ML17321B007
| ML17321B007 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/13/1985 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:0773N, AEP:NRC:773N, NUDOCS 8512170194 | |
| Download: ML17321B007 (4) | |
Text
1
'(
r'"'(...,,A'*,~, "'Eg,
(-. >j!(,
PPQ@ A fQQgg,.JgpggjfgfIQt(t."'D'IICTH)QPQ,IPg,+PTII:I),) '((gl(U Q)',,'('CCESSION NBR: 8512170194 DOC. DATE: 85/12/13 NOTARIZED:
NO DOCKET 0 FACIL:50-315 Donald C.
Cook Nuclear Power Planti Unit ii Indiana 5
05000315 50-316 Donald C.
Cook Nuclear Power Plant. Unit 2.
Indiana 5
05000316 AUTH. NANE AUTHOR AFFILIATION ALEXICH>N. P.
Indiana Sc Michigan Electric Co.
RECIP. NANE RECIPIENT AFFILIATION DENTON> H, R.
Office of Nuclear Reactor Regulati one Director (post 851125
SUBJECT:
Responds to 850912 request for schedule of response to draft SER on procedures generation package. Response (I(ill be submitted bg 860430. Four months required for Mestinghouse to compile ans(Ijers to comments.
DISTRIBUTION CODE:
- 001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
OL: 10/25/74 OL: 12/23/72 05000315 05000316 RECIPIENT ID CODE/NAt'lE PMR-A PD4 PD 01 INTERNAL: ACRS 09 EXD/HDS3 NRR PNR-A EB NRR/DHFT/TBCB BR/J)SRQ/RRAB R QFIL 04 COPIEB LTTR ENCL 6
1 1
1 1
REC IP IENT ID CODE/NANE WIQQINQTONi D ADM/LFl%
NRR BMR EB NRR PNR-B EB NRR/DSRO DIR NRR/ORAS RQN3 COP IEB LTTR ENCL 1
1 1
1 1
EXTERNAL: 24X LPDR NSIC 03 05 EQhQ BRUBKEi S NRC PDR 02
@gg; P~P P g,q t<<.4 S-I(f pp X ~( ff-%v (t 85-6~I W e(<st- (~~~
~g-g~ '((
g5 $
Q~rll<<pc'p Q<<wr yp 0
TOTAL NUIIBER CIP COPIES REQUIRED:
LTTR ~ ENCL
~IN S
h*
D D
II NING hh
'DAg IN 'D T ~ff gghal O'4')
ID+ N
~
th IN,,
NN I
4 b
-'hf u e
Dhq ff P W h
Vtt 4
CN ll 4
4 hhp qt qf
'Da V
ih I
INNhN
)q ~."
ht lh) V th Ntal, fq I
IIV N
h It IiUI.
Ng fhh ff f(ht fqhl hfi I
lf Il NN f'fff N
Iq NN h, NQ 4
fiqflhh If
<<'I'If tg Ng qf Nf I y )'I qhtghfhht'qf ft'll tq N f N
.r f.'
0 Iq q(h'I I
I ffh lq~,
t D
N)C ~ l V
qf t
t
'I I'l Nh',fl fl litt.'
I 1N+
N I It lfV N
~
I ltt I
- hfq, ff h'7HI Il "lhf '3 qh
'f',"fll I'f llq f.j I(
INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 December 13, 1985 AEP:NRC:0773N Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
RESPONSE
SCHEDULE FOR DRAFT SAFETY EVALUATION REPORT ON D. C.
COOK PROCEDURES GENERATION PACKAGE Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
This letter responds to your September 12, 1985 letter in which you requested a schedule of our response to the Draft Safety Evaluation Report (DSER) on the Donald C. Cook Nuclear Plant Procedures Generation Package (PGP).
Our consultant, Westinghouse Electric Corporation, which was responsible for preparing a major part of the initial PGP, has indicated that approximately four months will be required to compile answers to the comments raised in the DSER.
Therefore, please be advised that we plan to submit a response by April 30, 1986 to the DSER comments.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, M. P. Alexich Vice President pl~
cc:
John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector Bridgman 851Z170194 851213 PDR ADQCM 05000315 i
F PDR ADD.
PNR
~BCsa TECH SUPPORT AD J
ENICNT (ItP onl/)
EB (BALLARD)
EICSB (ROSA)
PSB (CNQIILL)
RSB (BERLINCER)
POB (BENAROYA)
I 4
P br
> ~ ~
1
~
~
~
a l,
II