ML17321A902

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Progress Rept Re Overall View & Comparison of Status of Dcrdr W/Status Presented on 850327. Significant Slippage in Overall Schedule Not Anticipated. Program Summary Rept Will Be Submitted by 861231
ML17321A902
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/01/1985
From: Alexion M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0773M, AEP:NRC:773M, NUDOCS 8510080520
Download: ML17321A902 (5)


Text

)(il REGULATVRY~NFORNATIDN DISTR ISUTION ST~EN, (III'DS)

ACCESSXO)Y,. NhR:SSIO'080580,-;ji'"DOC,D+TE,'5/IO/Ol NOTARITED:.IIO

'lDOCKET 0

50-316 Donald C ~

Cook Nuclear Power Planti Unit 28 Indiana 8

05000316 AUTH BYNAME AUTHOR AFFILIATION ALEXION,MDPE Indiana 8 Michigan Electric Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTONEH ~ RE Office of Nuclear Reactor Regulationg Director

SUBJECT:

Forwards semiannual progress rept re overall view L

comparison of status of DCRDR w/status presented on 850327

'ignificant slippage in overall schedule not anticipated.

Pr ogram summar y rept wi 1 1

be submi t ted by 861231, DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE'.

TITLE:

OR Submittal:

General Distribution NOTES:

OL: 10/25/70 OL: 12/23/72 05000315 05000316 RECIPIENT ID CODE/NAME NRR ORB1 BC 01 INTERNAL: ACRS 09 ELD/HDS3 NRR/DL DIR NRR/DL/TSRG NRR/DSI/RAB RGN3 COPIES LTTR ENCL 7

7 6

6 0

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/DRAB METB 04 COPIES LTTR ENCL 1

0 1

1 1

0 1

1 1

1 EXTERNAL: 24X LPDR NSIC 03 05 1

1 2

2 1

1 EGSG BRUSKEgS NRC PDR 02 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 29 ENCL 26

Ei t

gE

/

t II W

ll I i

f

INDIANA8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 October 1, 1985 AEP:NRC:0773M Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2 Docket Nos; 50-315 and 50-316.

L'icense Nos.

DPR-58 and DRP-74 SEMI-ANNUAL PROGRESS REPORT ON DCRDR Mr. Harold R. Denton, Director Office of Nuolear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555"

Dear Mr. Denton:

1 In our September 28, 1984 AEP:NRC:0773I letter we committed to submitting a'emi-annual progress report on our DCRDR program to keep your staff apprised.

Attachment 1 to this letter is a table whioh pr esents an overall view and a-comparison of the current status with the status we presented in Maroh 27, 1985.

We do not anticipate significant slippage in our overall schedule, and we still plan to submit our Program Summary Report and Implementation Schedule by 12/31/86.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, M. P. Alexi Vioe President Ip('~

cm Attachment cc:

John E. Dolan W. G..Smith, Jr. - Bridgman R.

C. Callen G. Bruchmann G. Charnoff NRC"Resident Inspector - Bridgman

\\

85iQ080520 8 PDR ADOCK 0 pD F

ATTACHMENT 1 TO AEP:NRC:0773M D. C.

COOK PLANT DCRDR PROGRESS REPORT 3-30-85 S2epor+

0-30-8Segad+

TASK DESCRIPTION ACTUAL START DATE STATUS ESTIMATE 03/01/85 COMPLETE DATE STATUS 09/01/85 ESTIMATE COMPLETE DATE PHASE I Planned Phase Submit Program Plant Report to NRC 100 100 PHASE II Review Phase Operating Experience Review Control Room Operating Personnel Survey Cook LER Review W Plant's LER Review System Function

& Task Analysis SFTA of Selected Upgraded EOP's I&C Required List I&C Characteristics Required List I&C Characteristics Justification Document Control Room Inventory Control Room Survey Workspace Communications Annunciators Controls Displays Labels

& Location Aids Process Computers Panel Layout Control-Display Integration Verification of Task Performance Capabilities Validation of Control Room Functions 12/15/84 02/01/85 01/21/85 85 75 100

~ 100 50 20 100 100 100 100 100 100 100 100 100 100 85 50 07/01/85 07/01/85 05/01/85 07/01/85 05/01/85 06/01/85 95 100 100 100 100 90 100 100 85 75 100 100 100 100 100 100 100 100 100 100 95 100 11/30/85 11/30/85 11/30/85 11/30/85 10/30/85 06/21/85 Phase III Assessment

& Implementation Phase Assessment Implementation Unit One Enhancements Unit Two Enhancements 01/15/85 01/15/85 2

10 12/31/85 12/31/85 12/31/85 06/01/86 5

22 12/31/85 12/31/85 12/31/85 09/01/86 Phase IV Summary Program Summary Report and Implementation Schedule to NRC 12/31/86 12/31/86 The dates in this column were/are estimated start dates It was/is not possible to assess and pinpoint completion dates at this time.

The percentages represent an estimate, not an exact mathematical counting.

Further, items shown as 100%

complete reflect a

status which may change due to unforeseen requirements.

~