ML17319B552

From kanterella
Jump to navigation Jump to search
Amends 59 & 42 to Licenses DPR-58 & DPR-74,respectively, Revising Tech Specs to Reflect Installation or Replacement of Valves to Promote Improved Operation
ML17319B552
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/09/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17319B553 List:
References
NUDOCS 8210050541
Download: ML17319B552 (26)


Text

tiS RECy 0

~ i~i

+>>**>>

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET NO. 50-315 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 59 License No.

DPR-58 l.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Indiana and Mic'higan Electric Company {the licensee) dated July 13, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance

('i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E,

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

82i005054l 820909 PDR ADQCK 050003%5 p

PDR

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this 1icense amendment, and par'agraph 2.C. (2) of facility Operating License No. DPR-58 is hereby amended to read as follows:

(2)

Techni ca 1 Speci ficat ions The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 59, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

fOR THE NUCLEAR REGULATORY COMMISSION Attachment':

'hanges to the Technical

'pecifications even A. Varga, Chief J

Operating Reactors Branch gl Division of Licensing Date of Issuance:

September 9,

1982

ATTACHMENT TO LICENSE'AMENDMENT AMENDMENT NO. 59 TO FACILITY OPERATING'LICENSE'NO:

DPR-58 DOCKET NO. 50-315 Revise Appendix A as follows:

Remove Pa es 3/4 6-17 3/4 6-18 3/4 6-19 3/4 6-20 3/4 6-21 3/4 6-22 Insert Pa es 3/4 6-17 3/4 6-18 3/4 6-19 3/4 6-20 3/4 6-21 3/4 6-22

O et Cll Vl ELl lD 0

~

O

~I O

C/l IDA

~

- n Ql

~ cf Ao0 OCt al ID O

C C+

fD 5

I tD Ol fO 5

iD 0)

ECI Cl Cl Cl 4J I

C+

O TABLE 3.6-1 (Continued VALVE NUMBER FUNCTION TESTABLE DURING PLANT OPERATION A.

PIIASE "A" ISOLATION (Continued 27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

li2 ~

43.

44.

45.

46.

47.

48.

49.

50.

51.

52.

53.

54.

55.

56.

57.

58.

59.

60.

61.

62.

ECR-10 ECR-11 ECR-12 ECR-13 ECR-14 ECR-15 ECR-16 ECR-17 ECR-18 ECR-19 ECR-.20 ECR-21 ECR-22 ECR-23 I?CR-24 ECR-25 ECR-26 ECR-27 ECR-28 ECR-29 ECR-416 ECR-417 ECR"496

~ ECR-497 ECR-535 ECR-536 GCR-301 GCR-314 ICR-5 ICR-6 MCR-251 MCR-252 MCR-253 MCR-254i NCR-105 NCR-106 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yea Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Cont.

H2 Sample Return Cont.

H2 Sample Air to Rec.

E Cont.

I12 Sample Air from Rec.

E Cont.

II2 Sample - Low. Cont. Vol.

Cont.

I)2 Sample Low. Cont. Vol.

Cont.

II2 Sample Up Cont. Vol.

Cont.

II2 Sample Up Cont. Vol.

Cont.

II2 Sample Air to Rec.

W Cont.

II2 Sample Air from Rec.

W Cont.

)l2 Sample Cont.

Dome Vol.

Cont.

II2 Sample Return Cont.

)!2 Sample Air to Rec. E.

Cont.

II2 Sample Air fr. Rec.

E Cont.

II2 Sample Low Cont. Vol.

Cont.

Il2 Sample Low Cont. Vol.

Cont.

II2 Sample Up Cont. Vol.

Cont.

ll2 Sample Up Cont. Vol.

Cont.

II2 Sample Air to Rec.

W.

Cont.

ll2 Sample - Air Fr. Rec.

W.

Cont..

II2 Sample - Cont.

Dome Vol.

