NOTICE OF VIOLATION American Electric Power Service Corporation Indiana and Michigan Power Company Docket No. 50-315 Docket No. 50-316 As a result of the inspection conducted on December 9-12,

1985, and in accordance with the "General 'Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:

Unit 1 and Unit 2 Technical Specification

6. 8. l. a states that written procedures shall be established, implemented,'nd maintained covering among other things, the applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33,
November, 1972.

This requirement is implemented in Procedure 12 THP 6020 LAB.044, "Laboratory equality Assurance,"'(Revision 6, September l2, 1985), that states in part (Section

12. 1):

"A program to assure the reliability of procedural accuracy and individual technician technique will be routinely conducted.

Each relevant procedure will be checked at least quarterly with 'unknowns'."

Contrary to the above requirements, the licensee has not fully implemented this procedure in that:

~

~

~

~

1.

The licensee failed to provide "unknown" samples to check the procedural accuracy in the determination of boron concentrations in reactor systems.

2.

Some technicians have not been checked for performance to assure individual technician technique.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.