Corrected Amends 94 & 80 to Licenses DPR-58 & DPR-74, Respectively,Revising Tech Specs Re Radiation Monitoring Instrumentation Requirements
ML17324A940
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/10/1986
From:
NRC
To:
Shared Package
ML17324A941 List:
References
NUDOCS 8606130328
Download: ML17324A940 (8)


Text

TABLE 4o.

'" Jf]gC

~

i ~.

(Cont'd) 0 O

8 I

OPERATION MODE/INSTRUMENT M

iii) Noble Gas Channel (ERS 1405) 3 ~

Mode**

CHANNEL CHECK CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST RADIATION MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMENTS MODES FOR WIIICH SURVEILLANCE RE UIRED A) Spent Fuel Storage (RRC-330)

LJ IW CD 0

ct To include SOURCE CHFCK per T/S Section 1.27.

    • With fuel in storage pool or building.

0 0328 860610 PDR ADQCK 05000315 PDR

TABLE 3~3-12, RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Instrument Minimum Channels ActiGn

1. Gross Radioactivity Monitors Providing Automatic Release Termination
a. Liquid Radwaste Effluent Line (1-R-18)

At times of release 23

b. Steam Generator Blowdown Line (1-R-19)

At times of release 24

c. Steam Generator

'lowdown Treatment Effluert (1-R-24)

2. Gross Radioactivity Monitors Not Providing Automatic Release Termination At times of release 24 TP S.

A

a. Service Water System Effluent Line (1-R-20, 1-R-28)
3. Continuous Composite Sampler Flow Monitor (1) per train At a'1 times 25
a. Turbine Building Sump Effluent Line At all times 25
4. Flow Rate Measurement Devices
a. Liquid Radwaste Line (RFI-285)
b. Discharge Pipes~
c. Steam Generator Blowdown Treatment Effluent (1-DFI-35 2)

At times of release At all times At times of release 26 NA 26

  • Pump curves and valve settings may be utilized to estimate flows in such cases, Action Statement 26 is not applicable.

D. C.

COOK - UNIT 1 3/4 3-58 Amendment No.

94

O

'e

TABLEe3.3-1$

Radioactive Gaseous Effluent Monitoring Instrumentation Instrument (Instrument ¹)

1.

Waste Gas Holdup System Explosive Gas Monitoring System

a. Hydrogen Monitor (QC-31)
b. Oxygen Monitor (QC-31, QC-370)

Minimum Channels

~Oerable (1)

(2)'n licabilit Action 30 29 2.

Condenser Evacuation System

a. Noble Gas Ac ivity Monitor (SRA-1905)
b. Flow Rate Monitor (SFR-401)

(1-MR-054) ~ and!or SRA-1910)

(1)

(1)

(1) 0***

28 27 27 3 ~

Unit Vent, Auxiliary Building Ventilation System

a. Noble Gas Activity Monitor (VRS-1505)
b. Iodine Sampler Cartridge for VRS-1503
c. Particulate Sampler Filter for VRS-1501
d. Effluent System Flow Rate Measuring Device (VFR-315)

(1-MR-054 and/or VRS-1510) e..Sampler Flow Rate Measuring Device (VFS-1521) 28 32 32 27 27 27 4.

Containment Purge System

a. Aux. Building Vent. System Noble Gas Activity Monitor {VRS-1505)
b. Aux. Building Vent. System Particulate Sampler

.for VRS-1501

  • 4**

31 32 5.

Waste Gas Holdup System

a. Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-1505) 33 6.

Gland Seal Exhaust

a. Noble Gas Activity Monitor (SRA-1805)
b. Flow Rate Monitor (SFR-201)

(1-MR-054 and/or SRA-1810)

(1)

(1)

(1) i***

I**A 28 27 27 D. C.

COOK UNIT 1 3/4 3-63 Amendment No.

9p

TABLE 4'"9 Radioactive Gaseous Effluent Monitorircr Instrumentation Surveillance Recuiremencs Instrument (Instrument I)

Channe'heck Source Check Channel Channel Functional Calibration Test

1. Waste Gas Holdup System Explosive Gas Monitoring System a.

Hydrogen Monitor (QC-31) b.

Oxygen Monitor (QC-31) c.