PAS Containment Sump Sample PAS Containment Sump Sample PAS Waste Liquid and Gas Return PAS Waste Liquid and Gas Return PAS Containment Gas Sample

)'S Containment Gas Sample N

Supply to Pressurizer Relief Tank H

Supply to Accumulators Accumulators Sample Accumulators Sample Sample Line from Steam Gen. Outlet 8)

Sample Line from Steam Gen. Outlet 82 Sample I.ine from Steam Gen. Outlet i(3 Sample Line form Steam Gen. Outlet 84 Ilot Leg Sample llot Leg Sample ISOLATION TIME IH SECONDS

,10

.ln 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 1'n 10 10 ld'0

)'6'0 10

OCc+" M~

C/1 fD O

0 C/l cr lD O~e O

Ql C+

Mo O

O C+

Cl tD ED C+

Mo CD C+

Ao C+

rD lD ~

CQ ID C

A7 Cl cl n

n C3O I

M 4

r 00 m

O TABI.E 3.6-1 (continued VAI.VL'UMBER FUNCTION TESTABLE DURING ISOLATION TIME PLANT OPERATION IN SECONDS A.

Continued 63.

64.

65.

66.

67.

68.

69.

70.

71.

72.

73.

74.

75.

76.

77.

78.

79.

80.

81.

82.

83.

HCR-107 HCR-108 NCR-109 NCR-110 NCR-252 QCM-250 QCM-350 QCR-300 QCR-301 QCR-919 QCR-920 RCR-100 RCR-101 VCR-10 VCR-11 VCR-20 VCR'-21 XCR-100 XCR-101 XCR-102 XCR-103 Cavity Cavity Yes Yes Yes Yes Yes No No No No Yes Yes Yes Yes Yes Yes Yes Yes No No No Ho 10 10 10 10 10 15 15 10 10 10 10 10 10 10 10 10 10 10 10 10 10 B. PIIASE "B" ISOLATION l.

2.

3 ~

4.

5.

6.

7.

8.

9.

10.

11.

CCM-451 CCM-452 CCM"453 CCM-454 CCM-458".

CCM-459 ECR-31 L'CR-32 ECR-33 ECR-35 L'CR-36 CCW from RCP Oil Coolers CCW from RCP Oil Coolers CCW from RCP Tlrermal Barrier CCW from RCP Thermal Barrier CCW to RCP Oil Coolers 6 Thermal Barrier CCW to RCP Oil Coolers 6 Thermal Barrier Containment Airborne Radiation Monitor Containment. Airborne Radiation Monitor Containment Airborne Radiation Monitor Containment Airborne Radiation Monitor Containment Airborne Radiation Monitor No No No No No No Ho No No Ho No 60 60 30 30 60 6o jo 10 10 10 10 PRZ Liquid Sample PRZ Liquid Sample PRZ Steam Sample PRZ Steam Sample Primary Water to Pressure Relief Tank RCP Seal Water Discharge RCP Seal Water Discharge Letdown to Letdown llx.

l.etdown to Letdown IIx.

Demineralized Water Supply for Refueling Demineralized Water Supply for Refueling PRZ Relief Tank to Gas Anal.

PRZ Relief Tank to Gas Anal.

Glycol Supply to Fan Cooler Glycol Supply to Fan Cooler Glycol Supply from Fan Cooler Glycol Supply from Fan Cooler Control Air to Containment Control Air to Containment Isolation.

Control Air to Containment Isolation Control Air to Containment tg, l :

. r0

~

~

k A' f",

~ 4AL l LA8 4

4

,1 ~

TABLE 3.6-1 (Continued)

VALVE NUMBER FUNCTION TESTABLE DURING ISOLATION TIME PLANT OPERATION IN SECONDS B.

PHASE "B" ISOLATION Continued 12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

