Engineering
review of procedures
to assure
Technical Specification.
compliance with priority placed
on containment integrity, Auxiliary
and
ECC Systems.
Approximately 50 target procedures
are
to be reviewed in two months.
Independent
corporate
review of plant operations
to ensure
adherence
to procedures
and consistency
of procedures
in implementing the
Technical Specifications.
Program is to include personnel
from the
corporate
Nuclear Safety and Licensing
and Nuclear Fuel
Management
staffs functioning as the licensee's
own resident inspectors.
Dedicated
assignments
to verify the basis
and reason for each step
~
- 'of a procedure will be made.
.Additional training .is to be 'provided to Shift Technical
Advisors
as to. the basis of safety analysis.
Part of this training will
include indsviduals
being detailed to work in the Nuclear Safety
and
Licensing group for cross-training.
~
I'echnical" Specifications to be reviewed
and revised to allow literal
compliance with them.
Operator'training
on the 'practical
aspects
of system design
arid
relationship to the Technical Specifications.
At the conclusion of the conference,
the licensee
acknowledged
that the
events
have the potential for classification
as
a Category III item of
noncompliance
as described in the Enforcement'olicy.
The
NRC asked
to
be provided additional details of their corrective actions.
I
841@060y3g
PDR AOO<3 84>n9
8
O~OO03~5
pgp
Reviskd 10/30/84