Oxygen Monitor (Alt. (QC-370)

Q***

D***

Q***

NA NA Q(3)

Q(4)

Q(4) 2 ~ Condenser Evacuation System

a. Noble Gas Activity Monitor (SRA-1905)
b. System Effluent Flow Rate (SFR-401, 1-MR-054, SRA-1910)

D*%

Q**

NA R (2)

Q(1=)

S

3. Auxiliary Building Ventilation System
a. Noble Gas Activity Monitor (VRS-1505)
b. Iodine Sampler (For VRS-1503 )
c. Particulate Sampler W*

(For VRS-1501)

d. System Effluent Flow Rate Measurement Device (VFR-315, 1-MR-054, VRS-1510) e.

Sampler Flow Rate Do Measurement Device (VFS-1521)

NA NA NA NA R(2)

NA Q(1)

NA NA 4 ~ Containment Purge System a.

Aux. Building Vent. System Noble Gas Activity Dkk Monitor (VRS-1505)

b. Aux. Building Vent. System Particulate Sampler g**

(For VRS-1501)

NA R(2)

NA Q(l)

NA

5. Waste Gas Holdup System
a. Noble Gas Activity Monitor Providing Alarm 8 Termination of Gas Decay Tank Release (VRS<<1505)

R(2)

Q(5)

De C.

COOK UNIT 1 3/4'-66 Amendment No.

94

WJQ<

TABLE 4.

~ (Cont'd)

RADIATION'MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMENTS

~o OPERATION MODE/INSTRUMENT iii) Noble Gas Channel 9

(ERS 2405)

M Mode**

CHANNEL CHECK S*

CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST MODES FOR WHIC)I SURVEILLANCE BE UIRFD A) Spent Fuel Storage (RRC-330)

S lA I4J o'

To include SOURCE CHECK per T/S Section 1.27.

    • With fuel in storage pool or building.

TABLE 3.3-12 i

RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Instrument Minimum Channels Operable Ao licabilit Action

1. Gross Radioactivity Monitors Providing Automatic Release Termination
a. Liquid Radwaste Effluent Line (2-R-18)

At times of release 23 b.

Steam Generator Blowdown Line (2-R-19)

At times of'elease 24 c.

Steam Generator Blowdown Treatment Effluent (2-R-24)

At times of release 24

2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
a. Service Rater System Effluent Line (2-R-20i 2-R-28)
3. Continuous Composite Sampler Flow Monitor (1)per train At all times
a. Turbine Building Sump Effluent Line At all times 25
4. Flow Rate Measurement Devices
a. Liquid Radwaste Line(RFI-285)
b. Discharge Pipes*
c. Steam Generator Blowdown Treatment Effluent (2-DFI-35 2)

At times of release At all times At times of release 26 NA 26

  • Pump curves and valve settings may be utilf.@ed to estimate flowt in such cases, Action Statement 26 is not applicable.

D C.

COOK - UNIT 2 3/4 3-54 Amendment No.80

~

~

~

~

~

e' TABLE 4.3-9 Radioactive Gaseous Ef luent Monitorinc Instrumentation Surveillance Requirements Instrument (Instrument ¹)

1. Waste Gas Holdup System Explosive Gas Monitoring System a.

Hydrogen Monitor (QC-31)

b. Oxygen Monitor (QC-31) a.

Oxygen Monitor (Alt. (QC-370)

Channel Check t**

D*%*

D***

Source Check NA NA NA Channel Calibration Q(3)

Q(4)

Q(4)

.Channel Functional Test

2. Condenser Evacuation

'ystem

a. Noble Gas Activity Monitor (SRA-2905)
b. System Effluent Flow Rate (SFR-401, 2-MR-054, SRA-2910)

D*%

D**

NA R (2)

Q(1)

Q W*

3. Auxiliary Building Ventilation System "a. Noble Gas Activity D*

Monitor (VRS-2505)

b. Iodine Sampler (For VRS-2503)
c. Particulate Sampler (For VRS-2501)
d. System Effluent D*

Flow Rate Measurement Device (VFR-315, 2-MR-054, VRS-2510) e.

Sampler Flow Rate D*

Measurement Device (VFS<<2521)

NA NA NA NA R(2)

NA NA

.Q(1)

NA NA

4. Containment Purge System
a. Aux. Building Vent. System Noble Gas Activity D*4 Monitor (VRS-2505)
b. Aux. Building Vent. System Particulate Sampler W**

(For VRS-2501)

NA R(2)

NA Q(X)

NA

5. Waste Gas Holdup System
a. Noble Gas Activity Monitor Providing Alarm & Termination of Gas Decay Tank Release (VRS>>2505)

D. C.

COOK - UNIT 2 3/4 3-62 R(2)

Q(5)

Amendment No.80