REGULATORY INFORMATION DISTRIBUTION "SY t EM
('R IDS)
AOCESSION NBR:8112290345 DOC,DATE: 81/12/23 NOTARI'ZED: NO, DOCKET
.FACILs50"31'5 Donald C ~ Cook'Nuclear Power Pl antP Unit 1P Indiana 8
05000315
'50 316 Donald O ~
Cook Nuclear Power.PlantP 'Unit 2< Indiana 8
05000316
'AUTH BYNAME AUTHOR AFFILIATION HUNTERER ~ SQ
'Indiana 8 Michigan Electric Co ~
)R E~C I P ~ NAME RECIPIENT AFFILIATION DENTONPHQR ~
Office of Nuclear Reactor Regulationi Director
SUBJECT:
Requests "Items II'quipment mal functi DISTRIBUTION CODE:
TITLE! Response to extension for implementation of,NUREG 0737'
~ 3 2P II'QF ~ 1 ~ iilI'O'F 1'3tII' F
1's'6t'8 II'
~ 2 ~'3 due,to Tprocurement pr ob 1 ems 8 unexpected equiipment ons Q
AOA6S iCOPIES iRECEIVED:L'TR (:ENCL, SIZE:.
NUREG '"0737/NUREG 0660 'TMI Action Plan Rgmts (OL's)
NOTES: I8E:3 copies all material.
I8E':3 copies all material.
0500031'5 05000316 RECIPIENT ID CODE/NAME ACTION:
ORB P1 BC 01 INTERNAL: ELD IE/DEP,,D I'R 133
'IE/DEP/EPLB
. NRR/DE/ADCSE '22 NRR/DE/ADSA 17 NRR/DHFS/DEPY29 NRR/DL/ADL 16
.NRR/DL/DRAB 18 NRR/DSI DIR "24 NRR/DS I/ADPS 25 NRR/DS I/RA8 NRR/DST/ADT 32 EXTERNAL: ACRS 34 INPOPJ,'STARNES NRC;PDR 02 NT I'
>COPIES LTTR.ENC 7
1 1
3 1
1 3
,1 1
1 1
10 1
1 1
1 RECIPIENT ID CODE/NAKE IE 12 IE/DEP/EPDB NRR/DE DIR 21 NRR/DE/ADKQE 23 NRR/DHFS,DI'R 28 NRR/DL DIR 14 NRR/DL/ADOR 1'5 NRR/DSI ADRS 27 NRR/DS I/ADGP 31 NRR/DS I/ADRP 26 N
~ IR 30 G FILE 04 FEMA REP D IV LPDR 03 NSIC 05
'COPIES LTiTR ENCL
'2 1
.1 1
1 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED L<TTR:5P;ENCL PI
1 di
INDIANA L MICHIGAN ELECTRIC (:ONPANY P. 0.
BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004 December 23, 1981 AEP:NRC:0652 Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NUREG-0737; ITEMS II.B.3.2, II.F.1.1, II.F.1.3, II.F.1.6, II.F.2.
REQUEST FOR EXTENSION Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
O)g /
This letter requests an extension of time.from the NUREG-0737"--..
mandated implementation dates for the following items: II.B.3.2 (Post-Accident Sampling-Plant Modifications), II.F.l.l (Noble Gas Monitor),
II.F.1.3 (Containment High Range Monitor),
II.F.1.6 (Accident Monitoring-Containment Hydrogen) and II.F.2.3 (Instrumentation for Detection of Inadequate Core Cooling-Installation of Level Instruments).
We are requesting an extension to 30 days after the end
'f the refueling outages in 1982 to complete these items for both Units 1 and 2.
By then we will also have available at the site, for your
- review, the necessary design information.
These refueling outages are currently scheduled for May-June, 1982 (Unit 1) and October-November, 1982 (Unit2).
We have expended considerable resources in trying to meet the implementation dates given in NUREG-0737.
The physical installations of these systems are either complete or very nearly complete.
- However, we need to request this extension due to equipment procurement problems and unexpected equipment malfunctions which may lead t'o design changes or new equipment.
The requested extension should permit us to complete the subject items bringing them to a
fully operational and qualification stage.
Even though our request extends the dates until the upcoming refueling outages, we are proceeding expeditiously to try to complete some of those items as soon as we can.
We fully expect that those items not requiring shutdown of the Units for their completion will be finished well before the requested
- date, provided no new procurement or equipment problems arise.
Po<L S
I b
( Bii2290345 Bii223 PDR ADOCK 050003i5,
, P
~PDRI~
~
~ l 1 ~
~ ~
~
g
~
h H
4
With exception of Item II.F.2.3, the Cook Plant has installed systems which perform functions that, in a limited way, are equivalent to those which the upgraded NUREG-0737 systems would perform.
Specifically, we have in place an interim post-accident sampling
- system, the containment radioactivity levels are monitored in each Unit by three instruments and the hydrogen monitoring system previously existing still remains in place.
These systems will remain functional until the corresponding NUREG-0737 items are in place.
Furthermore, with respect to Item II.F.2.3, there are saturation meters installed and functional at the Cook Plant which can be used to detect the onset of inadequate core cooling conditions.
In 'addition, inadequate core cooling procedures are in place at Cook Plant.
Very truly yours, R. S.
unter Vice President RSH/md cc:
John E. Dolan Columbus R.
W. Jurgensen D. V. Shaller Bridgman R.
C. Callen G. Charnoff Joe Williams, Jr.
Resident Inspector at Cook Plant Bridgman
~(
g4
'1 I~