WCR-901 WCR-903 WCR-905 WCR-907 WCR-909 WCR-911 WCR-913 WCR-915 WCR-921 WCR-923 WCR-925 WCR-927 WCR-929 WCR-931 WCR-933 WCR-935 WCR-941 WCR-942 WCR-943 WCR-944 WCR-945 WCR-946 WCR-947 WCR-948 WCR-951 WCR-952 WCR-953 WCR-954 WCR-955 WCR-956 WCR-957 WCR-958 HESW NESW HESW NESW HESW HESW NESW NESW HESW NESW NESW HESW HESW HESW HESW HESW HESW NESW NESW HESW HESW HESW HESW HESW HESW NESW HESW NESW NESW HESW HESW NESW to Low Containment Vent 81 from Low Containment Vent Nl to Low Containment Vent It2 from Low Containment Vent 82 to Low Containment Vent t3 from Low Containment Vent It3 to Low Containment Vent 84 from Low Containment Vent 84 to Up Containment Vent 81 from Up'ontainment Vent 81 to Up Containment Vent tI2 from Up Containment Vent 82 to Up Containment Vent 83 from Up Containment Vent 83 to Up Containment Vent 84 from Up Containment Vent 84 to RCP Motor Air Cooler to RCP Motor Air Cooler to RCP Motor Air Cooler to RCP Hotor Air Cooler from RCP Motor Air Cooler from RCP Hotor Air Cooler from RCP Motor Air Cooler from RCP Hotor Air Cooler to RCP Hotor Air Cooler Vent 81 to RCP Motor Air Cooler Vent 82 to RCP Motor Air Cooler Vent d3 to RCP Motor Air Cooler Vent N4 from RCP Motor Air Cooler Vent Nl from RCP Hotor Air Cooler Vent N2 from RCP Hotor Air Cooler Vent 83 from RCP Hotor Air Cooler Vent 84 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 I'

~r

TABLF. 3.6-1 (Continued)

OCc+

$1I Vl teal A)

~

lD O

A Vl o

fDA

~ W

~o A

~ &

c+

O O

lb C+

C7 C)

C)

I PO C)

VALVE NUNBER FUNCTION TESTABLE DURING PLANT OPERATION 44.

45.

46.

47.

48.

49.

50.

51.

52.

53.

54, 55.

56.

57.

58,.

59.

60.

61.

62.

63.

64.

65.

66.

67.

PHASE "B" ISOLATION (Continued)

WCR-961 WCR-963 MCR-965 MCR-967 WCR-900 MCR-902 WCR-904 WCR-906 WCR-908 WCR-910 WCR-912 MCR-914 MCR-920 WCR-922 WCR-924 WCR-926 WCR-928 WCR-930 WCR-932 WCR-934 WCR-960 WCR-962 WCR-964 WCR-966 NESW to Instr.

Rm. East Vent NESW from Instr.

Rm. West Vent NESW to Instr.

Rm. East Vent NESM from Instr.

Rm. West Vent NESW to RCP Lower Containment Vent t'1 NESW from Lower Containment Vent t'1 NESW to RCP Lower Containment Vent P2 NESW from Lower Containment Vent 82 NESW to RCP Lower Containment Vent 83 HESM from Lower Containment Vent 83 NESW to RCP Lower Containment Vent f/4 NESW from Lower Containment Vent Il4 NESW to RCP Upper Containment Vent I.'1 NESW from Upper Containment Vent 01 NESM to RCP Upper Containment Vent 82 HESW from Upper Containment Vent 82 NESW to RCP Upper Containment Vent P3 NESW from Upper Containment Vent I'I3 NESW to RCP Upper Containment Vent Pi4 HESM from Upper Containment Vent tI4 NESW to Instrument Room East Vent HESW from Instrument Room East Vent NESW to Instrument Room West Vent HESM from Instrument Room West Vent Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes ISOLATION TINE IN SECONDS 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 C.

COHTAINNEHT PURGE AHD EXllAUST cD CD FO 5lb

$D EQ O

CJl cD l.

'2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

VCR-101 VCR-102 VCR-103 VCR-104 VCR-105 VCR-106"-

VCR-107*

VCR-201 VCR-202 VCR-203 VCR-204 Instr.

Room Instr.

Room Lower Comp.

Lower Comp.

Upper Comp.

Upper Comp.

Cont. Press Instr.

Room Instr.

Room Lower Comp.

Lower Comp.

Purge Air Inlet Purge Air Outlet Purge Air Inlet Purge Air Outlet Purge Air Inlet Purge Air Outlet

. Relief Fan Isolation Purge Air Inlet Purge Air Outlet Purge Air Inlet Purge Air Outlet Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

O lo Al Ol CO CA

~

(Do

~o O

QI CD VALVE NUHBER FUNCTION TABLE 3.6-1 (Continued)

TESTABLE DURING PLANT OPERATION ISOLATION TIHE I'.i SECONDS C/J O

AI O

O Al OD Z

~e AI AIA C

C+

Al CD 5

CA CO CQ s

CA CD CCI C)

CD CD Ol FO O

C.

CONTAINHENT PURGE EX1lAUST (Continued) 12.

VCR-205 13.

