Requests Schedule Be Extended to 840815 for Installation of Fire Protection Matl in Areas Outlined in . Delay Due to Unavailability of Finished Matls to Be Provided by Thermal Science,Inc
ML17321A117
Person / Time
Site: Cook  
Issue date: 06/27/1984
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0692T, AEP:NRC:692T, NUDOCS 8407030238
Download: ML17321A117 (6)


Text

" '

~~

REGULATO INFORMATION DISTRIBUTION STEM (BIDS)

ACCESSION NBR:8407030238 DOCS DATE: 84/06/27 NOTARIZED:

NO FACIL!50 31'5. Donald C,

Cook Nuclear power 'Plant< Unit 1E Indiana It 50 316 Donald CD Cook Nuclear Po'wer Planti Unit 2< Indiana 8

AUTH

BYNAME, AUTHOR AFFII IATION ALEXICH~N,P, Indiana L Michigan Electric Co, REC IP ~ NAME REC IP IENT AFFII.IATION DENTONEH ~R.'ffice of Nuclear Reactor Regulationi Director DOCKET ¹ 05000315 05000316

SUBJECT:

Requests schedule be extended to 840815 for installation of fire protection matl in areas outlined in 8/0608 l,tr..

Delay due.to,unavailability of finished matls -to be provided by Thermal Scienceilnc

~

DISTRIBUTION CODE:

AOOSS COPIES RECEIVED:LTR ENCL SIZE:

TITLE,'; OR'ubmi ttal: Fire. Pr otecti on NOTES'L

~ 1 0/25/74 OL:12/23/72 05000315 05000316 h'EC IP IENT IO CODE/NAME NRR ORB 1, BC 01 INTERNAL: ELD/HOS3" IE/WHITNEYt L NRR NAMBACH NRR/DL DIR RGN3

'COPIES LTTR ENCL RECIPIENT IO CODE/NAME

,06 NRR FIORAVANT07 EB 09 REG-ILE 04 COPiE.'S LTTR ENCL 1'2 2

1 EXTERNAL: ACRS QRC PDR NTIS 11 02" I.POR iVSIC 03 05

'TOTAL NUMBER OF COPIES REQUIRED:'TTR 22 ENCL 0

<<)

r 'r<< I r '><<1L

~ <<II

,r< ir tr t<<lr, iy t

~

~

O 0 I

'<<w I

<<t,)y f I< Q t<<r) I ill<<

,I

'<<I I fr<<'l

'1

<<'<< lr.

I'

<<""(1

}(g

<<'r (I~Dr I <<I g II

,)

L

(}g r<<J,P-0 ~

, r I r, '

) ),;

.':.t1 rh

~

~

l T'(i, 0

,, )JX'> t.,

)

<<'<<l,e I treI tf<<t "rl

(

<<l C

t>ryrl I' f (r<<$

'I f<.~

r o<<II;,irli}

Ilf gati t Xr.<<)q e) )(r., <<((qc',.f",n I sr<<(tn t 9 y~ jr<<w i nw i } }('

i ~re <'rt v(<<' L<<of

~c. I'-r""

Ir I Igryp I

I ') I 1.

,p'IJ ~

I >~ I g'

)

P, t I y('Ig

<<" r<<Ill() "I 'r'(>>

I'J<<<<I It<</Ter r1 ~f tg>/fry r ] 'J'ltd

~ I( t t tr(l )Il (r

't(r o "t(

I,t '

>r'I' t

)Tc';

<<I g

~

INDIANA8 NICHIGAN ELECTRIC CONPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 June"27, 1984 AEP:NRC:0692T Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 MODIFICATION TO AEP:NRC:0692Q Mr. Harold R. Denton, Director Off1ce of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

Our letter dated June 8, 1984 (AEP:NRC:0692Q) discussed delays in the delivery of Thermal Science Incorporat'ed (TSI) materials from the manufacturer.

Because of subsequent delays in these deliveries, we feel that we now need until August 15, 1984, to complete, the installation of the fire protection material in 'those areas outl1ned 1n our June 8, 1984 letter.

The delay from June 20, 1984, to the middle of August is the direct result of the inability of the vendor to supply the material in adequate quantities and of the proper quality.

We continue to expedite the fabricat1on and delivery of these materials through constant surve1llance of the fabrication process and by using our own drivers and rental trucks to transport the mater1al from the supplier to the Cook Plant.

Thus far, our vendor has had difficulty meeting h1s scheduled commitments due to unavailability of finished materials.

This has been especially true over the past few months.

We are currently short approximately 38 sheets of this material whioh 1s requir ed to complete items related to the June 20,

1984, commitment date.

We bel1eve that the request to complete the installation by August 15,

1984, 1s a conservative request based on the current situation. It is our intention to oontinue to expedite the installation process as materials arrive.
However, should the vendor fail to supply sufficient quantities or a proper quality material in a reasonable time frame, we w1ll advise you accordingly.

8407030238 840627.

PDR'ADOCK'5000315 F,

PDR

Q

~

~

V 7

a

Mr. Harold R. Denton AEP:NRC:0692T This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signatur e by the undersigned.

Very truly yours, P; Alexich Vice President th Attachment cc: John E. Dolan M. G. Smith, Jr. - Bridgman R.

C. Callen G. Charnoff E.

R. Swanson, NRC'Resident Inspector - Bridgman

,g I r

~

~