Responds to NRC Re Violations Noted in IE Insp Repts 50-315/80-21 & 50-316/80-17.Corrective Actions:Mgt Directive Issued Emphasizing Need to Meet Commitment Deadlines & to Notify NRC of Missed Deadlines
ML17319A785
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/02/1981
From: Hunter R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17319A783 List:
References
AEP:NRC:0520, AEP:NRC:520, NUDOCS 8103250175
Download: ML17319A785 (2)


Text

INDIANA I!t MICHIGAN ELECTRIC COMPANY P. O.

BOX 18 BOWLING GR E EN STATION NEW YORK, N. Y. 10004 March 2, 1981 AEP:NRC:0520 Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 IE Reports Nos.

50-315/80-21 and 50-316/80-17 Mr. James G. Keppler, Regional Director U.S.

Nuclear Regulatory Commission Office of Inspection and Enforcement Region III Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter responds to Mr.

R.

F. Heishman's letter of February 4, 1981 transmitting to us IE Report Nos.

50-315/80-21 and 50-316/80-17 for response within twenty-five days.

Appendix A to Mr. Heishman's letter identifies two items, one classified as Severity Level IV and the second calssified as a Severity Level VI violation.

No response is required for the first item.

With respect to the second

item, we wish to point out to you that the technical reasons for not meeting the commitment date of January 1,

1981 were already given to the NRC in our letter AEP:NRC:0300E, which was referenced in the subject Inspection Report.

Our failure to notify the NRC in a timely fashion which resulted in the Severity Level VI violation, has been addressed internally through a management directive.

This directive emphasizes the need to meet commitment deadlines.

The directive also emphasizes the need to notify the NRC of the schedule slippage prior to the original commitment date.

Mr. James G. Keppler 2>>

AEP;NRC:0520 Prior to the issuance of the directive, meetings were held to discuss this item and to develop the major points contained in the directive.

Very truly yours,

) 'l

. i0u R.

S.

Hunter Vice'resident cc:

R.

C. Callen G. Charnoff John E. Dolan R.

W. Jurgensen D. V. Shaller - Bridgman NRC Region III Resident Inspector - Bridgman