VCR-206 14.

VCR-207*

Upper Comp. Purge Air Inlet Upper Comp. Purge Air Outlet Cont. Press Relief Fan Isolation D. HANUAL ISOI,ATION VALVES 1.

ICH-ill 2.

ICH-129 3.

IQf-250 4.

IQ 1-251 5.

ICH-260 6.

ICH-265 7.

ICH-305 8.

ICH-306 9.

ICH-311 10 'CH-321 ll.

NPX 151 VI 12.

PA 145 13.

SF-151 14.

SF-153 15.

SF-159 16.

SF-160 17.

SI-171 18.

SI-172 R11R to RC Cold l.egs RllR Inlet to Pumps Boron Injection Inlet Boron Injection Inlet Safety Injection Inlet Safety Injection Inlet RNR Suction from Sump RllR Suction from Sump RUR to RC Not Legs RNR to RC Hot Legs Dead Weight Tester Containment Service Air Refueling Water Supply Refueling Water Supply Refueling Cavity Drain to Purification System Refueling Cavity Drain to Purification System Safety Injection Test Line Accumulator Test 1.ine Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes 5

5 5

NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

TABLE 3.6-1 (Continued VAI.VE NUMBER FUNCTION TESTABLE DURING PLANT OPERATION ISOLATION TIME IN SECONDS D. MANUAl. ISOLATION VAI.VES (Continued)

(1) 19.

CCR-440 20.

CCR-441 21.

HCM-221" 22.

HCM-231 23.

CCM-430 24.

CCM-431 25.

CCM-432 26.

CCM-433 27.

SH-8*

SH-10*

29.

SH-4*

30.

SH-6*

CCW from Main Steam Penetration CCW from Main Steam Penetration Main Steam to Auxiliary Feed Pump Main Steam to Auxiliary Feed Pump CCW to East Pressure Equalization Fan CCW from East Pressure Equalization Fan CCW to West Pressure Equalization Fan CCW from West Pre@sure Equalization Fan Upper Containment Sample Upper Containment Sample Instrument Room Sample Instrument Room Sample Yes Yes Ho No Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA HA NA NA NA NA NA NA NA NA Manual Valve-Isolation time not applicable.

(1)

Includes motor operated valves Mhich do not isolate automatically.

May.be opened on an intermittent basis under administrative control.

~ltllREGS

~

(4 Wp,0 t%~

O o."

/p +>>*<<+

1 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET NO. 50-316 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

2 AHENDHEHT TO FACILITY OPERATING LICENSE Amendment No. 42 License No.

DPR-74 l.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

The application for amendment by Indiana and Michigan Electric Company (the licensee) dated July 13, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and ('ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.{2) of Facility Operating License No. DPR-74 is hereby amended to read as follows:

(2)

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

42, are hereby incorporated in the license.

The licensee shall operate the faci lity in accordance with the Technical..

Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR R GULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 9, 1982 Steven A. Varga, Chief Operating Reactors Branch 1

Oivision of Licensing

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.

42 TO FACILITY OPERATING LICENSE NO.

DPR-74 DOCKET NO. 50-316 Revise Appendix A as follows:

Remove Pa es 3/4 6-17*

3/4 6-18 3/4 6-19 3/4 6-20 3/4 6-21 3/4 6-22 3/4 6-23 3/4 6-24 3/4 6-25 3/4 6-26*

3/4 6-29 3/4 6-30 3/4 6-31 3/4 6-32*

Insert Pa es 3/4 6-17*

3/4 6-18 3/4 6-19 3/4 6-20 3/4 6-21 3/4 6-22 3/4 6-23 3/4 6-24 3/4 6-25 3/4 6-26*

3/4 6-29 3/4 6-30 3/4 6-31 3/4 6-32+

  • Included fop convenience

TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIHE

<<0 A.

PHASE "A" ISOLATION (Continued) 25.

OCR-620 26.

OCR-621 27.

ECR-10 28.

ECR-1 1 29.

FCR-12 30.

ECR-13 31.

ECR-14 32 'CR-15 33.

ECR-16 34.

ECR-17 35.

ECR-18 36.

ECR-19 Continuous Ventilation Drain to Holdup Continuous Ventilation Drain to Holdup Cont.

H2 Sample Return Cont.

H2 Sample - Air to Rec.

