ML17324B103

From kanterella
Jump to navigation Jump to search
Notification of 861027-29 Site Meetings W/Licensee to Discuss Alternate Shutdown Procedures in Event of Fire & Tech Spec Upgrade Program
ML17324B103
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/15/1986
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8610200314
Download: ML17324B103 (4)


Text

i Docket Nos.:

50-315 and 50-316

'b fs ocT%6 MEMORANDUM FOR:

B. J.

Youngblood, Director PWR Project Directorate ¹4 Division of PWR Licensing-A, NRR FROM:

SUBJECT:

DATE 5 TIME:

LOCATION:

PURPOSE:

David L. Wigginton, Project Manager PWR Project Directorate ¹4 Division of PWR Licensing-A, NRR FORTHCOMING MEETING WITH INDIANA AND MICHIGAN ELECTRIC COMPANY REGARDING ALTERNATE SHUTDOWN PROCEDURES AND TECHNICAL SPECIFICATION UPGRADE PROGRAM Shutdown Procedures

- October 27-29, 1986 8:00 a.m.

Tech Spec Upgrade - October 28, 1986 8:00 a.m.

Shutdown Procedure - Areas inside the D.

C.

Cook Plant:

Public participation may be limited in most areas.

Tech Spec Upgrade - Visitors Center, D.

C.

Cook Site To walkdown and review procedures to safely shutdown either Unit should a fire occur in the control room or cable vault area.

This walkdown is independent of the fire audit to be conducted by Region II and IE at a later date.

The proposed glossary of terms from the Technical Specification Upgrade Program will be discussed in a working meeting and a tour conducted to resolve an issue on outside tanks at the plant.

PARTICIPANTS:

NRC igginton A. Singh B. Jorgensen, SRI J. Heller, RI B. Burgess, Region III IMECeinstein, et. al. Corporate B. Svennsen, et.al.

Plant cc:

S e next page PWR /

P lR-A DWigginton/mac 10/p /86 Dave L. Wigginton, Project Manager PWR Project Directorate ¹4 Division of PWR Licensing-A, NRR PW

/DPWR-A BJYoungblood 10//~ /86 Et610200314 861015 PDR ADOCK 05000315II P

PDR L!

P 4

MEETING NOTICE DISTRIBUTION D.

Mi inton tg is being held)

! Docket F~i'le NRC PDR L PDR NSIC PRC System PNR84 Reading File M. Duncan Project Manager ORAS H. Denton N. Olson H. Thompson E. Rossi, AD/PWR-A R. Ballard, EB C. Berlinger, RSB J. Milhoan, PSB F. Rosa, EICSB V. Benaroya, FOB OGC J. Partlow B. Grimes E. Jordan ACRS (10)

OPA Receptionist (Building where m

NRC Participants gg A. Singh B. Jurgenson, SRI J. Wheeler, RI B. Burgess, RII bcc:

Licensee/Applicant 8 Service List

. Itl'il

<<fJ'i J