ML17324A895

From kanterella
Jump to navigation Jump to search
Forwards Parts I-IV to Rev 1 to Procedures Generation Package, in Response to Draft SER Transmitted by 850912 Ltr & Commitment in 851213 Ltr
ML17324A895
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/16/1986
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17324A896 List:
References
AEP:NRC:0773Q, AEP:NRC:773Q, NUDOCS 8605210249
Download: ML17324A895 (5)


Text

< r

)t / j(

1 ~

REGULATORY INFORMATION ~DISTRIBUTION-SYSTEN <BIDS), "-

ACCESSION NBR: 8605210249 DOC. DATE'6/05/16 NOTARIZED: NO 'OCKET l

FAC IL: 50-315 Donald C. Cook Nuc ear Poiuer P1 anti Uni t ii i Ind ana 8c 05000315 50-316 Donald C. Cook Nuclear Poiiier Plant. Unit 2. Indi ana 0 05000316 AUTH. NANE AUTHOR AFFILIATION ALEXICHi l'f. P. Xndiana 8r Nichigan Electric Co.

REC IP. NANE RECIPIENT AFFILIATION DENTONi H. R. Office of Nuclear Reactor Regulation> Director (post 851125

SUBJECT:

Foruiards Ports I-IV to Rev 1 to "Proced'u>es Generation:

Package. " in response to draft SER transmitted bg 850912 ltr 8c commitment in 851213 ltr.

I ~ ~j DIBTRIBUTION CODE: AOOID COPIEB RECEIVED: LTR ENCL / SIZE:

t TX TLE: OR Sub mi ta l: Qen era 1 Distr i b ut ion NOTES:

I I REC P ENT COPIES REClPI ENT COPIES XD CODE/MANE LTTR E CL ID CODE/NANE LTTR ENCL PWR-A ADTS 1 PWR-A EB P WR-A E ICSB PWR-A FOB PWR-A PD4 PD 01 WIQQINGTONi D PWR-A PSB 0 PWR-A RSB INTERNAL: ADN/LFNB ELD/HDS3 NRR/DHF VTSCB f NRR/GRAS 04 RQN3 EXTERNAL: 24X 1 14 EQ8(Q BRUSKE> S LPDR 03 2 2W NRC PDR 02 1 1+

NSIC 05 TOTAL NUJ"jBER OF COPIES REQUIRED: LTTR 25 ENCL

<> ~ f)i f3.y ' It

$ 4  !

4,"4 r 3

<<'))" lhj

(>>'<<)>4 4

".'* ': 1 ',>> '<<f7'.t4>> '" '.: )'y!3ta<< << '.,'P ('q W I P it/)) '"))I

..f:,j.:,4.',)<<j.<<<<u)" <<<<.)")3; ">>'t)r:<<,') CV';4:<<<<r,.= C'fy>F

<<<<)<<i'4)):r r ). f f,<<

"4 II<<4 I <>., , '-,( ~

f.. .sr<<

Iy 14, fy) tt 4 y yII >>. 4) 4 J

. "It f !, tl,l )3 <<, <<, ~ I f I,Iyp I ~

II f

) Qt' Il 4)

INDIANA 8, M IC H I GAN ELEC TRI C COM PAN Y P.O. BOX 16631 COI UMBUS, OHIO 43216 May 16, 1986 AEP:NRC:0773'onald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 RESPONSE FOR DRAFT SAFETY EVALUATION REPORT ON D. C. COOK PROCEDURES GENERATION PACKAGE Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission D.C. 20555 'ashington,

Dear Mr. Denton:

The purpose of this letter is to respond to the Draft Safety Evaluation Report (DSER) on the Donald C. Cook Nuclear Plant Procedures Generation Package (PGP) transmitted by your letter dated September 12, 1985. This letter fulfills a commitment in our letter AEP:NRC:0773N, dated December 13, 1985. In that letter, we noted that we expected to transmit this information to you about April 30, 1986. Pursuant to discussions with your staff, we were granted an extension for a few weeks beyond that date to allow adequate time for review.

The attachment to this letter, which was prepared with input from Westinghouse Electric Company, is a revised Donald C. Cook Nuclear Plant Procedures Generation Package. For your convenience, all changes from the original version are identified by margin bars.

The Plant Specific-Technical Guidelines (P-STG) are contained in Part I of the PGP. This revision addresses the concerns expressed by your staff in the DSER, Items 2A1 through 2A5.

Part II of the PGP is the Writers Guide for the Emergency Operating Procedures (EOPs). This revision addresses the concerns expressed by your staff in the DSER, Items 2B1 through 2B16 and other changes we found to be necessary.

Part III is the EOP Verification alidation Program description. This revision addresses the concerns expr ssed by your staff in the DSER, Items 2Cl through 2C6.

Part IV is the EOP Training Piogram description. This revision addresses the concerns expressed by your staff in the DSER, Items 2Dl through 2D4.

8605210249 860516 PDR ADOCK 05000315 PDR

Mr. Harold R. Denton AEP:NRC:07730 This document has.been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours

/

M.. Al h pffft~

Vice President ~@3 MPA/rjn Attachment cc: John E. Dolan (w/o attachment)

W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann (w/o attachment)

G. Charnoff (w/o attachment:)

NRC Resident Inspector - Bridgman