E Cont.

H2 Sample - Air From Rec.

E Cont.

H2 Sample - Low. Cont. Vol, Cont.

H2 Sample - Low. Cont. Vol.

Cont.

H2 Sample - Up. Cont. Vol.

Cont.

H2 Sample - Up. Cont. Vol.

Cont.

H2 Sample - Air to Rec.

0 font.

H2 Sample - Air from Rec.

H Cont.

H2 Sample - Cont.

Dome Vol.

< 10

< 10

< 10 10

< 10

< 10

< 10

< 10

< 10

< 10

< 10

< 10

TABLE 3.6-1 Continued OC Ql Ul tO O

~r A

VALVE NUMBER FUNCTION COHTAINMEtIT ISOLATION VALVES ISOLATION TIME IN SECONDS h.

PIIASE "A" ISOIATION (Continued) 3 CDO ChAl C+

0

~

~ O O

~~

(D

. CD O

CD 37.

ECR-20 38.

ECR-21 39.

ECR-22 40.

ECR-23 41.

ECR-24 42.

L'CR-25 43.

ECR-26 44.

ECR-27 45.

ECR-28 46.

ECR-29 Cont.

II2 Sample-Return Cont.

II2 Sample - Air to Rec.

E.

Cont.

II2 Sample - Air Fr. Rec.

E.

Cont.

II2 Sample Low. Cont. Vol.

Cont.

I2 Sample Kov. Cont. Vol.

Cont.

II2 Sample Hp. Cont. Vol.

Cont.

II2 Sample - Up. Cont. Vol.

Cont.

II2 Sample Air to Rcc.

W.

Cont.

II2 Sample Air Fr. Rec.

W.

Cont.

II2 Sample Coot.

Dome Vol.

c10 410 c10 clO clO c10 c10 clO c10 clO

~ ~r C

~

I I

CD

'D C+

O 47.

4S.

49.

50.

51.

52.

53.

54.

L'CR-416 ECR-41 7 ECR-496 ECR-497 ECR-535 ECR-536 GCR-301 GCR-314 PAS Containmcnt Sump Sample PAS Containment Sump Sample PAS Waste Liquid and Gas Return PAS Waste Liquid and Gas Return PAS Containment Gas Sample PAS Containmeot Gas Sample ti2 Supply to Pressurizer Relief Tank H2 Supply to Accumulators c10 clO clO clO c10 clO F10 clO

~ ~

. ~ C)

0C Qe eCI lD ln e

+ A lD0m A ao0 7C Qe CA ~

o lDA O

Qef+

O O

C+

CP ~

lD~

lD ~

lDA~ aCI Mo lD

~O Q) ~

FO lD lD tel VALVE HtJHDFR A.

PHASE "A" ISOLATION

. 55.

1CR-5 56.

lCR-6 ttCR-251It flCR-252k 59.

tlCA-253It 60.

ttCA-25qf tlCA-105 tlCR-lO6:

NCA'-lO7 64.

tlCR-108 65.

HCA-109 66.

HCR-lln TAOLE 3.6-1 (Continued)

COtlTAIMlENT ISOLATION VALVES FUNCTION (Contf nued)

Accumulators Sample Accumulators Sample Sample Lfne from Steam Gen. Outlet ttl Sample l.fne from Steam Gen. Outlet 81 Sample Lfne from Steam Gen. Outlet E3 Sample Lfne'rom Steam Gen. Outlet tt4 Ilot Leg Sample Ilot Leg Sample PAZ Lfquid Sample PRZ Lfqufd Sample PAZ Steam Sample PAZ Steam Sample

i. ~

1

~ s ISOLATIOH TINK IH SECONDS c 10 c 10

< 10

< 10

< 10

< 10

< 10

< 10

< 10

.<10

< 10 I ~

~

~ ~

I'r e.

1

(

I 2

O C+

Ql Cl fD A>>

M (D

O M>>

O VALVE NUMBER FUNCTION TABLE 3.6-1 (Continued)

CONTAIAfglHT ISOLATION VALVES ISOLATION TIME IN SECONDS A

Om n

~, 0 O

6>>

C+

Dl o

O C+

CD"4 4 ~

Ofb C+

II&

8 C

C+

Ct Q.

CD B 5

(D O

rt rt lD O Ol M

5 lD C

lD

~>>

CCl A.

