January 24, 1985 a
MEMORANDUM FOR:
FROM:
Victor Benaroya, Chief Chemical Engineering Branch Division of Engineering Steven A. Varga, Chief Operating Reactors Branch 81 Division of Licensing Distrsbutson NRC-PDII LPDR PMB+
8 Memo file arrish EReeves KJohnston DWigginton SVarga
SUBJECT:
PRIORITY OF SAFETY EVALUATIONS FOR D. C.
COOK AND FARLEY By letter dated December 18, 1984, Division of Licensing management requested, as an NRR demonstration to show that the backlog of multi-plant, TMI, and plant specific actions could be completed in a timely manner, that six plants, including D.
C.
Cook and Farley, be chosen to complete 75$ of their actions, open prior to July I, 1984, by July 1, 1985.
To achieve this goal, it was requested that reviews for these plants be given priority over similar reviews for other operating reactors unless there were overriding safety issues.
Enclosed in the memo were the lists of open items for each plant and their completion schedule.
It was requested that the division evaluate the dates for actions under their cognizance and advise us as soon as possible of any schedular impacts or problems that they might have.
At this time we have received few responses to this request.
It is necessary that we receive your response so that we can establish schedules that reflect our mutual goals.
Enclosed are the lists of remaining open items for review by your branch for Farley and D. C. Cook.
Included on each list is the "SE Input Date" which is the date DL requires your staff's input in order to meet the goal of completing 75% of the open items.
In addition, where requests for additional information (RAI) have been received or are forthcoming from the review
- branch, a date is listed in the "RAI Date" column.
If there is a targeted licensee response date it is listed in the "RAI Response Date" column.
Where no dates are shown in these
- columns, we are not aware of any forthcoming RAI's or response targets.
Please include in your review, where appropriate, projected dates for RAI's and needed licensee response'ates to meet the projected "SER Input Date."
Some of these dates have been negotiated by the PM's, others have not.
Please respond on the enclosed listing and return a copy as soon as possible so that we may adjust schedules as necessary.
Your contacts for Farley and D.
C.
Cook are Ed Reeves (X27386) and Dave Wigginton (X27354) respectively.
Sincerely, t
8502040469 850i24 PDR
- DOCK 050003i5 P
PDR Steven A. Varga, Chief Operating Reactors Branch Pl Division of Licensing
Enclosure:
As stated ORB81: DL KJohnsto s
Ol/>g/85 ORB 1:DL DWigginton 01/ ~85
+/l-+
eves
/85 R gl:DL a
01/
85
I W WF
( m.
II h ~
~ I I
II H
I m
HH I
h tf ll
,ji FEI Ht ll h
a E
f>>
I
)) Ht f
~ 'h I
I t
+If lf (lt H
F >>Em ffl H
I Htf 'Ht((
fl
'I I
F
,'I hit HH I
H I
I H
'll l
I(l'h (FH HW
'l I'"
I H h
I I~
Il I
jll I
~ I
("
F tj F ~ F( F
'H lfj
'I
>>I
~
l litt H
h
'I ~ H,l
'I ~
~ E
~
fl If
'lm) f m '> l '('
~ I (i
H I
t l
>>'I lj t
m
CHEMICAL ENGINEERING BRANCH TAC NO.
RESPONSE
INPUT DATE DATE D.C.
COOK 1
43523 Equipment Survivability: Hydrogen Burn 8/15/84 2/7/85T 3/1/85 44433 F-12 Post Accident Sampling Modifications 1/1/85 D.C.
COOK 2 43524 Equipment Survivability: Hydrogen Burn 8/15/84 2/7/85T 3/1/85 44434 F-12 Post Accident Sampling Modifications 1/1/85