ML17324A681
| ML17324A681 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/05/1986 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:0916M, AEP:NRC:916M, NUDOCS 8603110280 | |
| Download: ML17324A681 (8) | |
Text
IC p
- I i'.'/
REGULATORY'OiAFORNATION DISTRIBUTION BY%i'EN (RIDE)
ACCESSIQN NBR; 8603110280 DOC. DATE: 86/03/05 NOTARIZED:
NO DOCKET 0 FACIL: 50-316 Donald C.
Cook Nuclear Power Planti Unit 2i Indiana 8.
05000316 AUTH. NANE
'UTHOR AFFILIATION ALEXICHiN.P.,
Indiana u~ Nichigan Electric Co.
REC IP. NAME RECIPIENT AFFILIATION DENTONi H. R.
Office of Nuclear Reactor Regulation>
Director
<post 851125
SUBJECT:
Responds to 860108 request for addi info re Cycle 6 reload analyses. Requested info will be. transmitted bg Exxon Nuclear Co on 860305. Listed questions currently under review b g Exxon Nuclear Co 5 will be transmitted bg 860315.
DISTRIBUTION CODE:
~
ENCL C3 SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/MANE PNR-A ADTS PNR-* EB PNR-A FOB PNR-A PSB INTERNAL: ADN/LFNB NRR TSCB G FIL 04 COPIES LTTR ENCL RECIPIENT ID CODE/NANE PNR-A PD4 PD 01 PNR-A EICSB NIGGINGTONi D PNR-A RSB ELD/HDS3 NRR/ORAS RGN3 COPIES LTTR ENCL 5
1 1
1 0
0 1
EXTERNAL: 24X LPDR NSIC 03 05 EGZ<G BRUSKEi S NRC PDR 02 TOTAL NUNBER OF DOPIER REQUIRED; LTTR BB ENCL
h h"
II
~ ~
ph I h
DOCKET NO(S).:
50-885/316 t1r. John Dolan, Vice President Indiana and t'Iichigan Electric Company c/o American Electric Power Services Corp.
1 Riverside Plaza
- Columbus, Ohio 43215
SUBJECT:
D. C.
Cook Nuclear Plant, Units 1 and 2 H
'ISTRIBUT Doeke&R-1 NRCPDR Local PDR PltlRA'4 Rdg IIDuncan D>ligginton BJYoungblood rdg The following documents concerning our review of the subject facility are transmitted for your information.
D Notice of Receipt of Application, dated D Draft/Final Environmental Statment, dated D Notice of Availabilityof Draft/Final Environmental Statement, dated D Safety Evaluation Report, or Supplement No.
, dated D Notice of Hearing on Application for Construction Permit, dated D Notice of Consideration of Issuance of Facility Operating License, dated ffzf ~@otice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated March 12 1986 (See pages 8595 and 8608)
D Application and Safety Analysis Report, Volume D Amendment No.
to Application/SAR dated D Construction Permit No. CPPR-D Facility Operating License No.
, Amendment No.
, Amendment No.
dated
, dated D Order Extending Construction Completion Date, dated D Other (Specify)
Enclosures:
As stated Office of Nuclear Reactor Regulation cc: See next page OFSgCe2 SURNAME~
DATE~
NRC FORM 318 (1/841 NRCM 0240
.....P.HR
. glPIHR
.....0th.
i on
~....Q3/..!... /.86.
~ s ~
~ s s
~ ~
(h
". h " h J II rr 'h II I ~
~ r I
'. h hI.
~
h h
~
lhh I ~
'h
(ND(ANA 8 MICHIGAN ELECTRlC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 March 5, 1986 AEP:NRC:0916M Donald C. Cook Nuclear Plant Unit No.
2 Docket No. 50-316 License No. DPR-74 ADDITIONALINFORMATION REQUESTED BY THE REACTOR SYSTEMS BRANCH FOR THE D. C.
COOK UNIT 2 CYCLE 6 RELOAD Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
On January 8,
1986 your staff transmitted to AEPSC a request for additional information related to the Unit 2, Cycle 6 reload analyses.
Specifically, eleven questions were received related to the following documents:
Exxon Re orts XN-NF-85-28, "D. C. Cook Unit 2 Cycle 6 Safety Analysis Report,"
- July, 1985.
2.
XN-NF-85-28(P), Supplement 1, "D. C. Cook, Unit 2 Cycle 6 Safety Analysis Report:
Disposition of Standard Review Plan Chapter 15 Events," October, 1985.
3.
XN-NF-85-64(P), "Plant Transient Analysis for D. C. Cook Unit 2 with 10% Steam Generator Tube Plugging," November, 1985.
4 XN-NF-85-42(P),
"D. C. Cook Unit 2 Cycle 6 Fuel Cycle Design Report," May, 1985.
5.
XN-NF-84-73(P),
"Exxon Nuclear Methodology for Pressurized Water Reactors:
Analysis of Chapter 15 Events," August, 1984.
NRC Corres ondence
- Letter, D. L. Wigginton to John E. Dolan, dated June 18, 1984.
(Amendment No.
64 for D. C. Cook Unit 2 Facility Operating License, including the Safety Evaluation Report for the Unit 2, Cycle 5
reload.)
8603ii0280 8+O1~~,6 PDR ADOCK 050DpOSDRl6 P
I:
e~-gii v~.Q
~.
V I
)
'L
Mr. Harold R. Denton AEP:NRC:0916M The information requested, with the exception of questions numbered 5, 6, 8, 9, and 10 on your January 8,
1986 list, will be transmitted by Exxon Nuclear Company (ENC) on March 5, 1986 via their letter No.
RAC:017:86.
We request that their transmittal be included on our Unit 2 Docket (No. 50-316).
Questions numbered 5, 6, 8, 9, and 10 on the January 8,
1986 list are still under review both at ENC and AEPSC.
Pursuant to discussions with your staff, we currently anticipate the responses to these questions will be transmitted to you by ENC no later than March 15, 1986.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly you MPA/rjn M. P.
A exich f4~
Vice President 41 cc:
John E. Dolan
W. G. Smith, Jr.
Bridgman G. Bruchmann R. C. Callen NRC Resident Inspector - Bridgman G. Ward, Exxon Nuclear Company, Richland WA G, Charnofg