PHASE "A" ISOI>>ATIOH Continued) 67.

HCR-252 68.

QCM-250 69.

QCM-350 70.

QCR-300 71.

QCR-301 72.

QCR-919 73.

QCR-920 74.

RCR-100 75.

RCR-101 76.

VCR-10 77.

VCR-11 78.

VCR-20 79.

VCR-21 8O.

XC<<-,100 81.

XCR-101 Glycol Supply to Fan Cooler Glycol Supply to Fan Cooler Glycol Supply from Fan Cooler Glycol Supply. from Fan Cooler Control Air to Containment Control Air to Containment Isolation Primary Water to Pressurizer Relief Tank RCP Seal Water Discharge RCP Seal Water Discharge Letdown to Letdown Hx.

Letdown to Letdown Nx.

Demin Wtr. Supply for Refueling Cavity Demin Wtr. Supply for Refueling Cavity PRZ Relief Tank to Gas Anal.

PRZ Relief Tank to Gas Anal.

<15 410 410 410 410

<1O 4.10 41O I

~ ~

TABLE 3.6-1 (Continued CONTAINl(ENT ISOLATION VALVES I( ~

VALVE NUMBER FUNCTION ISOLATION TIME IN SECONns A.

P11ASE "A" ISOLATION Continued) 82.

XCR-102 83.

XCR-103 Control Air to Containment Isolation Control Air to Containment

+10

<10 B.

PllASE "B" ISOLATION 1.

CCM-451 2.

CCM-452 3.

CCM-453 4.

CCM-454 5.

CCM-458 6.

CCM-459 7.

ECR-31 8.

ECR-32 9.

ECR-33 10.

ECR-35 11.

ECR-36 CCW from RCP Oil Coolers CCW from RCP Oil Coolers CCW from RCP Thermal Barrier CCW from RCP Thermal Barrier CCW to RCP Oil Coolers

& Thermal Barrier CCW to RCP Oil Coolers

& Thermal Barrier Containment Airborne Rad Monitor Containment Airborne Rad Monitor Containment Airborne Rad Monitor Containment Airborne Rad Monitor Containment Airborne Rad Monitor Z6o

~6o

~30 M30

<60 M60

~10 M10

&10

~10

&10

)I ~

, ((I~

O Cc+ ~i OI CII IO CD

~

CDA

~o A

CD Vl O

CDA Mo A

I+

~o O

O c+

CD CDA ID I+

15.

WCR-907 16.

WCR-909 17.

18.

. 19.

MCR-911 WCR-913 WCR-915 20.

WCR-921 O

21.

22.

23 ~

WCR-923 MCR-925 WCR-927 n

VALVE HlkSER n

B.

PllASE "B" ISOLATION 12.

WCR-901 13.

WCR-903 14.

WCR-905 TABI.E 3.6-1 (Continued COHTAINHENT ISOLATION VALVES FUNCTION Continued NESW to Low. Containment Vent 81 NESM from Low. Containment Vent 81 NESW to Low. Containment Vent 82 HESM from I.ow. Containment Vent 82 NESM to Low..Containment Vent P3 HESM from Low. Containment Vent 83 NESM to Low. Containment Vent 84 NESW from Low Containment Vent ll'4 NESW to Up. Containment Vent ill NESM from Up. Containment Vent 81 NESW to Up. to Containment Vent 82 HESM from Up. Containment Vent 82 ISOLATION TIME IN SECONDS 410 410 410

%10 410

<10 410

<10 K10 410

. a}

O Vl lDA Won Ol Vl O

tD O

'A CCC

'+

0

~o O

C+

CD CD CD C+

O CQ

~s

'C ID CFI

'I C

fg C+

TABLE 3.6-1 (Continued COHTAINMFHT ISOLATION VAI.VES VALVE NUMBFR FUNCTION B. PIIASE "B" ISOLATION Continued) 24.

WCR-929 25.

WCR-931 26.

WCR-933 27.

WCR-935 28.

WCR-941 29.

WCR-942 30.

WCR-943 31.

WCR-944 32.

WCR-945 33.

WCR-946 34.

WCR-947 35.

WCR-948 36.

WCR-951 37.

WCR-952 38.

WCR-953 39.

