REGULATOf INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:8406260148 DOC ~ DATE! 84/06/20 NOTARIZED!.NO.
FACIL:50 315 Donald C.
Cook Nuclear Power Planti Unj t li Indiana L
50"316 Donald C ~
Cook Nuc'lear Power Pl anti Uni t 2i Indiana 8
AUTH'AME AUTHOR AFFILIATION SMI THi[I ~ G ~
Indiana 8 Michigan Electric Co+"
RECIP NAME RECIPIENT AFFILIATION DENTONiH ~ RE Office of Nuclear Reactor Regulationi Director
SUBJECT:
Submits request for schedular exemption from 10CFR50iApp R
mods for listed items,Matl delivery problems will cause completion of several App R design changes beyond 840620
'ISTRIBUTION COOK:
A006S COPIES RECEIVED: LTR
" ENCL SIZE!
-TITLE! OR Submittal: Fire Protection NOTKS:
DOCKET 05000315 05000316 RECIPIENT ID CODE/NAME NRR ORB1 BC 01 INTERNAL'. ELD/HDS3 IE/WHITNEYi L NRR WAMBACH NRR/DL DIR RGN3 COPIES LTTR ENCL RECIPIENT ID CODE/NAME 06 NRR FIORAVANT07 B
09 04 COPIES LTTR ENCL EXTERNALS ACRS NRC PDR NTIS 11 02 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 0
lr R
~
v<<)
0 k(rg j ';I
- ~ v h
ht
~ c's s
') s 1 > )
h e
~
'r S
R vs'tk S
Sh f, h(,')
grip',
I
~
R I* R
~ ((he s f
R f;-t(vt'tf l) 's
(<<
srigS 0
<<S tl"k<<
r; I<<
h y P
<< t <<tk R f <<<<
f
~
t r
'(<<I has f)'
')
ht~h I l,th W
I v I'
u lh R
((
I k
V I
,(,
S) lr y
1RR I ~ Ir tt Tl R
R
'l hl hhtl I
R
<<k
0 (j me&en lactrla
~
wmwea s mceleAu Elscmle cOeaaer DONALDC. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 Donal C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 REQUEST FOR SCHEDULAR EXEMPTION, APPENDIX R MODIFICATIONS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 June 20, 1984 AEP: NRC: 0692 S
Reference:
ISMECO Letter No. AEP:NRC:0692Q dated June 8, 1984
Dear Mr. Denton:
This letter is in reference to the modifications being performed at the Donald C.
Cook Nuclear Plant relative to the requirements of Appendix R of 10 CFR 50.
The Donald C.
Cook Nuclear Plant is nearing the completion of the Appendix R work which is required to be finished 6 months after the SER was issued.
AEPSC letter serial AEP:NRC:0692( dated June 8, 1984 reported to the NRC material de-livery problems which will cause the completion of several Appendix R design changes to be delayed beyond June 20, 1984.
There are some additional items which should be brought to your attention:
The installation of the fire doors to the Unit iII1 and Unit 82 charging pump rooms, the installation of fire seals and stops, and the instal-lation of cable and conduit cable tray.fire wraps (where material is available) are scheduled to complete June 20, 1984.
The review of the docamentation'nd release'.of'-the..new,i.nstallations'.for unrestricted operat-ion will be completed onor about June 23, 1984.
The operational (final) test of the fire sprinkler system is scheduled to start June 20, 1984.
The review of the documentation and re1ease of the new system for unrestricted operation will be completed on or about June 25, ]984.
The production work and the testing for two other projects have been completed and the review of the associated documentation is in progress.
The projects are (1) the installation of additional fire detectors (pyro-alarms) and (2) the installation of fire dampers in the East RHR Pump Room, the West RHR Pump
- Room, and the West Centrifugal Charging Pump Room.
Release of the new installations for unrestricted operation will be com-pleted on or about June 25, 1984 and June 23, 1984, respectively.
All other Appendix R work due no later than June 20, 1984 has been completed.
8406260148 840620 PDR ADOCK 05000315 F
Mr. Haro]d D. Denton AEP:NRC:0692S Due to unusual circumstances and the need to submit this letter immediately, normal corporate procedures have been bypassed.
This letter will be subjected to a corporate review at a later date.
Very truly yours, W.
G. Smith, Jr.
Plant Manager WGS:bbf cc: