~Aendix NOTICE OF VIOLATION American Electric Power Service Corporation Docket No. 50-315 Docekt No. 50-316 As a result of the inspection conducted on December 22, 1984 through February ll, 1985 and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:
Units 1 and 2
Technical Specification 3.3.3.10.b requires, with less than the minimum number of radioactive gaseous effluent monitoring instrumentation channels
- OPERABLE, take the ACTION shown in Table 3.3-13.
Contrary to the above, with the Unit 1 auxiliary building vent radiation monitor inoperable on November 12, 1984 the applicable ACTION 28 of Table-3.3-13 (Item 3.a) was not complied with, in that required grab samples were not taken and analyzed within eight hours, but were completed after eight hours and 36 minutes.
'Also contrary to the above, with the Unit 1 and Unit 2 hydrogen monitor inoper-able 'on November 29, 1984, the applicable ACTION 30 of Table 3.3-13 (Item l.a) was not complied with, in that required grab samples were not taken and analyzed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, but were completed after 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and eight minutes.
Each event was repetitive of a previous occurrence, the first example duplicat-ing an event of November 8, 1984 and the second duplicating an event of May 4,'984.
The second example applies to both Units.
This is a Severity Level IV Noncompliance (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance:
(1) "corrective action taken and the results achieved; (2) corrective action to be taken to i avoid further noncompliance; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
FFB gP '885 Dated D. Shafer, ief Reactor Projec s Branch 2
8503190127 850227 PDR ADQCK 05000315 9