED LAKESHORE SITE er<
L'-"-
/
//
0
/go
. Ai)4/
".N l/./
FIGURE L PROPOSED MONITORING SITE LOCATIONS
//
P
~ LIP-(11gSIJOtl i8(
!r=
TSC COMPUTER ENVIRONMENTAL PRINTER SHOREUNE TOWER STRIPCHARTS ENVIRONMENTAL TERMINAL PRIMARY TOWER LOCAL PROCESSO LOCAL PROCESSO TSC TERMINAL STRIPCHARTS CENTRAL CGMPUTER CONSOLE TERMINAL
~MS (FUTURE)
~ MRC (FUIURE)
BACK-UP TOWER LOCAL PROCESSOR
~ ~
STRIPCHARTS PC AND MODEM AEPSC OFFICE TERMINAL AND MODEM EOF
~ 0o
4