WCR-954 NESW to Up.'ontainment Vent 83 HESW from Up. Containment Vent i(3 NESW to Up. Containment Vent 84 NESW from Up. Containment Vent P4 NESW to RCP Motor Air Cooler NFSW to RCP Motor Air Cooler NESW to RCP Motor Air Cooler HESW to RCP Motor Air Cooler NESW from RCP Motor Air Coolex HESW from RCP Motor Air Cooler HESW from RCP Motor Air Cooler NESW from RCP Motor Air Cooler HESW to RCP Motor Air Cooler Vent Nl NESW to RCP Motor Air Cooler Vent t2 NESW to RCP Motor Air Cooler Vent t}3 NESW to RCP Motor Air Cooler Vent tI4 ISOLATION TIME IN SECONDS C 10

+10

<10 410

< IO

<10

<IO 410

<10

<10

<10 go

<10

<10

TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VAZ.VES VALVE NUMBER FUNCTION ISOLATION TIME IN SECONDS B.

PIIASE "B" ISOI,ATION Continued 40.

WCR-955 41.

WCR-956 42.

WCR-957 43.

WCR-958 44.

WCR-961 45.

WCR-963 46.

WCR-965 47.

WCR-967 48.

WCR-900 49.

WCR-902 50.

WCR-.904 51.

WCR-906 52.

WCR-908 53.

WCR-910 54.

WCR-912 55.

WCR-914 HESW from RCP Motor Air Cooler Vent 81 HESW from RCP Motor Air Cooler Vent 82 NESW from RCP Motor Air Cooler Vent 83 NESW from RCP Motor Air Cooler Vent 84 HESW to Instr.

Rm. East Vent HESW from Instr.

Rm. West Vent NESW to Instr.

Rm. East Vent HESW from Instr.

Rm. West Vent NESW to RCP I.ower Containment Vent 81 HESW from Lower Containment Vent //1 HESW to RCP Lower Containment Vent 82 NESW from Lower Containment Vent g2 NESW to RCP Lower Containment Vent 83 NESW from Lower Containment Vent 83 NESW to RCP Lower Containment Vent jt4 HESW from Lower Containment Vent 84

<10

<10

<10

<10

<Io

+10

<10

<10

TABLE 3.6-1 (Continued OCrl ~

Qi Vl iO iD

~

Q0 Me0 VALVE NUMBER CONTAIHMFNT ISOLATION VALVES FUHCTION B.

PHASE "6" ISOLATION Continued ISOLATION TIME IN SECOND CA O

iDA Me 0

O O

iD iDn C+

C CD C+

iD Cl ED 56.

WCR-920 57.

WCR-922 58.

WCR-924 59.

WCR-926 60.

WCR-928 61.

WCR-930 62.

WCR-932 63.

WCR-934 64.

WCR-960 65.

WCR-962 66.

WCR-964 6)7.

WCR-966 NESW to RCP Upper Containment Vent Nl NESW from Upper Containment Vent 81 NESW to RCP Upper Containment Vent 82 HESW from Upper Containment Vent 82 NESW-.to RCP Upper Containment Vent 83 NESW from Upper Containment Vent 83 NESW to RCP Upper Containment Vent 84 NESW from Upper Containment Vent P4 NESW to Instrument Room East Vent NESW from Instrument Room East Vent HESW to Instrument Room West Vent HFSW from Instrument Room West Vent

<10

<10 (10 (10 (10 C.

CONTAINMENT PURGE AND EXHAUST ID CO CD tD We iO E+

O l.

VCR-101 2.

VCR-102 3.

VCR-103 4i.

VCR-104 5.

VCR-105 Instr.

Room Purge Air Inlet Instr.

Room Purge Air Outlet Lower Comp. Purge Air Inlet Lower Comp. Purge Air Outlet Upper Comp. Purge Air Inlet (5

+5 i(5 (5

O C+

Ol Qllb TABLE 3.6-1 (Continued)

CONTAIHNENT ISOLATION VALVES n

CD CD VALVE NUMBER FUNCTION ISOLATION TINE IN SECONDS lo A

OI C+

O O

6.

VCR-106 7.

VCR-107*

G.

VCR-201 9.

VCR-202 10.

VCR-203 11.

VCB-204 12.

VCR-205 13 'CR-206 14.

VCR-207" D.

