ML17324B172

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-58,making Tech Spec 3.2.4 Action Statements Consistent W/Unit 2 & Westinghouse STS Which Require That Quadrant Power Tilt Ratio Be Verified within Limits at Least Once Per Hour for 12 H.Fee Paid
Date released: 05/31/2018 Download: ML17324B172


Proposed Change to Tech Spec 3.2.4, Making Action Statements Consistent W/Unit 2 & Westinghouse STS Requiring That Quadrant Power Tilt Radio Be Verified within Limits at Least Once Per Hour for 12 H or Until Acceptable at 5%
ML17324B173
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/05/1986
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17324B173 (2)
Application for Amend to License DPR-58,making Tech Spec 3.2.4 Action Statements Consistent W/Unit 2 & Westinghouse STS Which Require That Quadrant Power Tilt Ratio Be Verified within Limits at Least Once Per Hour for 12 H.Fee Paid
ML17324B171
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/05/1986
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML17324B171 (9)