HANUAL ISOLATION VALVES Upper Comp.

Purge Air Outlet Cont. Press.

Relief Fan Isolation Instr.

Boom Purge Air Inlet Instr.

Room Purge Air Outlet Logier Comp.

Purge Air Inlet Lover Comp.

Purge Air Outlet Upper Upper Comp.

Comp.

Purge Air Outlet Purge Air Outlet Cont.

Press Be 1 ief Fan I sol a tion C.

CONTAIHHEHT PURGE AHD EXHAUST (Continued) 5 5

c 5

c 5

c 5

(

5 c

5 5

5 1.

1CH-111 II 2.

1CH-129 RIIR to BC Cold Legs RNR Inlet to Pumps O

~"

O

~ Ae Vl lDO We O

TABLE 3.6-1 (Continued)

CONTAINMENT ISOI.ATION VALVES Vl O

tD

~

O n

o n

N Q

r+

O Ae0 I

.~e O

E+

ED h

4J tDn C+

Ae C

lD 8

O S

$D O-Q)

~

M CD fD

~e ill VALVL'UMBER Fe e OTIIER Con tinued 18.

PA-243 19.

NPX-151 VI 20.

N-160 21.

SM-1 22.

N-102 23.

SI-171 24.

SI-172 25.

Sl-194 26.

PW-275 27.

CS-321 FUNCTION Service Air to Containment Dead Weight Calibrator N2 to R. C. Drain Tank Air Particle/Radio Gas Detect Return N2 To Accumulators Safety In)ection Test Line Safety Infection Test Line Safety Infection Test Line Primary Wtr. to Pre. Relief Tank R.C.S.

Charging ISOLATION TIME IN SECONDS NA NA NA NA NA NA NA NA NA ee l.-eeI"~

~:

OC CDn O

Qi V)

CDO Wrn Qi O

CD IDA E+

C CD 5

CD CD D

CCl n

C)

C)

Ol I

ID Cl.

CD O

VALVE NUMBER E.

OTllER Continued 28.

SF-152 29.

SF-154 30.

SF-159 31.

SF-160 32.

NSW-417-3 33.

HSW-417-4 34.

H-159 35.

CCW-135 36.

CA-181-H 37.

CA-181-S 38.

SM-8 39.

SM-10 TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VALVES FUNCTION Refueling Wtr. to Refuel. Cavity Refueling Wtr. to Refuel. Cavity Refueling Cavity Drain Refueling Cavity Drain NESW to Instr.

Rm. Vent

'W'ESW to Instr.

Rm. Vent

'E'2 to Prz-Relief Tank CCW to Reactor Supports Weld Channel Supply Air Weld Channel Supply Air Upper Cont. Grab Sample Upper Cont. Grab Sample ISOLATION TIME IN SECONDS NA NA NA NA-NA NA NA NA NA NA NA

OCrt ~~

~ ~

i IDA Mo0 Qt C/lo0)A Jo O

Ol

~e O

lb CDA c+

Wo Cb C+

C+

CD s

C+

A) tD OO s

lD ID C)

ED Fc C+

O io VALVE NUMBER H.

OTllER (Continued 40.

PPP-300 41.

PPP-301 42.

PPP-302 43.

PPP-303 44.

PPA-310 and PPA-311 45.

PPA-312 and PPA-313 46.

Blind Flange 47.

Blind Flange 48.

Blind Flange 49.

Blind Flange 50.

Blind Flange TABLE 3.6-1 (Continued)

CONTAINMENT ISOLATION VALVES FUNCTION Instrument Penetration Instrument Penetration Instrument Penetration Instrument Penetration Instrument Penetration Instrument Penetration Fuel Transfer Penetration Service Air to Containment Ice Condenser Ice Supply Ice Condenser Ice Return In-Core Flux Thimble Access ISOLATION TIME IN SECONDS NA NA NA NA NA NA NA NA NA NA u

~.I

I h"

TABLE 3.6-1 (Continued)

CONTAINMFNT ISOLATION VALVES TABLE NOTATION Hay be opened on an intermittent basis under administrative control.

Not subject to Type "B" or "C" Leak Tests.

NA Check valves, blind flanges on normally closed valves which do not receive containment isolation signals; isolation time not applicable.

(1)

Includes motor operated valves which do not isolate automatically.